US Some Preliminary Test Beam Results T. Ferguson, N. Terentiev*, I. Vorobiev CMS EMU Meeting Fermilab Oct 29 - 30, 2004.

Slides:



Advertisements
Similar presentations
Kondo GNANVO Florida Institute of Technology, Melbourne FL.
Advertisements

March 24-28, 2003Computing for High-Energy Physics Configuration Database for BaBar On-line Rainer Bartoldus, Gregory Dubois-Felsmann, Yury Kolomensky,
Slice Test DAQ. Two Systems Underway There are essentially two systems being designed concurrently: Trackfinder test, and EMU slicetest. Goals of the.
Grid and CDB Janusz Martyniak, Imperial College London MICE CM37 Analysis, Software and Reconstruction.
Batch Production and Monte Carlo + CDB work status Janusz Martyniak, Imperial College London MICE CM37 Analysis, Software and Reconstruction.
US FAST site test results – a global view from ROOT T. Ferguson, A. Korytov, N. Terentiev* EMU Meeting University of Florida 01/09/2004.
US Beam Test Results and ORCA validation for CMS EMU CSC front-end electronics N. Terentiev Carnegie Mellon University CMS EMU Meeting, CERN June 18, 2005.
23/04/2008VLVnT08, Toulon, FR, April 2008, M. Stavrianakou, NESTOR-NOA 1 First thoughts for KM3Net on-shore data storage and distribution Facilities VLV.
TMB-RAT Software Update USCMS Slice Test Rice University August 16, 2004 Martin Von der Mey / Yangheng Zheng* University of California, Los.
US CMS Collaboration Meeting, UC Riverside, May 19, Endcap Muons John Layter US CMS Collaboration Meeting May 19, 2001.
US The simple user’s interface for ROOT tree analysis N. Terentiev (Carnegie Mellon University) Fermilab Dec.14, 2004.
US FAST site EMU CSC test results – a global view from ROOT N. Terentiev (Carnegie Mellon University) Fermilab July 23, 2004.
US Test Beam Results Of Front End Timing T. Ferguson, N. Terentiev* (Carnegie Mellon University) CMS EMU Meeting University of California, Davis Feb 25.
US FAST site test results – a global view from ROOT T. Ferguson, A. Korytov, N. Terentiev* EMU Meeting University of Florida 01/09/2004.
US Test beam data analysis & validation of OSCAR/ORCA Tim Cox, UC Davis Nikolai Terentiev*, CMU CMS Physics Week Fermilab Apr , 2005.
9 Sep 2005DAQ - Paul Dauncey1 DAQ/Online Status Paul Dauncey Imperial College London.
Commissioning of CSCs and Peripheral Crates Task L M. Ignatenko UCLA October
Endcap Muon meeting: CMU, Oct 19, 2003 J. Hauser UCLA 1 CSC Trigger Primitives Test Beam Studies Main Test Beam 2003 Goals: Verify the peripheral crate.
US FAST site test results – a global view from ROOT T. Ferguson, A. Korytov, N. Terentiev* CMS EMU Meeting The Ohio State University April 16 – 17, 2004.
Title US-CMS User Facilities Vivian O’Dell US CMS Physics Meeting May 18, 2001.
US Beam Test Results and ORCA validation for CMS EMU CSC front-end electronics N. Terentiev Carnegie Mellon University CMS EMU Meeting, Fermilab October.
1 ME 234/2 HV noise investigation N.Bondar CMU. 12/18/02.
Jay Hauser, Emu meeting at Florida, 9 January CSC Trigger Meeting Summary Cast of many.
US LPC Muon Group CMSSW code development efforts N. Terentiev Carnegie Mellon University CMS EMU Meeting, Florida Institute of Technology February 17-18,
US FAST site test results – a global view from ROOT T. Ferguson, A. Korytov, N. Terentiev* CMS EMU Meeting The Ohio State University April 16 – 17, 2004.
US News from the LPC Muon Group E. James, M. Mulders, N. Terentiev* CMS EMU Meeting University of California, Davis Feb , 2005.
S. Durkin, USCMS-EMU Meeting, Oct. 21, 2005 Critical Data Errors S. Durkin The Ohio State University USCMS EMU Meeting, FNAL, Oct. 20, 2005.
Endcap Integration Workshop: June 11-14, CSC Commissioning Andrey Korytov.
Grid Status - PPDG / Magda / pacman Torre Wenaus BNL U.S. ATLAS Physics and Computing Advisory Panel Review Argonne National Laboratory Oct 30, 2001.
