DAQ WS03 Sept 2006Jean-Sébastien GraulichSlide 1 Wrap Up o Control and Monitoring o DDAQ o Interface between DDAQ and MCM o Infrastructure Jean-Sebastien.

Slides:



Advertisements
Similar presentations
SciFi Tracker DAQ M. Yoshida (Osaka Univ.) MICE meeting at LBNL 10.Feb.2005 DAQ system for KEK test beam Hardware Software Processes Architecture SciFi.
Advertisements

MICE CM Berkeley 9-12 Feb February 2005 Edda Gschwendtner 1 Parameter List Edda Gschwendtner Introduction Parameter list for sub-systems of MICE.
MICE CM January 2009Jean-Sébastien GraulichSlide 1 DAQ and CAM Summary o Organization o Control and Monitoring o Detector DAQ o Online Monitoring o Front-End.
Peter Chochula, January 31, 2006  Motivation for this meeting: Get together experts from different fields See what do we know See what is missing See.
Daresbury Aug 2005Jean-Sébastien Graulich Detector DAQ Overview and Needs Jean-Sebastien Graulich, Univ. Genève o Introduction o Detector Systems Overview.
April 2006Jean-Sébastien GraulichSlide 1 DAQ Status o Goal for BTF o Status o First results o To be done.
Workshop Goals MICE Controls and Monitoring Workshop September 25, 2006 A. Bross.
DAQ WS02 Feb 2006Jean-Sébastien GraulichSlide 1 DDAQ Hardware Architecture o General Architecture o Tracker Baseline o TOF Baseline & Options o EmCal Baseline.
DAQ WS03 Sept 2006Jean-Sébastien GraulichSlide 1 Control and Monitoring of PID Detectors o Disclaimer o Remarks on Control and Monitoring: 1) Missions.
MICE CM15 June 2006Jean-Sébastien GraulichSlide 1 DAQ for BTF o BTF Overview o Hardware Overview o DAQ Software Description o What’s next o Summary Jean-Sebastien.
Paul drumm daq&c-ws august/september Cooling Channel.
Pete Owens MICE Controls & Monitoring Workshop 25th September 2006 MICE Control and Monitoring: General Architecture Subsystem Integration User Interface.
MICE CM15 June 2006Jean-Sébastien GraulichSlide 1 DAQ Status o Detector DAQ Test bench in Geneva o Preparing for Test Beam o FE electronics tests o Detector.
1 Online data quality and monitoring M. Ellis Daresbury DAQ Meeting 31 st August 2005.
DAQ WS02 Feb 2006Jean-Sébastien GraulichSlide 1 Does IPM System Matches MICE needs ? Personal Understanding and Remarks o General Considerations o Front.
Tracker Controls MICE Controls and Monitoring Workshop September 25, 2005 A. Bross.
Online Reconstruction Update Linda R. Coney UCR Dec 17, 2009.
2005/10/22 MICE CM at RAL, Tracker Parallel, Makoto Yoshida 1 KEK test beam - introduction - M. Yoshida MICE CM tracker parallel 2005/10/ /10/22.
MICE CM15 June 2006Jean-Sébastien GraulichSlide 1 DDAQ Pending Issues o Detector FEE o Software framework o Trigger o Data Storage Jean-Sebastien Graulich,
MICE CM Berkeley 9-12 Feb February 2005 Edda Gschwendtner 1 Control/Monitoring and DAQ for PIDs Edda Gschwendtner.
Control, Monitoring and DAQ Makoto Yoshida Osaka Univ. MICE Frascati June 28, 2005.
