GLAST LAT ProjectLAT Mgr’s meeting July 17-18, 2003 1 LAT Planning Meeting Mechanical Systems Marc Campell.

Slides:



Advertisements
Similar presentations
GLAST LAT ProjectMarch 24, 2003 HPS Tracker Peer Review, WBS Section 2-D 1 GLAST Large Area Telescope: Tracker Subsystem WBS Structural.
Advertisements

Mech Systems Proposed EMI Modifications Marc Campell 9/2/03.
GLAST LAT ProjectDOE/NASA Mechanical Systems Peer Review, March 27, 2003 Document: LAT-PR-0XXXX Section 7.1 Stress Analysis 1 GLAST Large Area Telescope:
IFCT Plan for Next 3 Months Larry Wai June 26, 2003.
GLAST LAT ProjectLAT Mgr’s Meeting October 13, LAT Planning Meeting Mechanical/Thermal Systems October 2004 Marc Campell.
GLAST LAT ProjectLAT Engineering Meeting, April 1, 2003 GLAST Large Area Telescope: Performance & Safety Assurance Darren S. Marsh Stanford Linear Accelerator.
GLAST LAT ProjectDOE/NASA Mechanical Systems Peer Review, March 27, 2003 Document: LAT-PR-0XXXX Section 1.1 Management 1 GLAST Large Area Telescope: Mechanical.
GLAST LAT ProjectLAT Mgr’s Meeting November 17, LAT Planning Meeting Mechanical/Thermal Systems November 2004 Marc Campell.
1 GLAST LAT ProjectMechanical Systems Mechanical Systems Mechanical / Thermal Hardware November 2004 Status Marc Campell, Subsystem Manager.
GLAST LAT ProjectDOE/NASA Mechanical Systems Peer Review, March 27, 2003 Section Mechanical Systems Radiator and X-LAT Assy1 GLAST Large Area Telescope:
GLAST LAT ProjectApril 27, 2006: LAT Pre-Ship Review 1 Presentation 8 of 12 Integration and Test GLAST Large Area Telescope: Pre-Shipment Review Integration.
1 GLAST LAT ProjectMechanical Systems Mechanical Systems Mechanical / Thermal Hardware July 2005 Status Marc Campell, Subsystem Manager.
GLAST LAT ProjectDOE/NASA Review of the GLAST/LAT Project, Feb , 2001 Martin Nordby1 Martin Nordby Stanford Linear Accelerator Center Stanford University.
GLAST LAT ProjectLAT Mgr’s Meeting LAT Planning Meeting Mechanical/Thermal Systems March 17, 2005 Marc Campell.
GLAST LAT ProjectSLAC Pre - Baseline Review, April 16, 2002 ` 1 GLAST Large Area Telescope: I&T Overview WBS: Elliott D. Bloom Stanford Linear Accelerator.
GLAST LAT Project4.1.7 July 17, 03 LAT Meeting G. Haller V41 GLAST Large Area Telescope: Electronics, Data Acquisition & Flight Software W.B.S LAT.
GLAST LAT ProjectJune Cost/Schedule Status Meeting 07/23/ Integration and Test 1 GLAST Large Area Telescope: I & T Input to June Cost/Schedule.
GLAST LAT ProjectSubsystem Managers Meeting May 12, GLAST Large Area Telescope: Lowell A. Klaisner Stanford Linear Accelerator Center Project Manager.
GLAST LAT ProjectLAT Planning Meeting July 17 th and 18 th Integration and Test 1 GLAST Large Area Telescope: I & T Input to LAT Planning Meeting.
LAT Design Integration1 GLAST LAT ProjectDecember 2003 LAT Planning Meeting December 10, 2003 Design Integration LAT Planning Meeting December 10, 2003.
GLAST Calorimeter SLAC LAT Meeting 17Jul 2003 Naval Research Lab Washington DC wnjohnson 1 SLAC Meeting Calorimeter Subsystem 17 July 2003 W. N. Johnson.
GLAST LAT Project ACD CDR Jan 7-8, Section 7 Mechanical Ground Support Equipment GLAST Large Area Telescope: AntiCoincidence Detector (ACD) Mechanical.
GLAST Large Area Telescope:
GLAST LAT ProjectDOE/NASA Mechanical Systems Peer Review, March 27, 2003 Section Mechanical Systems X-LAT Assy1 GLAST Large Area Telescope: Mechanical.
GLAST LAT ProjectDOE/NASA Mechanical Systems Peer Review, March 27, 2003 Document: LAT-PR-0XXXX Section 5.1 Grid Box Design 1 GLAST Large Area Telescope:
GLAST LAT ProjectDOE/NASA Mechanical Systems Peer Review, March 27, 2003 Document: LAT-PR-0XXXX Section 6.0 Subsystem Verif. Test Plan 1 GLAST Large Area.
GLAST LAT ProjectI&T&C Pre PDR Presentation– Oct. 2, I&T&C Organization Chart I&T&C Manager Elliott Bloom WBS I&T Engineer B. Grist WBS
GLAST LAT ProjectCDR/CD3 Review May 12-16, 2003 Document: LAT-PR-01967Section XX 1 GLAST Large Area Telescope: LAT System Engineering WBS Dick Horn.
LAT Design Integration and Analysis1 GLAST LAT Project1 Sep 2005 LAT Monthly Status Review 1 Sep 2005 Design Integration and Analysis LAT Monthly Status.
1 GLAST LAT ProjectMechanical Systems Mechanical Systems Mechanical / Thermal Hardware December 2004 Status Marc Campell, Subsystem Manager.
GLAST LAT ProjectSeptember 15, 2006: Pre-Shipment Review 1 Integration and Test Presentation 11 of 12 GLAST Large Area Telescope: LAT Pre-Shipment Review.
Solar Probe Plus A NASA Mission to Touch the Sun March 2015 Instrument Suite Name Presenter's Name.
Goddard Space Flight Center Cryogenics and Fluids Branch Status of the AMS-02 Cryocooler January 2007 TIM.
LAT Environmental Test PDR1 GLAST LAT Project3-4 May 2005 LAT Environmental Test Planning and Design Review 3-4 May 2005 Operations and Logistics LAT Environmental.
GLAST LAT ProjectCAL Peer Design Review, Mar 17-18, 2003 W. N. Johnson Naval Research Lab Washington DC GLAST Large Area Telescope Calorimeter Subsystem.
1 GLAST LAT ProjectMechanical Systems Mechanical Systems September 2003 GSFC Status Marc Campell, Subsystem Manager.
GLAST LAT ProjectDOE/NASA Baseline-Preliminary Design Review, January 8, 2002 Document: #1 GLAST Large Area Telescope: I&T Overview Elliott D. Bloom Stanford.
GLAST LAT ProjectCAL Peer Design Review, Mar 17-18, 2003 P. Dizon Naval Research Lab Washington DC GLAST Large Area Telescope Calorimeter Subsystem Gamma-ray.
LAT Design Integration and Analysis1 GLAST LAT Project24 May 2005 LAT Monthly Status Review 24 May 2005 Design Integration and Analysis LAT Monthly Status.
LAT-PR Section 11-1 GLAST LAT ProjectMechanical Design Integration Peer Review, March 2003 Mechanical Design Integration Peer Review, March 2003.
LAT MPSRLAT Structural Analysis-1 GLAST LAT ProjectNov-04 Structural Analysis: Completed Tasks LAT System Level –LAT Environmental TIM Support A success.
GLAST LAT ProjectDOE/NASA Mechanical Systems Peer Review, March 27, 2003 Document: LAT-PR-0XXXX Section 5.3 Fab & Assy Plans 1 GLAST Large Area Telescope:
GLAST LAT Project I&T Integration Kickoff Meeting 03/09/04 LAT I&T MGSE Page 1 of 11 GLAST Large Area Telescope: I&T Integration Kickoff Meeting MGSE March.
1 GLAST LAT ProjectMechanical Systems Mechanical Systems November 2003 GSFC Status Marc Campell, Subsystem Manager.
GLAST LAT Project April 27, 2006: LAT Pre-Ship Review Presentation 10 of 12 Mechanical Test 1 GLAST Large Area Telescope LAT Pre-Shipment Review Mechanical.
GLAST Large Area Telescope:
SPF MAG Quarterly Report – Feb 2015
GLAST Large Area Telescope:
Mechanical Integration
GLAST Large Area Telescope:
Peer Review Agenda (Suggested).
GLAST Large Area Telescope:
GLAST Large Area Telescope: I&T Integration Kickoff Meeting
GLAST Large Area Telescope
Integration and Test Organization Chart
1. Introduction and Overview
GLAST Large Area Telescope:
GLAST Large Area Telescope:
GLAST Large Area Telescope:
GLAST Large Area Telescope:
GLAST Large Area Telescope:
Integration and Test Organization Chart
GLAST Large Area Telescope:
Mechanical/Thermal Systems
GLAST Large Area Telescope
Integration and Test Organization Chart
Introduction and Overview
GLAST Large Area Telescope:
Design Integration and Analysis
GLAST Large Area Telescope:
Presentation transcript:

GLAST LAT ProjectLAT Mgr’s meeting July 17-18, LAT Planning Meeting Mechanical Systems Marc Campell

GLAST LAT ProjectLAT Mgr’s meeting July 17-18, MECH Work Flow Summary Matl AV 12SEP03 CAL-Grid I/F Des+EM 12SEP03 GB Stress Analysis 15AUG03 05DEC03 13FEB04 30JAN04 19DEC03 30APR0416APR04 30APR04 Dates TBR MGSE Des & Fab 21NOV03 MGSE Des & Fab 30JAN04 MGSE Des & Fab 12MAR04 X-LAT Thm I/F Des+EM 12SEP03 TF Bond Qual 28NOV03

GLAST LAT ProjectLAT Mgr’s meeting July 17-18, Interdependencies with other subsystems, instrument office, and/or project office. CSE – Analysis support for design release S/C - need tool to drill S/C I/F on Grid & flexures for test? TRK – need matched tooling to drill TRK-Grid I/F ACD – need BEA to match drill BEA LM – X-LAT plates needed for GBA testing prior to delivery to I&T –Radiators needed for LAT environmental tests PO – LM ITAR hardware in B33 ELEC – TCS design, prototype fab & EGSE design & fab for Radiator Thermal balance test ELEC needs –Release of E-box enclosure designs –X-LAT plate thermal performance I&T - Schedule space in B33 for MECH assy & test I&T needs - Grid to start integration –X-LAT design drives accessibility to E-boxes –EMI skirt & Grid provisions for ground cooling –Jeff Wang responsible for thermal analysis of ground cooling

GLAST LAT ProjectLAT Mgr’s meeting July 17-18, Flight hardware procurements – schedule for existing and plans for remaining Long-Lead Procurements –Aluminum Billets due 8/26 (what is the flaw size requirement) –Heat pipe extrusions (LM - placed) –Solid State thermostats have been replaced with standard bimetallic thermostats Major Upcoming Procurements Near-Term (< 4 months) –Lockheed Martin Phase 2 – placed –Grid Assembly - 7/30 place contract (quotes due 7/18) –Flight Hardware for Thermal Control System - started Minor Upcoming Procurements –GSE – 6 designs est Nov 03 –Grid Assembly Fixtures, Test Equipment est Dec 03 –Thermal-cycle Test Fixtures est Jan 04

GLAST LAT ProjectLAT Mgr’s meeting July 17-18, Flight Hardware Manufacturing Plans 3 Assy plansDrafts 3 Assy ProceduresNot Started ~12 Process Specs (some used by LAT)Not Started 2 Test PlansNot Started 2 Test ProceduresNot Started Does not include LM or Grid Vendor plans & procedures

GLAST LAT ProjectLAT Mgr’s meeting July 17-18, Engineering Model Testing Closure CAL-Grid Joint Testing –No further tests planned for Shear plates –CAL bolt preload vs. torque statistical sampling X-LAT thermal joint testing –Coupon level thermal tests of candidates –Mock up E-box stack-up with heaters on sidewalls to simulate electronics heat source and flight like installation procedures to identify potential process problems (who’s responsible? ELEC?) –Perform Random Vibe and Thermal Vacuum tests if required 1x4 Grid –Static load test (FEM verification) –CAL Shear plate installation/removal validation –CAL installation demo (TRK cable-EMI skirt clearances) –Purge gas system demo? (what is reqmt for flow rate?)

GLAST LAT ProjectLAT Mgr’s meeting July 17-18, Engineering Model Testing Closure (cont) Grid top flange heat pipe bonding process qualification –Validate tooling –Demo process control Demonstrate Radiator installation process –6 wet RTV joints in vertical orientation & restricted access –Demo with Radiator +Z and +X up –Complete within pot life limits (bonded & torqued) –Verify bond line integrity (uniform thickness & % voids) Demonstrate Radiator removal process –Separate 6 joints with restricted access –No damage or distortions of heat pipes –Verify material can be cleaned up & surface prepared again for another bond

GLAST LAT ProjectLAT Mgr’s meeting July 17-18, Open Flight Design Issues 1.Finalize CAL-Grid interface design 2.Finalize X-LAT to E-box design 3.Close the loop on Grid-ELEC interface (grounding & EMI) 4.Delete Radiator level EMI test requirement? (perform EM test w/ D. Nelson) 5.Mechanically install Radiators for LAT EMI test? (EMI test plan out for review) 6.Grid-TRK interface define Grid datums & TRK tooling interface 7.Define GBA Static Load test requirements & plans 8.S/C Flexures for GBA static load test? 9.GBA Thermal cycle vs Thermal Vacuum test approval 10.RFA on adding a U heat pipe to X-LAT plate in case of XLHP failure 11.Other RFA’s closure 12.Examine removing X-LAT plates from GBA static load and thermal cycle tests to beak schedule dependency

GLAST LAT ProjectLAT Mgr’s meeting July 17-18, Concerns & Risks 1.Will we be ready to cut Grid chips on Sep 12? a.Detailed stress analyses complete b.Design mods incorporated c.Successful MRR 2.Manpower (Engr & Techs) availability 3.Details of how, where & who for Grid Box Assembly work (Larry Wai) 4.Finalizing CAL & X-LAT designs a.EM testing & flight grid fab in parallel 5.Cost &availability of EGSE for Radiator Thermal Balance Test 6.Adequate support for LM efforts