Status of the CSC Track-Finder Darin Acosta University of Florida.
A.Golunov, “Remote operational center for CMS in JINR ”, XXIII International Symposium on Nuclear Electronics and Computing, BULGARIA, VARNA, September,
Barrel RPC Chamber consists of 2 double-gaps, each equipped with a common plane of 96 strips read-out by 6 front-end boards. The two double- gaps have.
EMU Reference Histogram Comparison Unit R. Cavanaugh, V. Barashko, A. Korytov.
Test Beam Wrap-Up Darin Acosta. Darin Acosta, University of Florida 18 June 2004 USCMS Meeting 2 Agenda n Darin/UF: General recap of runs taken, tests.
CMS pixel data quality monitoring Petra Merkel, Purdue University For the CMS Pixel DQM Group Vertex 2008, Sweden.
Online Software 8-July-98 Commissioning Working Group DØ Workshop S. Fuess Objective: Define for you, the customers of the Online system, the products.
T.Y. Ling EMU Meeting CERN, September 20, 2005 Status Summary Off-Chamber Electronics.
CSC Track-Finder Plans for Commissioning at Bat.904 and Point 5 Darin Acosta University of Florida.
4 Dec 2008G. Rakness (UCLA)1 Online Software Updates and RPC data in the RAT …including Pad Bit Mapping and Efficiency… Greg Rakness University of California,
Integration of the ATLAS Tag Database with Data Management and Analysis Components Caitriana Nicholson University of Glasgow 3 rd September 2007 CHEP,
Florida Institute of Technology, Melbourne, FL
Track-Finder Test Beam Results Darin Acosta. Darin Acosta, University of Florida 30 July 2004 Trigger Meeting CSC Beam Test (Muon Slice Test) ME.
Development of the CMS Databases and Interfaces for CMS Experiment: Current Status and Future Plans D.A Oleinik, A.Sh. Petrosyan, R.N.Semenov, I.A. Filozova,
Status & development of the software for CALICE-DAQ Tao Wu On behalf of UK Collaboration.
General Muon Meeting, 03-March-2014 Jay Hauser “Update on Phase 2 muon Technical Proposal”  Recent developments:  ME0 inserted into HGCAL as for other.
7-Nov-08ESSC Nov 2008 > CSC Early Upgrades by Fred B. 1 CSC Early Upgrades Current plans for "early upgrades" and maintenance during 2009 and 2010 Description:
US AFEB timing in CSCs in splash events, run N. Terentiev, CMU CSC Synchronization meeting Nov. 16, 2009, CERN.
1 Update on CompareTFandDMBLCTs.cc Analyzer that compares LCTs read out from the Track Finder (input FIFO) with those read out through the EMU data path.
US ALCT / AFEB Analog Test Results N.Bondar, T.Ferguson, N.Terentiev* EMU Meeting UCLA 01/10/2003.
Markus Frank (CERN) & Albert Puig (UB).  An opportunity (Motivation)  Adopted approach  Implementation specifics  Status  Conclusions 2.
Patrick Gartung 1 CMS 101 Mar 2007 Introduction to the User Analysis Facility (UAF) Patrick Gartung - Fermilab.
1 Calice TB Review DESY 15/6/06D.R. Ward David Ward Post mortem on May’06 DESY running. What’s still needed for DESY analysis? What’s needed for CERN data.
CSC Test Beam 2004 Summary Darin Acosta (For the EMU Collaboration)
1 GlueX Software Oct. 21, 2004 D. Lawrence, JLab.
CMS Week, 3-7 November CSC Trigger Test Beam Report Cast of many.
6 April 2007G. Rakness (UCLA) 1 CSC runs at minus side slice test 27 Mar – 5 Apr Color scheme: Successes Problems/questions Greg Rakness University.
University of Wisconsin
Timing/Synchronization Status
Colliding Beams Group Involvement In CMS (see also M
Large CMS GEM with APV & SRS electronics
University of California Los Angeles
DUCKS – Distributed User-mode Chirp-Knowledgeable Server
ALCT, TMB Status, Peripheral Crate Layout, CSC Event Display
CSC Trigger Primitives Test Beam Studies
TMB and RAT Status Report
CSC Trigger Meeting Summary
Using an Object Oriented Database to Store BaBar's Terabytes
Fred’s Input to Rice Workshop
Plans for the 2004 CSC Beam Test
Presentation transcript:

US Some Preliminary Test Beam Results T. Ferguson, N. Terentiev*, I. Vorobiev CMS EMU Meeting Fermilab Oct , 2004

N.Terentiev CMS EMU Meeting Fermilab Oct 29-30, Outline RPC impact on CSC in the June ‘04 test Installation and use of the GRID client for file transfer from CERN to Fermilab Selecting Oct. ’04 test beam runs for analysis Raw data efficiency in Oct. ’04 test beam (preliminary) Plans

N.Terentiev CMS EMU Meeting Fermilab Oct 29-30, RPC impact on CSC in the June ’04 test RPC and CFEB pedestals One RPC RE1/2 was installed onto the ME1/2 RPC data were included into the data path via TMB and RAT (RPC and ALCT interface card) Look at ME1/2 CFEB pedestals and their RMS to see any impact of RPC on CSC Compare two runs with RPC HV OFF/ON and identical CSC conditions ? No such runs but there were runs with similar CSC conditions (Run 357 with RPC data vs Run 380 with RAT removed, RPC HV “OFF”)

N.Terentiev CMS EMU Meeting Fermilab Oct 29-30, RPC impact on CSC in the June ’04 test

N.Terentiev CMS EMU Meeting Fermilab Oct 29-30, RPC impact on CSC in the June ’04 test

N.Terentiev CMS EMU Meeting Fermilab Oct 29-30, RPC impact on CSC in the June ’04 test RPC and CFEB pedestals (cont’d) No RPC impact on the ME1/2 CFEB pedestals and RMS was observed The result is inconclusive (CFEB pedestals from the first time bins) Our suggestion: perform a stand-alone test at ISR with RPC installed on CSC ( in spite of different grounding conditions at ISR and on iron disks)

N.Terentiev CMS EMU Meeting Fermilab Oct 29-30, RPC impact on CSC in the June ’04 test Conditions of the stand-alone test at ISR RPC HV ON/OFF, CSC HV OFF Use the FAST site test #11 (ALCT single-plane self-trigger mode, AFEB counting noise) Use the FAST site test #18 (CLCT single-plane self-trigger mode, comparator counting noise) Count all signals from HV OFF CSC (induced by cosmic muons in RPC plus CSC pick up noise) Add the FAST site test #15 (CFEB DAQ-path noise) with trigger from RPC in case of effect to see the CSC signal amplitude

N.Terentiev CMS EMU Meeting Fermilab Oct 29-30, Use of GRID client for file transfer File transfer in ‘03 and June ‘04 beam tests Files were copied to CERN CASTOR After beam test files were copied from CASTOR to Fermilab Enstore mass storage system CASTOR  lxplus.cern.ch  *.fnal.gov  dCache  Enstore Slow process on lxplus if randomly chosen files are not prestaged in advance in CASTOR Faster if files are copied from one CASTOR tape in their order on tape June ’04 beam test - ~900 data files (compressed, 54 GB total) were copied to Enstore during a few days

N.Terentiev CMS EMU Meeting Fermilab Oct 29-30, Use of GRID client for file transfer File transfer with GRID in Oct. ‘04 beam test Install a Grid client on CMU machine pcepcmu01 at CERN (with I. Vorobiev and help of Yujun Wu of Fermilab ) Use srmcp interface to copy files from pcepcmu01 directly to Fermilab Enstore via dCache Simple script was made to automate compressing input files and sending them to Fermilab with one line srmcp command Reliable work during the beam test, total about 500 files In parallel all files were stored on pcepcmu01 as well Input files were ftped from DAQ machine geurts2 to pcepcmu01 through fast local network

N.Terentiev CMS EMU Meeting Fermilab Oct 29-30, Selecting Oct. ’04 test beam runs for analysis Available test beam information Web site www-hep.phys.cmu.edu/cms/Beam_Test_Sep_2004/tb.html Test Beam Run-Log Database (2004) oraweb03.cern.ch:9000/pls/cms_emu_cern.pro/run_log1.top_page Many records post factum, many debugging runs taken by experts To analyze the data consult also the experts about run conditions Results of quick “online” analysis available on web Made with script using A.Tumanov’s code fastAnal Gives fractions of events per run with ALCT, CLCT tracks and CFEB data blocks in DMBs (DAQ Motheboards) in all 5 CSCs Trigger dependent interpretation (as an efficiency in case of scintillator trigger only) Helps to choose the run for analysis

N.Terentiev CMS EMU Meeting Fermilab Oct 29-30, Selecting Oct. ’04 test beam runs for analysis

N.Terentiev CMS EMU Meeting Fermilab Oct 29-30, Raw data efficiency in Oct. ’04 test beam Data from Run 472 (preliminary, first 1000 events) ALCT, CLCT tracks ~100% in DMBs of all 5 CSCs CFEB presence ~95-99% in DMBs of all 5 CSCs However, ME1/2 and/or ME3/2 often have no data in 1-2 layers HV=3.62 kV (ME1/2), 3.65 kV (ME3/2); ALCT DACthr=20 for all CSCs (AFEB Qthr=20-35 fC) More details in “Data analysis” link of the test beam web site Low efficiency is due to low HV in the CSC’s button region, see the talk of A. Korytov

N.Terentiev CMS EMU Meeting Fermilab Oct 29-30, Raw data efficiency in Oct. ’04 test beam

N.Terentiev CMS EMU Meeting Fermilab Oct 29-30, Plans Continue analysis of the Oct. ’04 test beam data. The package available in EmuDAQ/Analysis folder of the US-CMS Slice Test Software Repository at UF (the latest status yet to be commited). Update ROOT tree file with latest results from FAST sites at IHEP, PNPI, ISR and SX5. Provide data for DB at CERN (with I.Vorobiev). Participate in work of the LPC Muon Group at Fermilab. Participate in Slice Test runs at UF and CERN.