Ship Operations and Safety Committee Update Spring 2011 ASTA Regional Meeting, aboard Barque Eagle 9 April 2011 ASTA Ship Operations and Safety Committee.

Slides:



Advertisements
Similar presentations
EPA Ballast Water Activities Ryan Albert 12/09/2009.
Advertisements

Implementation of STCW Regulations
EPA Vessel General Permit Washington Department of Ecology Randall Marshall or
Vessel General Permit Compliance Guidance Manual Training
Clean Water Act Permitting and Operational Discharges from Vessels An Overview February 2007.
EPA Clean Water Act Vessel Discharge Obligations and Maritime Standards Development Opportunities Presented for ASTM Workshop: Opportunities for Maritime.
MT Department of Environmental Quality (DEQ) Water Protection Bureau February 12, 2014 Christine Weaver.
U.S. Coast Guard DOCUMENTS. U.S. Coast Guard Lesson Objectives Examine applicable certificates and documents for validity Examine Load Line Certificate.
Global Distress and Safety system DL 240 Spring 2014
Update on Ballast Water Management Latin American Panel Meeting Cartagena, Columbia November 1, 2011.
Implementation of STCW Regulations
XII International Seminar of Russian Maritime Register of Shipping Port State Control in the United States – 2008 Annual Report & Recent Developments Mr.
Quality Assurance/Quality Control Policy
Manning & Watch Keeping
Leading the way; making a difference North American Panel March 17, 2014 BALLAST WATER MANAGEMENT JOSEPH ANGELO DEPUTY MANAGING DIRECTOR.
Alternative compliance program
Regulations & Requirements
SSTP GlobalMET Deck Cadet Structured Shipboard Training Program
Instructions and forms
Leading the way; making a difference Latin American Panel November 6, 2013 BALLAST WATER MANAGEMENT JOSEPH ANGELO DEPUTY MANAGING DIRECTOR.
Introduction to AMSA Wes Oswin Southern Liaison (Victoria and Tasmania) Domestic Vessel Division AMSA.
Familiarization with the 2010 Manila Amendments
STCW-F Fishing Industry 2012 SASMIA.
Chapter II Master and Deck Department
Familiarization with the 2010 Manila Amendments
2010 Manila Amendments to the STCW Convention and Code – Port State Control Perspective Jeff Lantz Director, Office of Operating and Environmental Standards.
Ferries – Federal Legislative and Regulatory Outlook Edmund B. Welch Passenger Vessel Association.
LATIN AMERICAN PANEL OCTOBER 16, 2009 MARINE ISSUES JOSEPH ANGELO DEPUTY MANAGING DIRECTOR.
UPCOMING CHANGES TO CHAPTER II OF THE INTERNATIONAL CONVENTION ON STANDARDS OF TRAINING, CERTIFICATION AND TRAINING FOR SEAFARERS (STCW) By Capt I G Sangameswar.
MARCH 9, 2006 Boating Safety and Enforcement Grant Program Regulations Stakeholder Workshop Proposed Conceptual Regulations Department of Boating and Waterways.
Presentation to the HELLENIC MEDITERRANEAN PANEL HELLENIC MEDITERRANEAN PANEL (Athens, Greece - 23 October 2008)On US DISCHARGE STANDARDS -The NPDES Program-
Inspection Directions: An EMS Approach to Inspecting for Section 608 and 609 Compliance.
OVERVIEW OF CHANGES TO ENVIRONMENTAL REGULATIONS BMUSF 2010 Capt. Edward Wilmot Vice-President Great American Insurance Group.
March Why is MassDEP proposing new UST regulations? DFS’s regulation: standards for tanks construction, installation, O&M, decommissioning and.
