Uli Schäfer 1 (Not just) Backplane transmission options Upgrade will always be in 5 years time.

Slides:



Advertisements
Similar presentations
Uli Schäfer Trigger Status JEP (JET/ENERGY PROCESSOR) Komponenten JEM0 (JET/ENERGY MODULE) -Hardware -Firmware JEM1 nächste Tests / Termine Production.
Advertisements

GOLD Generic Opto Link Demonstrator Uli Schäfer 1.
Uli Schäfer JEM Status and Test Results Hardware status JEM0 Hardware status JEM1 RAL test results.
Uli Schäfer JEM Status and plans Hardware status JEM0 Hardware status JEM1 Plans.
GOLD Generic Opto Link Demonstrator Uli Schäfer 1.
Phase-0 Topological Processor Uli Schäfer Johannes Gutenberg-Universität Mainz Uli Schäfer 1.
L1Calo – towards phase II Mainz upgraders : B.Bauss, V.Büscher, R.Degele, A.Ebling, W.Ji, C.Meyer, S.Moritz, U.Schäfer, C.Schröder, E.Simioni, S.Tapprogge.
Programmable logic devices / tools Programmable logic devices are digital logic devices, providing combinatorial logic (gates, look-up tables) and flip-flops.
ATLAS L1 Calorimeter Trigger Upgrade - Uli Schäfer, MZ -
GOLD Status and Phase-1 Plans Andi E. & Uli S. Uli Schäfer 1.
Uli Schäfer 1 BLT – status – plans BLT – backplane and link tester Recent backplane test results Test plans – week June 15.
Phase-0 topological processor Uli Schäfer Johannes Gutenberg-Universität Mainz Uli Schäfer 1.
Level-1 Topology Processor for Phase 0/1 - Hardware Studies and Plans - Uli Schäfer Johannes Gutenberg-Universität Mainz Uli Schäfer 1.
Phase-1 with new JEP Uli Schäfer Johannes Gutenberg-Universität Mainz Uli Schäfer 1.
JEM upgrades and optical data transmission to FEX for Phase 1 Andi E. & Uli S. Uli Schäfer 1.
Uli Schäfer 1 S-L1Calo upstream links architecture -- interfaces -- technology.
Phase-1 with new JEP Uli Schäfer Johannes Gutenberg-Universität Mainz Uli Schäfer 1.
Uli Schäfer 1 Mainz L1Calo upgrade activities news – BLT hardware/firmware status.
Cluster Processor Module : Status, test progress and plan Joint Meeting, Mainz, March 2003.
Uli Schäfer JEM Plans Status (summary) Further standalone tests Sub-slice test programme JEM re-design Slice test.
Uli Schäfer 1 JEM: Status and plans Pre-Production modules Status Plans.
Uli Schäfer 1 JEM PRR Design changes Post-FDR tests FDR issues.
Uli Schäfer 1 (Not just) Backplane transmission options.
5th April, 2005JEM FDR1 Energy Sum Algorithm In all stages saturate outputs if input is saturated or arithmetic overflow occurs Operate on 40Mb/s data.
S. Silverstein For ATLAS TDAQ Level-1 Trigger updates for Phase 1.
Samuel Silverstein Stockholm University L1Calo upgrade hardware planning + Overview of current concept + Recent work, results.
Uli Schäfer 1 JEM1: Status and plans Hardware status Firmware status Plans.
Uli Schäfer JEM0 (*) JEM0 Hardware : overview, history, and status JEM0 Firmware : algorithms, status JEM – plans and timescale (*) Module0 specifications.
Uli Schäfer 1 JEM: Status and plans Pre-Production modules Status Plans.
Uli Schäfer 1 JEM: Status and plans JEM1.2 Status Test results Plans.
Uli Schäfer 1 (Not just) Backplane transmission options Uli, Sam, Yuri.
Uli Schäfer 1 JEM1: Status and plans JEM1.1 Status Plans.
Uli Schäfer 1 CP/JEP backplane test module What’s the maximum data rate into the S-CMM for phase-1 upgrade ?
Uli Schäfer 1 Production modules Status Plans JEM: Status and plans.
Uli Schäfer 1 JEM1: Status and plans Hardware status Firmware status Plans.
Uli Schäfer JEM Status and plans RAL test results Hardware status Firmware Plans.
Uli Schäfer JEM hardware / test JEM0 test programme Mainz standalone RAL sub-slice test JEM re-design Heidelberg slice test.
S. Silverstein For ATLAS TDAQ Level-1 Trigger upgrade for Phase 1.
Uli Schäfer 1 JEM1: Status and plans power Jet Sum R S T U VME CC RM ACE CAN Flash TTC JEM1.0 status JEM1.1 Plans.
