Site Specific Fumigant Management Plan And Post Application Summary Joel Kangiser WSDA.

Slides:



Advertisements
Similar presentations
(Individuals with Disabilities Education Improvement Act) and
Advertisements

EMS Checklist (ISO model)
P RIVATE A PPLICATOR R ECERTIFICATION North Carolina Department of Agriculture & Consumer Services Structural Pest Control & Pesticides Division,
Our Vision – Healthier Kansans living in safe and sustainable environments.
Chapter 7: Key Process Areas for Level 2: Repeatable - Arvind Kabir Yateesh.
Safety and Health Management Program
© 2009 Michigan State University licensed under CC-BY-SA, original at Control of Nonconforming Product.
HAZARD COMMUNICATIONS / E N V I R O N H & S T R A I N I N G P R O G R A M HAZARD COMMUNICATION PROGRAM OSHA Standard 29 CFR The OSHA hazard communication.
Protections for Agricultural Workers Agricultural Hazard Communication Act Texas Right to Know (RTK) Regulations.
GAP/Food Safety for Fruit and Vegetable Growers
The BWC Division of Safety & Hygiene’s OSHA On-Site Consultation Program.
OSHA Office of Training and Education 1 Hazard Communication.
PowerPoint Presentation by Charlie Cook The University of West Alabama SECTION 5 Employee Relations CHAPTER 14 Risk Management and Worker Protection.
Responsibilities for Agricultural Employers Agricultural Hazard Communication Act Texas Right to Know (RTK) Regulations Local Fire Chief Notification.
Module Three Chapters 7, 8, & 9. Chapter 7 Site Assessment and Weather.
June 1, 2015 Environmental, Health and Safety Services Compliance Expectations and University Policy 1005.
New Requirements For Soil Fumigant Pesticide Products EPA and UGA Grower Trainings Nov 2010 Culpepper and Sumner.
OSHA Office of Training and Education 1 Hazard Communication.
Western Regions Pesticide Meeting May 2010 Inspection Checklist.
Western Regions Pesticide Meeting May 2010 Tools, Calculators And Mapping Tools.
2010 Fumigant Handler and Worker Protection Measures Western Regions Pesticide Meeting May 2010.
Norton, 2010 E. Randall Norton, Ph.D. The University of Arizona Safford Agricultural Center.
Overview and Implementation Schedules Richard Keigwin, Director EPA Pesticide Re-evaluation Division.
Environmental Management Systems Refresher
Registrant Requirements; EPA, Registrant, and Partner Roles in Training Richard Keigwin, Director Pesticide Re-evaluation Division.
Regulatory Body MODIFIED Day 8 – Lecture 3.
EPA Resource Development And Outreach Activities John Leahy, EPA Pesticide Re-evaluation Division.
LAUSD INJURY AND ILLNESS PREVENTION PROGRAM FOR SUPERVISORS AND EMPLOYEES As required by California Code of Regulations, Title 8, Section 3203.
October Module 7: Recordkeeping Overview: In this section, you will learn about records required for each job. Records must be retained and made.
Fumigant Management Plans and Post Application Summary Reports Module 6 Soil Fumigant RED Requirements.
WHS Management Plans.
Good Agricultural Practices (GAPs) Module 4 Soil Fumigant RED Requirements.
1 Introducing BSI Health & Safety Self-assessment Online.
HAZWOPER Overview.
THE WORKER PROTECTION STANDARD Pesticide Emphasis Program Oregon OSHA.
FDA Recalls Risk Communication Advisory Committee David K. Elder Director, Office of Enforcement.
Preliminary Assessment Tribal Emergency Response Preparedness Dean S. Seneca, MPH, MCURP Agency for Toxic Substances and Disease Registry Centers for Disease.
CSWEA Fall Seminar Maintenance and Safety Nancy Quick, CIH, CSP Compliance Assistance Specialist OSHA North Aurora Office Phone:
PENNSAFE ONLINE HSSF Pennsylvania Worker & Community Right to Know Act
Module 1 Chapter 1, 2, and 3. Chapter 1 Overview of Soil Fumigants and Soil Fumigation.
Managing Pre-Hospital Exposures PRODUCED BY RI Department of Health, Division of EMS & Hospital Association of Rhode Island.
Basics of OHSAS Occupational Health & Safety Management System
OSHAX.org - The Unofficial Guide To the OSHA1 Hazard Communication.
HAZARD COMMUNICATION JANUARY 2010 Code 12/2010. Hazard Communication HAZARD COMMUNICATION.
Ministry of the Environment Certificates of Approval for an Anaerobic Digestion Facility Post Construction DIGGING INTO BIOGAS DETAILS WORKSHOP April 5,
OREGON OSHA PESTICIDE EMPHASIS PROGRAM ANNUAL REPORT FFY 2009.
Preparing for Disasters General Liability. Introduction  The one coverage that provides you and your business the most protection is General Liability.
Hazard Communication. Introduction !About 32 million workers work with and are potentially exposed to one or more chemical hazards !There are approximately.
1 Thank you for visiting our site and welcome to the “Introduction to ISO 22000” Presentation that you requested. For more information.
Organization and Implementation of a National Regulatory Program for the Control of Radiation Sources Regulatory Authority.
-Emergency Preparedness and Response - Difficult to Evacuate Sites - Notice to State Lead Agencies (2011) Module 8 Soil Fumigant RED Requirements.
Registrant Requirements (2010 & 2011) Module 9 Soil Fumigant RED Requirements.
New Requirements For Soil Fumigant Pesticide Products EPA - August 2010 Soil Fumigant RED Requirements Training Program Module 1: The EPA Regulatory Process.
NEW PHOSTOXIN LABELING
Worker Protection Standard 40 CFR –
IAEA International Atomic Energy Agency Industrial Radiography Emergency Preparedness Day 5 – Lecture 8.
Soil Fumigant Training Requirements & Implementation Presented by Jeanne Kasai, EPA to the 13 th Annual Conference of The Pesticide Stewardship Alliance.
OSHA Office of Training and Education 1 Hazard Communication.
Department of Defense Voluntary Protection Programs Center of Excellence Development, Validation, Implementation and Enhancement for a Voluntary Protection.
Instructions The Town of Sylvan Lake’s computer based health and safety orientation is simple process. Read each slide carefully To navigate through slides.
EPA WPS Frequently Asked Questions [version released April 14, 2016]
Hot Work Loss Prevention Program
Flooding Walkdown Guidance
Goodyear Napanee Contractor Safety
Hazardous Waste Generator Improvements Rule
Instructions The Town of Sylvan Lake’s computer based health and safety orientation is simple process. Read each slide carefully To navigate through slides.
Health and Safety! By jack Hughes.
Understanding the Space Park Requirements
ICS Staff One person is responsible for overall ICS and can delegate the responsibilities so that for each procedure or task of the ICS, one person is.
Risk Management NDS Forum June 23rd 2010.
Presentation transcript:

Site Specific Fumigant Management Plan And Post Application Summary Joel Kangiser WSDA

Site-specific management plan before fumigation begins. FMPs help to… Ensure fumigators successfully plan all aspects of a safe and effective fumigation Prevent accidents, ensure label compliance, and identify appropriate procedures in case of accidents or unforeseen events Demonstrate compliance with label requirements and are a tool for verifying compliance.

Grower, crop consultant or others may prepare the FMP, but Certified Applicator must verify accuracy in writing (sign and date) Preparation and Verification

Farm-wide FMP is an option Common information captured once Applicator and handler information, emergency plans, etc. Information unique to each block captured separately. Block location, map, buffers, application dates, weather conditions, etc.

2010 Requirements… General Site and Applicator Information Application Procedures Measurements for GAP compliance Worker Protection Information (PPE to be worn by handlers, etc)

2010 Requirements (Cont’d) Air Monitoring and Hazard Communication Posting (treated area) and record-keeping procedures Emergency plans and procedures Safe handling information provided Post-application summary report

How buffers were determined, including credits Site map or sketch Measurements taken to verify credits warranted Buffer zone posting procedures

2011 Requirements (Cont’d) Emergency preparedness and response procedures (if required for a site) Applicator training records State notification record (if required by the state)

EPA Templates Currently Have Methyl Bromide Templates Turbo Tax In Progress Dealer/Consultant Versions In Progress Roll Your Own

10 FMP Sample Template

11 Figure 1. Example of Introductory Screen

12 Figure 2. Example of screen illustrating applicator and other general information

13 Figure 3. Example of screen illustrating general site information

14 Figure 4. Example of screen illustrating general application information

Handlers involved in the application for viewing on site. Enforcement personnel, upon request. Emergency response personnel, in case of an emergency.

Post Application Summary Documents any deviations from the FMP, such as weather conditions, actual application dates, etc. Completed within 30 days of the application; keep with FMP Not necessary if there are no changes from FMP

17 FMP Record Keeping FMPs & Post Application Summaries - 2 years by – The supervising certified applicator and – The owner/operator (if not the certified applicator) Along with other records required for application of RUPs Possibly combine FMP and Application Record?

Realistic to bring all applicators to level of large operations that have resources to create FMPs? Will it be counter-productive – eg, will applicators not comply because the requirements are too extensive? What good will it be to Hispanics who cannot read English and are very likely at a low literacy level in their native Spanish?

Comments/Concerns… Commercial Applicators will need to become much more familiar with a farm Keep it simple – Can a typical soil fumigator understand what the label requires in the FMP? And finally… Patience, Patience, Patience – Will need to provide much technical assistance.

Questions ???