Maritime Labour Convention, 2006
Ballast Water Management DEPUTY MANAGING DIRECTOR
Chapter VI Emergency, occupational safety, security, medical care and survival functions January Maritime Training & Human Element Section IMO Familiarization.
INTERTANKO LATIN AMERICAN PANEL MARITIME SECURITY: LATEST DEVELOPMENTS LATEST DEVELOPMENTS AT IMO JOSEPH J. ANGELO DIRECTOR, REGULATORY AFFAIRS AND THE.
Leading the way; making a difference GREEN4SEA Athens Forum April 9, 2014 UPDATE ON BALLAST WATER MANAGEMENT JOSEPH ANGELO DEPUTY MANAGING DIRECTOR.
Leading the way; making a difference Lunchtime Seminar October 10, 2012 Ballast Water Management JOSEPH ANGELO DEPUTY MANAGING DIRECTOR.
Authority: Who Does What?. Los Angeles – Long Beach Area Contingency Plan Marine Firefighting and Salvage Plan.
Leading the way; making a difference Ballast Water Management State of Affairs Hong Kong, 26 November 2013 Tim Wilkins INTERTANKO Senior Manager - Environment.
Leading the way; making a difference Ballast Water Management State of Affairs October 2013 Tim Wilkins INTERTANKO Technical Seminar Busan, 21 October.
MSRA Implementation Status Update. 2 Implementation Strategy Divide tasks Priority 1 – Due date specified in the Act Priority 2 – Required, but no due.
Clean Boating Act of 2008 (P.L ) Sport Fishing & Boating Partnership Council March 4, 2011.
EPA Vessel General Permit
U.S. Department of Transportation Pipeline and Hazardous Materials Safety Administration Oil Spill Response Plans A History Lesson PHMSA Review and Approval.
U. S. Coast Guard Regulatory / Legislative Developments Rear Admiral Bill Baumgartner WISTA 2008 Annual Conference October 2008 U.S. Coast Guard Judge.
M O N T E N E G R O Negotiating Team for the Accession of Montenegro to the European Union Working Group for Chapter 14 – Transport policy Bilateral screening:
MONTENEGRO Negotiating Team for the Accession of Montenegro to the European Union Working Group for Chapter 1 – Free movement of goods Bilateral screening:
Dabney P. Hegg Senior Professional Staff U.S. Senate Committee on Commerce, Science and Transportation.
TANKER FORUM May 27, 2016 BALLAST WATER MANAGEMENT IN THE US
What to Expect in the Maritime Policy in the 111th Congress
Sail through your OOW Deck Qualifications with the PYA
U. S. Coast Guard Regulatory / Legislative Developments
GCC CODE “THE SAFETY REGULATIONS FOR SHIPS THAT ARE NOT COVERED BY THE INTERNATIONAL CONVENTIONS” THE CABINET RESOLUTION NO.(29) OF 2013.
UPDATE ON US LEGAL ISSUES NORTH AMERICAN PANEL MEETING 24 OCTOBER 2006
33CFR158 COA.
TWIC Compliance MERPAC Meeting April 17, 2009 LT Devon Brennan
Comprehensive Review of the STCW Convention
Mariner Credentialing Program Policy Division CG-CVC-4
Comprehensive Review of the STCW Convention
Office of Merchant Mariner Credentialing CG-MMC
Reconsideration and Appeals
MEPAC March 2017 Task 95 Inland Fire Fighting Requirement's for towing vessel watch officers MASTERS/PILOTS Maritime Services Group of Louisian, LLC.
Comprehensive Review of the STCW Convention
Know Your Revised Alternate Security Program (ASP) Jen Wilk
The Polar Code Rear Admiral Steven D. Poulin United States Coast Guard
North American Emission Control Area
Keith Manch Director of Maritime New Zealand
Presentation transcript:

