First Results from Tracker 1  Cryostat Commissioning  AFE/VLSB Firmware and Readout  Cosmic Ray Setup  Tracker Readout  Software  Trigger Timing.

Slides:



Advertisements
Similar presentations
KEK Test Beam Phase II Plan Makoto Yoshida (Osaka Univ.) MICE FT Daresbury 2005/8/30.
Advertisements

1 Sci Fi Simulation and Reconstruction Status M.Ellis/C.Rogers Wednesday 31 st March 2004.
Tracker Software 1M.Ellis - CM23 - Harbin - 15th January 2009  Four key areas that currently need some work: u Digitisation u Decoding files u Unpacking.
1 Scintillating Fibre Cosmic Ray Test Results Malcolm Ellis Imperial College London Monday 29 th March 2004.
1 Status of Cosmic Analysis Malcolm Ellis Imperial College London Wednesday 10 th March 2004.
Status of the MICE SciFi Simulation Edward McKigney Imperial College London.
1 VLPC system and Cosmic Ray test results M. Ellis Daresbury Tracker Meeting 30 th August 2005.
Prototype Performance in D0 test stand M.Yoshida (Osaka Univ.)
KEK Analysis Report Makoto Yoshida Osaka Univ. 2006/06/10 MICE CM15.
Sci Fi Simulation Status Malcolm Ellis MICE Meeting Osaka, 2 nd August 2004.
1 Online data quality and monitoring M. Ellis Daresbury DAQ Meeting 31 st August 2005.
Linda R. Coney – 24th April 2009 Online Reconstruction & a little about Online Monitoring Linda R. Coney 18 August, 2009.
M. Ellis - 11th February 2004 Sci Fi Cosmic Light Yield 2 views 3 views.
1 Analysis code for KEK Test-Beam M. Ellis Daresbury Tracker Meeting 30 th August 2005.
1 KEK Beam Test Analysis Hideyuki Sakamoto 15 th MICE Collaboration Meeting 10 st June,2006.
The first testing of the CERC and PCB Version II with cosmic rays Catherine Fry Imperial College London CALICE Meeting, CERN 28 th – 29 th June 2004 Prototype.
Cosmic Ray Analysis 1M.Ellis - CM23 - Harbin - 15th January 2009  Not enough time to go into detail, so just a quick summary of the status since CM22:
Prototype Performance in D0 test stand & fiber intrinsic performance with KEK test beam M.Yoshida (Osaka Univ.) Osaka.
1 G4MICE Analysis of KEK Test Beam Aron Fish Malcolm Ellis CM15 10th June 2006.
1Malcolm Ellis - Tracker Meeting - 6th November 2006 Tracker Software  Offline u Modeling u GRID u Tests u Decoding u Kalman fit u Reconstruction & “data.
J. Estrada - Fermilab1 AFEII in the test cryostat at DAB J. Estrada, C. Garcia, B. Hoeneisen, P. Rubinov First VLPC spectrum with the TriP chip Z measurement.
1 Initial Tests of DHC Tower Update - 09/03/2003 Kurt Francis, Donna Kubik - Northern Illinois University.
The Time-of-Flight system of the PAMELA experiment: in-flight performances. Rita Carbone INFN and University of Napoli RICAP ’07, Rome,
Commissioning data are taken with individual chambers TP data autotriggered Cosmic rays data  ( different configuration) Different cosmic track angle.
1M. Ellis - MICE Video Conference - 15th March 2007 Software Report  New G4MICE Users  TOF Simulation and Digitisation  SciFi Reconstruction  Tracker.
Tracker Summary Makoto Yoshida Osaka Univ. MICE Frascati June 28 th, 2005.
1 MICE Tracker Update M. Ellis UKNFIC Meeting 25 th August 2005.
Updates on GEMs characterization with APV electronics K. Gnanvo, N. Liyanage, K. Saenboonruang.
1 SciFi Results and Comparison Malcolm Ellis, for the MICE Scintillating Fibre Group Abingdon, 31 st October 2003.
1 MICE Tracking Detectors Malcolm Ellis NFMCC Meeting 12 th March 2006.
ATLAS Liquid Argon Calorimeter Monitoring & Data Quality Jessica Levêque Centre de Physique des Particules de Marseille ATLAS Liquid Argon Calorimeter.
1M. Ellis - MICE Tracker PC - 19th October 2007 Station QA Analysis (G4MICE)  For details of software see my previous talk here: u
Tracker Summary Alan Bross MICE CM October 10, 2007.
1 MICE Tracker Readout Update, Preparation for Cosmic Ray Tests Cosmic Ray Tests at RAL AFE-IIt Firmware Development VLSB Firmware Development Summary.
1 Software for the KEK test Malcolm Ellis 13 th April 2005.
A First Look at the June Test Beam DAQ Hardware architecture Talk Presented 8 April, 2008 John Anderson HEP Electronics Group Argonne National Laboratory.
