King Fahd University of Petroleum and Minerals Department of Construction Engineering and Management CEM - 510 Instructor: Dr. Soliman Al-Mohawis Important.

Slides:



Advertisements
Similar presentations
THE HELP PROCESS. Professional medical equipment project management is the systematic, knowledgeable process through which all items of capital equipment.
Advertisements

ABC Change Orders College of Environmental Design
TQM Study in Royal Commission of Jubail CEM 515. Purpose of the royal commission Is to develop, construct and maintain the infrastructure of Jubail-2:
DISTRICT FIVE CONSTRUCTION CONTRACT ADMINISTRATION UPDATE TRAINING Submission of Working Schedule Specification SP A.
King Fahd University of Petroleum and Minerals Department of Construction Engineering and Management Presented to: Dr. Sadi Assaf CEM 520 Class Causes.
Managing a Successful Mechanical System project Following design – what next?
Generation Business Line
YOU ALWAYS GET WHAT YOU ALWAYS GOT. Roles and Responsibilities Arden Delisle Chief Inspector Al-Pac March 24 th 2014.
Modifications to the Storm Water Ordinance The City Municipal Separate Storm Sewer System (MS4) drains rainwater and all runoff into natural streams. EPA’s.
Summary of “Factors Affecting Construction Practices in Makkah, Saudi Arabia” Written by: Sami Barhamain October 1986 (CEM 520) Presented by: Ehab A. Qahwash.
KING FAHD UNIVERSITY OF PETROLEUM & MINERALS DHAHRAN, SAUDI ARABIA Construction Engineering & Management CEM-520 CHANGE ORDERS IN CONSTRUCTION PROJECTS.
Presentation for Thesis of Master Degree Done by Ali Abdullah Al Salman CEM – 520 Term Project (Paper Presentation) Assessments of Risk Management Perception&
Factors Governing Housing Construction Costs in Saudi Arabia Abdelrahman Al-Gwaiz Kamal Al Dihan Faisal Al Ankary.
Guidelines for legal appointment under MQW&M Act, CAP 44:02 Contractor
Public Transport in Saudi Arabia
Determination of Construction Contract Duration for Public Projects in Saudi Arabia By: Ahmed Saleh Al-Sultan, June 1989 Presented by Sameh Elish January.
Presented By: Wasel A. Al-Muhammad 24 December 2002 by Ahmad I. Al-Musallami MS Thesis: CEM, KFUPM, 1992.
Project Close Out CTC-470.
KFUPM, Department of Construction Engineering and Management CEM 520 LIABILITY ALLOCATION AMONG THE PARTIES TO FIXED-PRICE CONSTRUCTIN CONTRACTS IN SAUDI.
THE PROJECT TEAM TYPICAL REQUIREMENTS AND RESPONSIBILITIES OF THE PROJECT TEAM TRADITIONAL TEAM ORGANIZATION AND VARIATIONS THE OWNER’S TEAM THE DESIGN.
The Committee of Registration and Licensing the Practice of Engineering Consultancy Profession and Contracting # Activity codeActivity Architectural design.
Lecture(3) Instructor : Dr. Abed Al-Majed Nassar
Abdallah M. Al-Mahasheer
Spring 2008, King Saud University Engineering Administration Dr. Khalid Al-Gahtani 1 What is a Project? “A Project is a one-shot, time-limited, goal- directed,
Done by: Abdulrahman A. Al-Hussain I.D Done for: Prof. Abdulaziz Bubshait Term 082 – June 2009 King Fahd University of Petroleum and Minerals.
1 Construction Claims in Residential Houses in Saudi Arabia Presented by Adel Al Rabee.
ولقد خلقنا السماوات والأرض وما بينهما في ستة أيام وما مسنا من لغوب (سورة ق )
FY Budget Presentation to Board of Finance March 17, 2014 Building Department Robert DeMarco, Chief Building Official.
E&P STORM WATER OVERVIEW Domestic Onshore Energy E&P STORM WATER OVERVIEW Domestic Onshore Energy May 10, 2005.
Dr Mohamed Emad Farrag Presentation title – EPE & MPPS.
Camp Pendleton Chamber of Commerce Day Kim Bourgeois June 2, 2011.
Quality Function Deployment in Maintenance Work Planning by S.O.Duffuaa, A.H.Al-Ghamdi, A.Al-Amer.