Ship Operations and Safety Committee Update Spring 2011 ASTA Regional Meeting, aboard Barque Eagle 9 April 2011 ASTA Ship Operations and Safety Committee Update, ASTA Regional Meeting, aboard Barque Eagle 9 April 2011

ASTA Ship Operations and Safety Committee (SOS) Standing committee prescribed by bylaws Looks after regulatory, safety, and operational considerations which could affect member vsls Members Jonathan Boulware, C HAIR Simon Colley Deborah Hayes hip Jennifer Haddock Eric Jones Jonathan Kabak ASTA Ship Operations and Safety Committee Update, ASTA Regional Meeting, aboard Barque Eagle 9 April 2011

What’s new? ADA USCG Sailing Vessel Rig Inspections Increased Passenger Weight MERPAC AIS requirements EPA Vessel General Permit ECDIS STCW Integration Into US Mariner Licensing ASTA Ship Operations and Safety Committee Update, ASTA Regional Meeting, aboard Barque Eagle 9 April 2011

American With Disabilities Act New rule in effect as of 3 JAN 2011 Primarily affects ferries and overnight cruise vessels since they provide “transportation” from point A to point B. But… 2 nd rule in effect 15MAR2011 which affects passenger vessels ASTA Ship Operations and Safety Committee Update, ASTA Regional Meeting, aboard Barque Eagle 9 April 2011

Effects of ADA rule Prohibits owners and operators of passenger vessels from discriminating against passengers on the basis of a disability Requires passenger vessels and facilities to be accessible Requires that vessels and facilities take steps to accommodate disabilities ASTA Ship Operations and Safety Committee Update, ASTA Regional Meeting, aboard Barque Eagle 9 April 2011

DOT vs. DOJ Authority DOT: primarily engaged in transportation of people. Ferries, overnight cruise DOJ: not primarily transportation (there is some ambiguity about where some of our vessels fall in this scheme) ASTA Ship Operations and Safety Committee Update, ASTA Regional Meeting, aboard Barque Eagle 9 April 2011

What you must do Allow use of aids unless doing so compromises legitimate safety requirements Keep a current copy of the regs on each vessel ASTA Ship Operations and Safety Committee Update, ASTA Regional Meeting, aboard Barque Eagle 9 April 2011

What you can do Create eligibility criteria Furnish appropriate aids to provide access DOJ Final Rule: 28 CFR Part 36, 75 FR DOT Final Rule: 49 CFR Part 39, 75 FR and 75 FR ASTA Ship Operations and Safety Committee Update, ASTA Regional Meeting, aboard Barque Eagle 9 April 2011

Sailing Vessel Rig Inspections A USCG/ASTA collaborative effort 2 fatalities in Hawaii led to USCG becoming “rig-aware” ASTA working with Senior Travelling Marine Inspection staff to create protocol Awaiting peer review Will result in a Memorandum of Understanding ASTA Ship Operations and Safety Committee Update, ASTA Regional Meeting, aboard Barque Eagle 9 April 2011

The Big Idea Master as arbiter and responsible party Monthly inspections Careful documentation Opt-in system Third party inspections still OCMI discretion ASTA Ship Operations and Safety Committee Update, ASTA Regional Meeting, aboard Barque Eagle 9 April 2011

Requirements for Rig Inspections 1.A monthly, thorough rig inspection, using an approved checklist. 2.Careful documentation of routine rig maintenance, problems, and corrective action. 3.Log entries for all replacements and other major maintenance. ASTA Ship Operations and Safety Committee Update, ASTA Regional Meeting, aboard Barque Eagle 9 April 2011

The Choices Pending final action by the USCG in the creation of a national rigging inspection policy: ASTA members encouraged to use the checklist and DRAFT protocol to manage inspections/incidents with the USCG Alternately, the concepts in Honolulu Inspection Note 13 are fast becoming the national standard and have been successfully applied to traditional vessels ASTA Ship Operations and Safety Committee Update, ASTA Regional Meeting, aboard Barque Eagle 9 April 2011

AIS (Automatic Identification System) Currently required on vessels carrying 150 or more passengers Proposed rule would include 50 or more passengers or >65’ Final Rule Pending, currently no action Stay tuned ASTA Ship Operations and Safety Committee Update, ASTA Regional Meeting, aboard Barque Eagle 9 April 2011

Increased Passenger Weight New AAWPPof 185 lbs. is effective NOW Operators must prove compliance not later than 1 Dec 2011 New stability letters will come out as USCG can allocate resources, in some cases 2012 ASTA Ship Operations and Safety Committee Update, ASTA Regional Meeting, aboard Barque Eagle 9 April 2011

Increased AAWPP Five Ways to Comply 1.Weight Ratio (160 x # of Pass / 185) 2.Weight Compensation (remove other stuff) 3.Direct Verification (weigh ‘em at the rail) 4.Stability Calculations 5.New Stability Proof Test ASTA Ship Operations and Safety Committee Update, ASTA Regional Meeting, aboard Barque Eagle 9 April 2011

