PacifiCorp Utility Update JSIS Meeting March, 2015.

Slides:



Advertisements
Similar presentations
Advanced Energy Conference New York, NY October 31, 2012
Advertisements

The Western Interconnection Synchrophasor Program (WISP ) Update Vickie VanZandt Joint Synchronized Information Subcommittee Salt Lake City August 10,
WISP RFI for Applications response summary
Wide Area Measurement Communication Network Proposal June 2009 Operating Committee Meeting.
Joint Synchronized Information Subcommittee JSIS.
Using Synchrophasors for Preventing Cascading Outages
ISO New England Smart Grid Investment Grant Update David Bertagnolli – NASPI Working Group Meeting October 12-13,
Test practice Multiplication. Multiplication 9x2.
Marianna Vaiman, V&R Energy
Idaho Power Update JSIS Meeting March 3, Infrastructure PMU installations: 24 PMU sites: 15 WISP PMU Installations: 5 WISP PMU sites: 3 WISP installations.
1 GP Confidential © GlobalPlatform’s Value Proposition for Mobile Point of Sale (mPOS)
Duke Energy Carolinas Smart Grid Investment Grant Tim Bradberry Tim. NASPI Work Group Meeting October 12-13,
NASPI overview and update
CAISO Update JSIS Meeting March, Infrastructure 92 Connected PMUs 64 Substations 7 PDCs reporting (BPA, PG&E, SCE, SDG&E, APS, SRP and NVP) Redundant.
RiversidePublicUtilities.com Arts & Innovation RiversidePublicUtilities.com Challenges and Solutions for Large-Scale PV Integration on RPU’s Distribution.
System Components Hardware overview for Apollo ACS.
American Transmission Company Smart Grid Investment Grant Update Jim Kleitsch NASPI Work Group Meeting October 12-13,
11 SERVER CLUSTERING Chapter 6. Chapter 6: SERVER CLUSTERING2 OVERVIEW  List the types of server clusters.  Determine which type of cluster to use for.
John Graham – STRATEGIC Information Group Steve Lamb - QAD Disaster Recovery Planning MMUG Spring 2013 March 19, 2013 Cleveland, OH 03/19/2013MMUG Cleveland.
SUBSTATION MODELING: PROTECTION AND AUTOMATION
I NTEGRATION OF S YNCHRO -P HASOR M EASUREMENTS IN P OWER S YSTEMS S TATE E STIMATION FOR E NHANCED P OWER S YSTEM R ELIABILITY Hassan Ghoudjehbaklou,
Texas Phasor Project ERCOT Reliability and Operations Subcommittee (ROS) February 12, 2009 Milt Holloway, Center for the Commercialization of Electric.
Hardware.  Learn what hardware is  Learn different input and output devices  Learn what the CPU is.
Software Licensing, Made Simple SELECT Server XM Edition
© 2011 New York Independent System Operator, Inc. All Rights Reserved. Smart Grid Investment Grant Project Update Jim McNierney Enterprise Architect New.
UNIT - 1Topic - 1. An electronic device, operating under the control of instructions stored in its own memory unit, that can accept data (input), manipulate.
 Computer Fundamentals Computer Software. Review  Five Components of Computers  Example of input device  Example of output device  Define system.
Module 3: Configuring Hardware on a Computer Running Windows XP Professional.
V&R Energy’s Project under PRSP: Grid Operator’s Monitoring & Control Assistant (GOMCA) Marianna Vaiman, V&R Energy JSIS Meeting.
Networks. A network is formed when a group of computers are connected together. Computers in a Local Area Network (LAN) are fairly close together, generally.
1 Application of Synchrophasor Technology To CREZ System CREZ Technical Conference January 26, 2010 Navin Bhatt American Electric Power.
Energy Gateway Update for Wyoming Infrastructure Authority January 27, 2009 Darrell Gerrard Vice President Transmission System Planning.
Protecting e -Government Against Attacks Gernot Heiser NICTA and University of New South Wales.
Costs and Benefits. Benefits Direct Cost Reduction. Cost displacement. Revenue Enhancement. Indirect Cost Avoidance. Performance Enhancement. Risk Reduction.