DAQ WS03 Sept 2006Jean-Sébastien GraulichSlide 1 Report on FEE for PID o Reminder o TOF o EMCAL o Summary Jean-Sebastien Graulich, Geneva.
Controls Review  Want to record a full configuration of the experiment at every possible “event”, including controls data.  Event trigger = accelerator.
Y. Karadzhov MICE Video Conference Thu April 9 Slide 1 Absolute Time Calibration Method General description of the TOF DAQ setup For the TOF Data Acquisition.
DAQ WS03 Sept 2006Jean-Sébastien GraulichSlide 1 Interface between Control & Monitoring and DDAQ o Introduction o Some background on DATE o Control Interface.
VC Sept 2005Jean-Sébastien Graulich Report on DAQ Workshop Jean-Sebastien Graulich, Univ. Genève o Introduction o Monitoring and Control o Detector DAQ.
MICE CM17 Feb 07Jean-Sébastien GraulichSlide 1 Detector DAQ Status o Since CM16 o Detector DAQ software o Front End Electronics o Schedule Milestones o.
1Malcolm Ellis - Software Meeting - 31st May 2006 Data Challenge Requirements  First list of requirements, based on Yagmur’s document: u
DAQ WS03 Sept 2006Jean-Sébastien GraulichSlide 1 DDAQ Trigger o Reminder: DAQ Trigger vs Particle Trigger o DAQ Trigger o Particle Trigger 1) Possible.
RF controls for MICE Andrew Moss Sept 06. What we need A flexible easy to use solution to control the amplitude, phase and timing of the MICE RF amplifiers.
Brian Martlew 25 th Sept 2006 MICE Control & Monitoring Plan Brian Martlew.
MICE Tracker Readout and Data Acquisition; Solenoid Magnetic Field Measurement Terry Hart for the MICE Collaboration, Illinois Institute of Technology,
MICE CM25 Nov 2009Jean-Sebastien GraulichSlide 1 Online Summary o Detector DAQ o Controls And Monitoring o Online Data Base o Bottom Lines Jean-Sebastien.
MICE CM26 March '10Jean-Sebastien GraulichSlide 1 Detector DAQ Issues o Achievements Since CM25 o DAQ System Upgrade o Luminosity Monitors o Sequels of.
CM26 March 2010Jean-Sebastien GraulichSlide 1 Online Summary o The heplnw17 case o DAQ o CAM o Online Reconstruction o Data Base o Data Storage Jean-Sebastien.
MICE CM February 08Jean-Sébastien GraulichSlide 1 Detector DAQ Hardware Status o Introduction o Preliminary list o Plan for action o Summary Jean-Sebastien.
Control and Monitoring System / EPICS Pete Owens Daresbury Laboratory.
MICE CM18 June 07Jean-Sébastien GraulichSlide 1 Detector DAQ Status o Since CM17 o Detector DAQ software o Front End Electronics o Schedule Milestones.
MICE VC Aug '10J.S. GraulichSlide 1 MOM report o Achievements Since CM27 o Daily Operations o Run Plans o Summary Jean-Sebastien Graulich, Geneva.
Control & Monitoring System Update Contributors: Brian Martlew - Daresbury Laboratory - STFC James Leaver - Imperial College Pierrick Hanlet - Fermilab.
DAQ MICO Report Online Monitoring: –Status All histograms are now implemented Still not fully online –Only monitoring from data file (slightly offline,
MICE CM25 Nov 2009Jean-Sebastien GraulichSlide 1 Detector DAQ Issues o Achievements Since CM24 o Trigger o Event Building o Online Software o Front End.