Increased AAWPP: some cautionary notes Existing stability data may not be adequate to simply recalculate stability numbers. New SPT might be required. USCG is NOT going to get to all of us by 1 DEC 2011, but you still must prove compliance. Plan ahead: we aren’t getting any skinnier. ASTA Ship Operations and Safety Committee Update, ASTA Regional Meeting, aboard Barque Eagle 9 April 2011

ECDIS

Electronic Chart Display and Information System – Not just your average chart plotter – Training in safe navigation using ECDIS is now a primary requirement in the STCW-2010 Manila Amendments for all mates and masters standing watch on vessels fitted with ECDIS. The new ECDIS competency requirements of Tables A-II/1 and A-II/2 for vessels of 3,000 gross tons or more (and A-II/3 for less than 3,000 gross tons, for that matter) are clear and detailed: ECDIS must contribute to the safety of navigation. – Use ECDIS functions involving the integration with other sensors, including (when fitted) alternate position source, sounder, ARPA, AIS and radar overlay.

ECDIS Electronic Chart Display and Information System (ECDIS) will be required training for all deck officers on all vessels that are equipped with ECDIS. ECDIS will be treated the same as ARPA or the GMDSS training, where it is an STCW restriction from serving on equipped vessels if you don’t have these training certifications. By January 1, 2012 nearly all vessels more than 200 gross tons will be required under a separate law to have ECDIS equipment. By default, any deck officer on vessels of more than 200 tons will need ECDIS training. There will be two levels of ECDIS, operational and management dealing with the different responsibilities of each. – Expect a phase in period for those grandfathered into new regulations. ECDIS systems can replace paper charts

All About ECDIS All About ECDIS

ASTA Ship Operations and Safety Committee Update, ASTA Regional Meeting, aboard Barque Eagle 9 April 2011

EPA-National Pollutant Discharge Elimination System (NPDES) Regulates Incidental Discharge from “Normal Operations” of vessels Incidental Discharge i.e. Ballast Water, Bilge Water, Gray Water, Anti-Fouling Paint, etc… Materials that may result in negative environmental impacts ASTA Ship Operations and Safety Committee Update, ASTA Regional Meeting, aboard Barque Eagle 9 April 2011

Vessel General Permit (VGP) The means by which the EPA is regulating vessels that must comply with the NPDES Who is NOT subject to this permit: Military Vessels Recreational Vessels as defined in Sec 502(25) of the Clean Water Act With the exception of ballast water, non-recreational vessels <79 Feet (24.08Meters) All commercial fishing vessels regardless of length These vessels are covered in other sections of the Clean Water Act ASTA Ship Operations and Safety Committee Update, ASTA Regional Meeting, aboard Barque Eagle 9 April 2011

VGP-Scope and Applicability General Scope of this Permit This permit is applicable to discharges incidental to the normal operation of a vessel identified in Part into waters subject to this permit. These waters are “waters of the United States” as defined in 40 CFR (extending to the outer reach of the 3 mile territorial sea as defined in section 502(8) of the CWA). This includes all navigable waters of the Great Lakes subject to the jurisdiction of the United States. Recreational vessels as defined in section 502(25) of the Clean Water Act are not subject to this permit. Such vessels are not subject to NPDES permitting under Section 402 of the Clean Water Act, and are instead subject to regulation under Section 312(o) of the Clean Water Act. In addition, with the exception of ballast water discharges, non-recreational vessels less than 79 feet (24.08 meters) in length, and all commercial fishing vessels, regardless of length, are not subject to this permit. See P.L Commercial fishing vessels and other non- recreational vessels less than 79 feet are eligible for permit coverage under this permit for their ballast water discharges. If auxiliary vessels or craft, such as lifeboats, rescue boats, or barges onboard larger vessels require permit coverage (i.e. they are greater than 79 feet in length), they are eligible for coverage under this permit and are covered by submission of the Notice of Intent for the larger vessels. Nothing in this permit shall be interpreted to apply to a vessel of the Armed Forces as defined in § 312(a)(14) of the Clean Water Act. ASTA Ship Operations and Safety Committee Update, ASTA Regional Meeting, aboard Barque Eagle 9 April 2011