Unit 5 CONTROL CENTERS AND POWER SYSTEM SECURITY.
Human-computer interfaces. Operating systems are software (i.e. programs) used to control the hardware directly used to run the applications software.
A few notes. First - What is the Cloud ? * Any number of blogs / articles and definitions * Accessing information services and software over the internet.
1 Operations Objectives April 21, Q
By Dinesh Bajracharya Nepal Components of Information system.
Learning Outcomes: Did You Learn What We Said You Should Learn? Russell Taylor.
RELIABILITY ENGINEERING 28 March 2013 William W. McMillan.
System Design and Deployment Status PDS Management Council Face-to-Face UCLA, Los Angeles, California November 28-29, 2012 Sean Hardman.
November 16, 2012 Synchrophasor Meeting Dynamic Model Validation Project Jonathan Rose Engineer, Resource Integration Sidharth Rajagopalan Engineer, Dynamic.
OCS Remote Viewer Release 0.12 March 21, 2007 Confidential.
PI in a Modern Power Plant – American National Power, Inc. PI User Conference ‘03 Presented by: Brian M. Wood, American National Power, Inc More Uses Than.
Copyright © 2008 FingerTec Worldwide Limited. All rights reserved
B O N N E V I L L E P O W E R A D M I N I S T R A T I O N BPA - WISP Project NASPI Work Group Meeting October 12-13, 2011 Scott Lissit – Project Manager,
PJM Interconnection Smart Grid Investment Grant Update
Phishing Phishing is the attempt to acquire sensitive information such as usernames, passwords, and credit card details (and sometimes, indirectly, money)
INTRODUCTION OF SYSTEM & APPLICATION SOFTWARE. OPERATING SYSTEM (OS) An operating system, or OS, is a software program that enables the computer hardware.
Lyndon B. Johnson Space Center Human Research Facility (HRF) HRF WORKSTATION 2 Brian Barras 1 HRF WORKSTATION 2 OVERVIEW/NOMINAL OPERATIONS Trainer: Brian.
WECC Joint Synchronized Information Subcommittee Report Planning Coordination Committee Meeting March 22,
1 PSSE Playback Model Validation with PMU Data Damien Sommer, P.E. Senior Transmission Planning Engineer.
ΜΕΤΑΣΥΛΛΕΚΤΙΚΗ ΦΥΣΙΟΛΟΓΙΑ ΕΡΓΑΣΤΗΡΙΟ 3. Μετασυλλεκτική Εργ3-Λιοσάτου Γ.2 ΒΙΟΛΟΓΙΚΟΙ ΠΑΡΑΓΟΝΤΕΣ ΠΟΥ ΕΠΗΡΕΑΖΟΥΝ ΤΗ ΦΘΟΡΑ ΤΩΝ ΟΠΩΡΟΚΗΠΕΥΤΙΚΩΝ Αναπνοή Η λειτουργία.
Information Technology. *At Home *In business *In Education *In Healthcare Computer Uses.
Fault Tolerance Comparison
SCE Utility Update JSIS Meeting March, 2015.
CCET Discovery Across Texas Data Quality Plan - Overview
Lessons Lesson 1: Identifying Hardware Requirements
Attachment-K Q2 Public Meeting
Unit I Flash Cards Start.
اثرات گرمايش جهاني تغييرات آب و هوا، تأثيرات عميق و شديدي بر بسياري از عوامل اساسي موثر بر سلامت از جمله : آب، غذا، هوا و محيط زيست دارد كه اين مورد خود.
مديريت موثر جلسات Running a Meeting that Works
Tony Faris JSIS Meeting October 2017
PSSE Playback Model Validation with PMU Data
Internet Engineering Course
Human–computer interfaces
Series 5300 Lithium Cell Formation System
 Is a machine that is able to take information (input), do some work on (process), and to make new information (output) COMPUTER.
Internal components of a computer.
Presentation transcript:

PacifiCorp Utility Update JSIS Meeting March, 2015

Infrastructure WISP PMU installations: 8 sites with multiple devices with single communication channel Currently reporting to WECC: 7 sites Additional (non-WISP) PMUs: 6 sites PMU part of fault recorder hardware: Ametek TR 2500 or Qualitrol IDM+

Data Management Incoming data C at 30 frames/sec Two PDC in SLC; no substation PDC PDC are running SEL-5073 software One PDC streams to WECC in Vancouver, WA the other to WECC Loveland, CO SEL-5078 Synchro-Wave software for data archiving

Engineering Applications Model Validation - Song Wang Post-Event Analysis – Song Wang Jim Bridger RAS: additional input