MICE CM16 Oct 2006Jean-Sébastien GraulichSlide 1 Detector DAQ Status o Since CM15 o Detector DAQ software o Interface DDAQ / Mice Control & Monitoring.
André Augustinus 10 September 2001 DCS Architecture Issues Food for thoughts and discussion.
MICE CM June 2009Jean-Sebastien GraulichSlide 1 Online Summary o Achievements Since CM23 o Control Room o Controls o Detector DAQ o Open Issues o Summary.
DAQ WS03 Sept 2006Jean-Sébastien GraulichSlide 1 Control and Monitoring Summary of DAQ WS III o General Architecture o RF System C&M o D0 EPICS extensions.
Timing and synchronisation to ISIS RF Edward Overton 1.
Mice CM Oct 2005Jean-Sébastien GraulichSlide 1 MICE Collaboration Meeting Oct05 Review of DAQ Workshop and DAQ Issues Jean-Sebastien Graulich, Univ. Genève.
Tracker Timing and ISIS RF Edward Overton 1. At CM32… 2 Had done some preliminary checks on the ISIS RF. Was beginning to think about how to handle the.
MICE Status & Plans MICE-UK paul drumm 15 th September 2004.
January 31, MICE DAQ MICE and ISIS Introduction MICE Detector Front End Electronics Software and MICE DAQ Architecture MICE Triggers Status and Schedule.
Controls for Particle ID/tracking in MICE 1.Physics and systematics 2.Controls types 3.Controls list 4.Needed for particle ID/tracking M. A. Cummings May.
Online Reconstruction 1M.Ellis - CM th October 2008.
MICE CM January 2009Jean-Sébastien GraulichSlide 1 Detector DAQ Issues o Achievements Since CM23 o Detector DAQ o Trigger o Online Software o Front End.
Linda R. Coney – 5 November 2009 Online Reconstruction Linda R. Coney 5 November 2009.
MICE CM28 Oct 2010Jean-Sebastien GraulichSlide 1 Detector DAQ o Achievements Since CM27 o DAQ Upgrade o CAM/DAQ integration o Online Software o Trigger.
CM19 Vassil Verguilov DAQ Status  Progress  DAQ  Next steps  Summary.
Database David Forrest. What database? DBMS: PostgreSQL. Run on dedicated Database server at RAL Need to store information on conditions of detector as.
Tracker Cosmic Ray Test 2011 Linda R. Coney UC Riverside CM 29 - February 16, 2011.
M. Bonesini – CM 291 PID detectors summary M. Bonesini Sezione INFN Milano Bicocca.
Controls and monitoring in MICE 1.Physics and systematics 2.Controls types 3.Controls list 4.Data record M. A. Cummings April 2004 CERN.
ch/~bdl/lepc/lepc.ppt 1 MICE Status and Plans Rikard Sandström Université de Geneve International Scoping Study CERN,
MICE CM February 08Jean-Sébastien GraulichSlide 1 Report on DAQ & CAM o Detector DAQ Status Hardware Trigger Software o Controls and Monitoring (CAM) o.
VC98 March 07Jean-Sébastien GraulichSlide 1 DDAQ Status o DAQ Software o Front-End and Trigger o What will happen soon o Schedule Milestones Jean-Sebastien.
L. Coney UC Riverside MICE CM32 – Glasgow – June 2012
Online – Data Storage and Processing
Tracker readout, DAQ, C&M and calibration
Jean-Sebastien Graulich, Geneva
MICE AFEIIt Timing and Triggering
Controls & Monitoring in MICE
Presentation transcript:

DAQ WS03 Sept 2006Jean-Sébastien GraulichSlide 1 Wrap Up o Control and Monitoring o DDAQ o Interface between DDAQ and MCM o Infrastructure Jean-Sebastien Graulich, Geneva

DAQ WS03 Sept 2006Jean-Sébastien GraulichSlide 2 Control and Monitoring  Peter Owens presented General Architecture, Subsystem Integration and User Interface  Subsystem integration: Recommendations Use File System convention Use standard hardware (Hytec 9010 IOC) Use Simulation Name Convention

DDDD-TT-CCCCC-NN:SSS:RRRRRR Max 3 char Max 5 char Max 3 digits Max 10 char Agreed

DAQ WS03 Sept 2006Jean-Sébastien GraulichSlide 4  Actions: Prepare the list of Technical Area codes (Equipment codes are under the responsibility of the subsystem developer). Names should be approved by Peter Owens Set up a DAQ web site web master: Vassil Verguilov

DAQ WS03 Sept 2006Jean-Sébastien GraulichSlide 5

Colour Scheme * Grey - background * Blue - control * Green – monitor/on/open/OK * Yellow – * Red – alarm/off/closed * White – * Brown - Clickable invalid warning

DAQ WS03 Sept 2006Jean-Sébastien GraulichSlide 7 RF Control System  Andy Moss introduced the Direct Digital Synthesizers as very flexible way to produce RF Can be programmed via serial ports Exists in 4 channel version: Allows independent control of 4 RF channels synchronised to the same clock, with excellent isolation between channels Can be interfaced with Epics  Digital timing system with 5 outputs Can EPICS provide the timing signal? ->Triggered Discussion on RF phase measurement RF amplitude measurement

Basic Layout of LLRF system

DAQ WS03 Sept 2006Jean-Sébastien GraulichSlide 9 RF  Decision RF phase: A logic pulse with precise constant phase w.r.t the RF should be sent to the TOF TDC We’ll use the locking signal and not zero crossing of the probed RF field A signal should be sent to the DDAQ when the cavities are locked  Action Investigate the possibility of using ~GHz waveform digitizer (oscilloscope) to measure the RF amplitude Contact MTA people for tests

DAQ WS03 Sept 2006Jean-Sébastien GraulichSlide 10  Fritz Bartlett presented D0 EPICS Extensions for MICE Significant Event System Replaces the standard Alarm handler Fritz is willing to make SES “D0 independent” COMICS (Experiment Control System) GUI  The possibility to use SES will be seriously considered  The need for an Experiment Configuration System is recognized

DAQ WS03 Sept 2006Jean-Sébastien GraulichSlide 11 Subnets  Fritz strongly recommended to set up a subnet for the C&M (IOC are not protected)  A separate subnet is needed for DDAQ

DAQ WS03 Sept 2006Jean-Sébastien GraulichSlide 12 Tracker C&M  Alan Bross has shown that  Alan Bross has shown that the basic infrastructure for the MICE tracker C&M can be copied from D0 GUI Python Code EPICS implementation  To do Customization to MICE (considerable weight loss) Develop a stand-alone VLPC cryostat C&M application

DAQ WS03 Sept 2006Jean-Sébastien GraulichSlide 13 PID Control Naming convention TOF EMC CKV Station 01, 02, 03 Part # (01 for KL, 02 for SW) Part # (01 or 02) MICE-DDD-HVPS-##:###:HVSP Channel #

DAQ WS03 Sept 2006Jean-Sébastien GraulichSlide 14 TOF0 TOF1 TOF2 USCDSC Tracker 1 Tracker 2 EMCAL  The Ideal GUI  Each Detector has a color:  Each Detector has a color: Green= FULL_READY Yellow= OUT_OF_RANGE_L2 Red= OUT_OF_RANGE_L3 or TRIPPED or NOT_READY White= INACTIVE  Each Detector is clickable, a panel pops up with the status of each individual channel  The same panel can be used to edit the settings, providing a password

DAQ WS03 Sept 2006Jean-Sébastien GraulichSlide 15  DDAQ & MCM Interface 1) MCM should know and archive the status of DDAQ 2) DDAQ should not run when MICE is not ready In particular the run should be stopped when something goes wrong in one subsystem 3) DDAQ should incorporate some data under the control of MCM which have a physical meaning: e.g. Hall Temperature, Pressure and Temperature in the Absorber, Current in the magnets, etc At some point we will need a list… This data will be collected asynchronously during the run, written in file and included in the data stream at the end of the run Control Interface Data Interface

DAQ WS03 Sept 2006Jean-Sébastien GraulichSlide 16 Data base  Discussion initiated Some Data Base is needed Detector Configuration Calibration and Geometry DATE is using MySQL C&M archive should allow random access  Action ORACLE cost estimation – Paul Kyberd Find other options - All

DAQ WS03 Sept 2006Jean-Sébastien GraulichSlide 17 Trigger  4 Particle Trigger Conditions for Normal Events Burst: All ISIS bunch crossing with the target can produce a particle trigger, providing the FEE is not busy Beam: Burst x TOF0 Timing given by Burst Upstream: Beam x TOF1 Timing given by TOF1 Traversing: Upstream x TOF2 Timing given by TOF1  Trigger Receiver: CAEN V Ch I/O

DAQ WS03 Sept 2006Jean-Sébastien GraulichSlide 18