1M. Ellis - MICE Tracker Meeting - 12th February 2007 Readout Electronics & DAQ  Introduction  DAQ Spreadsheet u VLSB_DAQ Sheet u Initialisation u Bias.
Status of cosmic-ray test of the SciFi prototype and SciFi software in G4MICE M. Yoshida (Osaka Univ.)
All DØ Meeting, 12/01/00 Central Fiber Tracker Light Guide Performance Thomas Nunnemann Fermilab 90 days before RunII … (a.k.a. 12/01/00)
1M. Ellis - NFMCC - 31st January 2007 MICE Tracker.
Online Reconstruction 1M.Ellis - CM th October 2008.
DAQ Status for cosmic-ray test in RAL Hideyuki Sakamoto MICE Phone meeting 12 th July 2007 Contents Status Setup for cosmic-ray test bench Schedule.
1M. Ellis - 17th May 2007 SciFi Decoding (Everything you never wanted to know but couldn’t avoid going over and over)  VLSB Data (unpacking to AFE, MCM,
1 KEK test-beam software progress Malcolm Ellis MICE Video Conference 4 th May 2005.
1Malcolm Ellis - Tracker Meeting - 28th November 2006 Electronics - Station Acceptance  Hardware: u 1 MICE cryostat with 1 VLPC cassette. u VME crate,
1 A first look at the KEK tracker data with G4MICE Malcolm Ellis 2 nd December 2005.
Linda R. Coney – 5 November 2009 Online Reconstruction Linda R. Coney 5 November 2009.
Tracker Summary Alan Bross MICE CM17 CERN February 25, 2007.
Radioactive source and cosmic-ray test for the MWPC Davide Pinci on behalf of the Frascati-Roma1 MWPC group.
5-9 June 2006Erika Garutti - CALOR CALICE scintillator HCAL commissioning experience and test beam program Erika Garutti On behalf of the CALICE.
(s)T3B Update – Calibration and Temperature Corrections AHCAL meeting– December 13 th 2011 – Hamburg Christian Soldner Max-Planck-Institute for Physics.
Database David Forrest. What database? DBMS: PostgreSQL. Run on dedicated Database server at RAL Need to store information on conditions of detector as.
F Don Lincoln, Fermilab f Fermilab/Boeing Test Results for HiSTE-VI Don Lincoln Fermi National Accelerator Laboratory.
T. Matsushita 1 Scintillating fibre tracker The scintillating fibre tracker reconstructs muon tracks before and after the MICE cooling section in 4 T magnetic.
Detector Summary Tracker. Well, as far as the tracker hardware is concerned, we are done. – Need to do the system test to make sure nothing has degraded.
Analysis for QA (temporary) Hideyuki Sakamoto 1 st October 2007 MICE Tracker Phone Meeting.
1 Light Yield results from the KEK tracker test using G4MICE M. Ellis Tracker Phone Meeting 25 th January 2006.
Muons at CalDet Introduction Track Finder Package ADC Corrections Drift Points Path Length Attenuation Strip-to-Strip Calibration Scintillator Response.
Software Overview 1M. Ellis - CM21 - 7th June 2008  Simulation Status  Reconstruction Status  Unpacking Library  Tracker Data Format  Real Data (DATE)
1 Tracker Software Status M. Ellis MICE Collaboration Meeting 27 th June 2005.
Overview of PHENIX Muon Tracker Data Analysis PHENIX Muon Tracker Muon Tracker Software Muon Tracker Database Muon Event Display Performance Muon Reconstruction.
RD51 GEM Telescope: results from June 2010 test beam and work in progress Matteo Alfonsi on behalf of CERN GDD group and Siena/PISA INFN group.
Tracker Readout Progress Terry Hart, MICE Tracker Meeting, July 29, 2008 Cosmic Ray Readout with 1 st Tracker at RAL 2 nd Tracker Preparation at FNAL Firmware.
Station Acceptance Test. 22/02/2007 M. Takahashi 2 Lab Layout at IC.
1M. Ellis - MICE Tracker PC - 1st October 2007 Station QA Analysis (G4MICE)  Looking at the same data as Hideyuki, but using G4MICE.  Have not yet had.
Development of Multi-pixel photon counters(2) M.Taguchi, T.Nakaya, M.Yokoyama, S.Gomi(kyoto) T.Nakadaira, K.Yoshimura(KEK) for KEKDTP photon sensor group.
20 April 2007MICE Tracker Phone Meeting1 Analysis of cosmic/self-triggerd data of station 5 Hideyuki Sakamoto MICE Tracker Phone Meeting 20 th April 2007.
Requirements for the Software Group (and agreed actions)
Tracker readout, DAQ, C&M and calibration
Tracker Software Status
Presentation transcript:

First Results from Tracker 1  Cryostat Commissioning  AFE/VLSB Firmware and Readout  Cosmic Ray Setup  Tracker Readout  Software  Trigger Timing Scan  Alignment  Light Yield  Next Steps 1M.Ellis - VC th July 2008

Cryostat Commissioning  Both cryostats cooled down very well and reached a temperature that allows all 4 cassettes to operate at 9.0 Kelvin.  The lid heater alarms and VESDA smoke detection system have been hooked up to a relay that will kill the AFE power if any of the three alarm.  An auto-dialler will call an expert (or the MOM) if any of the above alarms occur, or if either of the insulating vacua start to degrade. 2M.Ellis - VC th July 2008

AFE / VLSB Firmware  New AFE and VLSB firmware from Fermilab is being used for the readout.  An additional VLSB is providing an encoded clock signal that is fanned out to all 8 AFE boards.  The readout is operating asynchronously, with the trigger coincidence signal being vetoed by the master VLSB to only allow a trigger to be produced in the correct live windows. 3M.Ellis - VC th July 2008

Cosmic Ray Setup  The 25 waveguides were connected and the cassettes made light tight.  At the moment there is a 2 inch layer of lead under the tracker to act as a momentum filter.  The coincidence of two trigger scintillators (one above the tracker, one underneath the tracker and a layer of lead) provides the external trigger (which is a bit noisy).  Some new trigger scintillators are being prepared at Fermilab which should increase the trigger rate and the trigger efficiency. 4M.Ellis - VC th July 2008

Tracker Readout  At the moment we are using the Excel/Visual Basic DAQ developed at Fermilab.  Hideyuki is working on a Linux based AFE initialisation code.  Once that is working, we will check that the data taken looks the same and start to move to a Linux based AFE initialisation and DATE DAQ for readout. 5M.Ellis - VC th July 2008

Software  The decoding and calibration files have been committed to G4MICE and the necessary unpacking code for the current data format.  A new application – “R8CosmicTest” has been added which reconstructs the data and creates ROOT histograms and event display files for viewing using HepRApp.  All plots in this talk can be reproduced by checking out the most recent version. 6M.Ellis - VC th July 2008

Trigger Timing Scan  Need to get the delay between cosmic ray passage and AFE trigger signal correct at the level of ns.  Scan over a range of delays, take data for a day and find delay with maximum light yield. 7M.Ellis - VC th July 2008

Trigger Timing Scan - Results 8M.Ellis - VC th July 2008 Delay chosen: 862 ns Filled square – station 1 Triangle up – station 2 Triangle down – station 3 Open circle – station 4 Open square – station 5 Light Yield for each Station Average Light Yield for All 5 Stations

Alignment  The alignment started with the nominal values from the tracker design for the station spacing, central fibres, etc.  These were fed into G4MICE and triplet residuals and tracking residuals used to spot any misalignments or inconsistencies. 9M.Ellis - VC th July 2008

Triplet Internal Residuals 10M.Ellis - VC th July 2008 Stations 1 – 4 have residuals centred near 0 with no need for any alignment

Triplet Residuals – Station 5 11M.Ellis - VC th July 2008 Station 5 before adjusting the nominal values Station 5 after adjusting plane X

Station Alignment  Will check station spacing with Coordinate Measuring Machine (CMM) data, but for now assume the spacing is exactly as designed.  At high momentum (i.e. no MCS), expect residuals to have an RMS of ~ 430  m in X and ~ 497  m in Y. 12M.Ellis - VC th July 2008

Track Residuals 13M.Ellis - VC th July 2008 X – expect 430  m, see 466  m RMS Y – expect,497  m, see 549  m RMS Implies misalignments of order 100  m TRD Spec for Tracker alignment: 70  m

Light Yield  Light yield determined by plotting the distribution for each plane and each station (integrating over planes in a station) for clusters that were included in a good track.  Some features (narrow peaks) in the plots for individual planes/stations are due to overflow of the ADC.  Due to variations in the gain of the cassettes, these peaks move around as a function of plane/station. 14M.Ellis - VC th July 2008

Light Yield – All Stations 15M.Ellis - VC th July 2008 Light Yield: ~ 11 PE

Next Steps  Add another layer of lead and continue data taking at the optimum trigger delay.  Use CMM data to update station spacing and possibly transverse positions.  Study light yield and efficiency for each station and each plane, and if sufficient statistics, as a function of position on the plane. 16M.Ellis - VC th July 2008

Finally – 100 Events with 5 point Tracks: 17M.Ellis - VC th July 2008