CEM 520 Construction Contracting Dr S. Almohawis Course Content.
1 MAINTENANCE EFFICIENCY THROUGH DIRECT LABOR OR MAINTENANCE CONTRACTS BY Al-Hammad, A., and Al-Otaibi, G. College of Environmental Design King Fahd University.
Specification & Quantities Estimating
King Fahd University of Petroleum & Minerals
BUILDINGS & ESTATES DEPARTMENT RESPONSIBILITIES  MAINTENANCE OF EXISTING BUILDINGS & GROUNDS Mechanical Electrical Builders Work Grounds Specialist 
1 School District of Osceola County Facilities, Planning, Maintenance & Construction Monthly Update – April 2007 Construction Workshop 24 April 2007.
General Condition THE EMPLOYER Construction Law Supervised By : Dr. Kamalain Shaath Prepared By : Eng. Fawzy El.farra.
GREENE CONSULTING ENGINEERS (PTY) LTD 14 January 2014.
PROJECT PHASES ACT Objective To provide an understanding of the design & construction process and the roles of the different participants in this.
TAOYUAN ENVIRONMENTAL SCIENCE & TECHNOLOGY PARK BUSINESS INVITATION SEMINAR PRESENTATION OF PREFERENTIAL MEASURE & COUNSELING ENVIRONMENTAL PROTECTION.
1 Public hearing on conditional grants and capital expenditure: 3rd quarter Presentation to Select Committee on Finance Northern Cape’s Department of Agriculture.
1 School District of Osceola County Facilities, Planning, Maintenance & Construction Monthly Update – June 2007 Construction Workshop 26 June 2007.
TQM Study For Telecom Towers King Fahd University of Petroleum & Minerals Department of Construction Engineering & Management CEM 515: Project Quality.
Self-Directed Energy Contracting Saving Your Buildings and Your Money.
1 School District of Osceola County Facilities, Planning, Maintenance & Construction Monthly Update – March 2007 Construction Workshop 27 March 2007.
Designer/Contractor JV- Apron Services Projects- A Winning Case
OTC Pres Project Del P5 12/08 Page 1 Project Delivery Performance Improvement Report to the Oregon Transportation Commission Jeff Gower, State Construction.
OVERHEAD COSTS IN BUILDING CONSTRUCTION IN SAUDI ARABIA Author: Mohammad Al-Shahri (1997) Presented By Fawaz Al-Ghamdi January 1, 2005.
9 th Cohesion Fund Monitoring Committee CR 1164/94 ISPA Measure 2002 BG 16 P PE 018 Shoumen Water Cycle Improvements.
McDonough Bolyard Peck Educational Series HVAC Commissioning Presented by: Doug Wren Steve Baxter September 30, 2003.
Measure N Modernization IMPLEMENTATION PROCESS Planning, Bidding, Construction, and Occupancy.
Christopher M. Quinn, MACC, CPA, CFE, CGFO, CGMA Finance Director Tuesday, May 3 rd, 2016.
Procurement of Professional Services.  Professional Services:  Architects, Engineers  Surveyors  Geotechnical engineers  Nonprofessional Services:
1 Directorate of Logistics and Directorate of Engineering and Housing MAJ Karson Snyder Room FEB 00 INTRODUCTION.
Local Development (San Diego)  Development Services is responsible for managing the majority of the construction and development project review services.
1 JCI 1 1 An engineer is someone who can do for $5,000 what any damn fool can do for $50,000. Anonymous.
Minimum Set of Requirements for Suppliers
Minimum Set of Requirements for Suppliers
Faculty of Postgraduate Studies and Scientific Research German University in Cairo Modeling to Reduce Variation Order in Construction Projects in Egypt.
Measure N Modernization
Presentation to the Portfolio Committee 17 AUGUST 2011
9/18/2018 Bids CONTRACTING Khamis…..
Designers’ Manual Overview and Chapter Contents
Factors Affecting Bid/No Bid Decision Making IN The West Bank
CEM 515 Done by: Abdulkarim Sulais
BUILT ENVIRONMENT COURSE TECHNOLOGY AND MANAGEMENT
TOTAL COST CONTROL ON CONSTRUCTION PROJECTS
Presentation transcript:

King Fahd University of Petroleum and Minerals Department of Construction Engineering and Management CEM Instructor: Dr. Soliman Al-Mohawis Important Causes of delay in Public Utility Projects in Saudi Arabia Authors: Mohamed I. Al-Khalil Mohamed A. Al-Ghafly Presented By: Tariq Al-Wabil 20 December 2003

INTRODUCTION PREVIOUS STUDIES MAIN CAUSES OF DELAY SUMMARY & CONCLUSION Q & A GUIDELINES Important Causes of delay in Public Utility Projects in Saudi Arabia

Purpose: To determine the most important delay factors so that efforts can be made to control these factors. OWNER. CONSULTANT. GENERAL CONTRACTOR SUB CONTRACTOR MATERIAL SUPPLIER ٱ Introduction Important Causes of delay in Public Utility Projects in Saudi Arabia

ٱ Previous Studies 37% according to the contractors. 84% according to the consultants. Important Causes of delay in Public Utility Projects in Saudi Arabia 70% of Public Utility Projects subject to delay. 39% of Original Project duration.

Six major Categories 1 -Contractor performance 2 -Owner administration 3 -Early planning and design 4 -Government regulations 5 -Site and environmental conditions 6 -Site supervision ٱ Main Causes of Delay Important Causes of delay in Public Utility Projects in Saudi Arabia Sixty Causes of Delay (Handout)

ٱ Main Causes of Delay 1 -Contractor performance (1 - 29) Material Equipment Manpower Project management Project Finance

2 -Owner Administration ( ) Slow decision making Progress Payment Coordination with other authorities ٱ Main Causes of Delay Important Causes of delay in Public Utility Projects in Saudi Arabia

ٱ Main Causes of Delay 3 -Early Planning & Design ( ) Low qualification of A/E Changes in the scope of the project Important Causes of delay in Public Utility Projects in Saudi Arabia

ٱ Main Causes of Delay 4 -Government Regulations ( ) Difficulty in obtaining work permits. Tendering System Important Causes of delay in Public Utility Projects in Saudi Arabia

ٱ Main Causes of Delay 5 -Site & Environmental Conditions ( ) Different from area to another Site survey by the contractor Work interference by Contractor Important Causes of delay in Public Utility Projects in Saudi Arabia

ٱ Main Causes of Delay 6 -Site Supervision ( ) Qualification of Consultant Engineer’s Staff. Submittal Approval Inspection & Testing Important Causes of delay in Public Utility Projects in Saudi Arabia

ٱ SUMMARY & CONCLUSION Cash flow Problem Work Permits. Tendering System Important Causes of delay in Public Utility Projects in Saudi Arabia

Degrees Financial Limits of Saudi Contractor#Field Degree (In Millions Riyal) 5 th 4 th 3 rd 2 nd 1 st Roads Water and sewage works Industrial Works Marine Works Buildings Electrical Works Mechanical Works Electronic Works DamsLandscaping Slaughter Houses Cities Cleaning & Hauling of garbage Parks & recreation grounds Maintenance Medical Centresb Maintenance Wells Drilling More than 300 More than 200 More than 100 More than 10 Important Causes of delay in Public Utility Projects in Saudi Arabia

Contractor Classification Certificate Important Causes of delay in Public Utility Projects in Saudi Arabia

Q & A Important Causes of delay in Public Utility Projects in Saudi Arabia

Thank You Important Causes of delay in Public Utility Projects in Saudi Arabia