Vessel General Permit If you are subject to the VGP what do you need to do? <300 Gross Tons – If your vessel is less than 300 gross tons and your vessel does not have the capacity to hold or discharge more than 8 cubic meters (2113 gallons) of ballast water, you do not need to submit an NOI; you automatically receive coverage under this permit and are authorized to discharge in accordance with the conditions set forth within. ASTA Ship Operations and Safety Committee Update, ASTA Regional Meeting, aboard Barque Eagle 9 April 2011

Vessel General Permit >300 Gross Tons/Carry >8 Cubic Meters of Ballast Water – Must file NOTICE OF INTENT (NOI) to discharge under the permit » If you submit an NOI, EPA strongly encourages you to prepare and submit your NOI using EPA’s Electronic Notice of Intent (eNOI) system ( ASTA Ship Operations and Safety Committee Update, ASTA Regional Meeting, aboard Barque Eagle 9 April 2011

The VGP Vessel VGP November 2010 – Inspections, Monitoring, Reporting, and Recordkeeping – Routine Visual Inspections Documentation of the Routine Vessel Inspection – Analytical Monitoring – Comprehensive Annual Vessel Inspections – Drydock Inspection Reports – Recordkeeping ASTA Ship Operations and Safety Committee Update, ASTA Regional Meeting, aboard Barque Eagle 9 April 2011

VGP-Record Keeping It is not the intention of this permit to require separate records for the Coast Guard and EPA. Rather, vessels can harmonize their recordkeeping practices, where appropriate, so that records are not unnecessarily duplicative…. Operators may choose how these records will be maintained, but must retain these records on the vessel for a period of 3 years. The vessel master, owner/operator, or person in charge shall make available to EPA or an authorized representative from EPA all records kept under this section upon request. ASTA Ship Operations and Safety Committee Update, ASTA Regional Meeting, aboard Barque Eagle 9 April 2011

Reporting One-Time Permit Report – For each vessel, owner/operators are required to submit a one-time report between 30 months and 36 months after obtaining permit coverage. ASTA Ship Operations and Safety Committee Update, ASTA Regional Meeting, aboard Barque Eagle 9 April 2011

EPA/USCG MOU ASTA Ship Operations and Safety Committee Update, ASTA Regional Meeting, aboard Barque Eagle 9 April 2011

EPA-VGP Where to find more information: – EPA Vessel General Permit Information EPA Vessel General Permit Information – – PVA Guidance to Members PVA Guidance to Members – _VGP.pdf _VGP.pdf ASTA Ship Operations and Safety Committee Update, ASTA Regional Meeting, aboard Barque Eagle 9 April 2011

Integrating STCW into the USCG Licensing Scheme

Nov 2009 USCG issues notice of proposed rule making (NPRM) – Brings all Ocean and Near Coastal licenses into full STCW compliance – Major increases in sea service to attain Ocean and Near Coastal licenses – ASTA responds during comment period with written statement and presents additional statement during USCG comment session – USCG delays implementation until after 2010 Manila Convention

2010 June 2010 STCW changes approved by “Manila Amendments” USCG plans full implementation by January 1, 2012 – USCG still has not issued revised NPRM – Entire maritime industry is awaiting information

2011 We’re still waiting……. Guaranteed Changes – End to 500ton Ocean Master loophole – ECDIS requirements – BST Refresher for all mariners – Changes in sea service requirements (ASTA to pursue tonnage calc or other alternative) – Increase in training classes required for licensure

ASTA Ship Operations and Safety Committee Update, ASTA Regional Meeting, aboard Barque Eagle 9 April 2011

A few more things to watch DSC required on all passenger vessels by 16 DEC 2011 New NVIC (9-97 Change 1) re: Structural Fire Protection (effective 1 APR 2011) Phase out of life floats and buoyant apparatus by 1 JAN 2015 Possible exemption of TWIC req’t for vessels not required to have a security plan ASTA Ship Operations and Safety Committee Update, ASTA Regional Meeting, aboard Barque Eagle 9 April 2011

A few more things to watch Texting and Sailing: USCG Marine Safety Alert re: Distracted Operation(will this be a rule?) ASTA Ship Operations and Safety Committee Update, ASTA Regional Meeting, aboard Barque Eagle 9 April 2011

Thank You Ship Operations and Safety Committee ASTA Ship Operations and Safety Committee Update, ASTA Regional Meeting, aboard Barque Eagle 9 April 2011