Uli Schäfer 1 (Not just) Backplane transmission options.
Uli Schäfer JEM Status and plans Firmware Hardware status JEM1 Plans.
Uli Schäfer 1 JEM: Status and plans Production / commissioning Plans.
Uli Schäfer JEM Status and plans Algorithms Hardware JEM0, JEM1 Tests Plans.
Uli Schäfer 1 Production modules Status Plans JEM: Status and plans.
Status and planning of the CMX Philippe Laurens for the MSU group Level-1 Calorimeter Trigger General Meeting, CERN May 24, 2012.
JEP HW status and FW integration plans Uli Schaefer and Pawel Plucinski Johannes-Gutenberg Universitaet Mainz Stockholm University.
CMX (Common Merger eXtension module) Y. Ermoline for CMX collaboration Preliminary Design Review, Stockholm, 29 June 2011.
Topology System Uli Schäfer 1 B.Bauß, V.Büscher, W.Ji, U.Schäfer, A.Reiß, E.Simioni, S.Tapprogge, V.Wenzel.
Atlas L1Calo CMX Card CMX is upgrade of CMM with higher capacity 1)Inputs from JEM or CPM modules – 40 → 160Mbps (400 signals) 2)Crate CMX to System CMX.
L1Topo Status & Plans Uli Schäfer 1 B.Bauß, V.Büscher, W.Ji, S.Krause, S.Moritz, U.Schäfer, A.Reiß, E.Simioni, S.Tapprogge, V.Wenzel.
Hardware status GOLD Generic Opto Link Demonstrator Assess the use of optical backplane connectivity for use on L1Calo Uli Schäfer 1.
Uli Schäfer 1 JEM configurator progress FPGAs are RAM-based programmable logic devices Need to be loaded with a ‘configuration’ after power-up, so as to.
L1Topo-phase0 Uli Schäfer 1. Topo GOLD successfully used to explore technologies and initially verify 6.4Gb/s link integrity over moderate length electrical.
Uli Schäfer 1 JEM Status and plans Hardware -JEM1 -Status Firmware -Algorithms -Status Plans.
CMX status and plans Yuri Ermoline for the MSU group Level-1 Calorimeter Trigger Joint Meeting CERN, October 2012,
Status and planning of the CMX Wojtek Fedorko for the MSU group TDAQ Week, CERN April , 2012.
CMX Hardware Overview Chip Brock, Dan Edmunds, Philippe Yuri Wojciech Michigan State University 12-May-2014.
Uli Schäfer 1 From L1Calo to S-L1Calo algorithms – architecture - technologies.
ATLAS Trigger / current L1Calo Uli Schäfer 1 Jet/Energy module calo µ CTP L1.
JFEX Uli Schäfer 1 Mainz. L1Calo Phase-1 System Uli Schäfer 2 CPM JEM CMX Hub L1Topo ROD JMM PPR From Digital Processing System CPM JEM CMX Hub L1Topo.
Hardware status GOLD Generic Opto Link Demonstrator Uli Schäfer 1.
17 December, 2010 ATLAS L1Calo upgrade meeting Meeting overview Recent hardware developments, ideas.
L1Topo post review Uli Schäfer 1 Observations, options, effort, plans Uli.
CMM++ activities at MSU Y. Ermoline et al. Level-1 Calorimeter Trigger Joint Meeting, CERN, 13 – 17 September 2010.
Samuel Silverstein, SYSF ATLAS calorimeter trigger upgrade work Overview Upgrade to PreProcessor MCM Topological trigger.
CMX: Update on status and planning Yuri Ermoline, Wojciech Dan Edmunds, Philippe Laurens, Chip Michigan State University 7-Mar-2012.
Uli Schäfer 1 Mainz R&D activities. Uli Schäfer 2 MZ R&D BLT has been built and tested (backplane transmission only). A few minor issues were found. Possible.
ATLAS calorimeter and topological trigger upgrades for Phase 1
CMX Status and News - post PRR -
(Not just) Backplane transmission options
Presentation transcript:

Uli Schäfer 1 (Not just) Backplane transmission options Upgrade will always be in 5 years time

Uli Schäfer 2 Preliminary design for phase 1 had been suggested Extract topological information from digital processors (firmware upgrade) Replace CMMs by serialiser w. fibre output Up to 160 Mb/s backplane data rate 3 Gb/s optical out Aggregate bandwidth at merger slot 64Gb/s Total bandwidth of JEP and CP ~700Gb/s Two-stage top level calorimeter processor (quad) ?Hard facts on backplane bandwith limits ?Detailed algorithms ?Simulation ?Muons

Uli Schäfer 3 JEM block diagram Configuration: 6 FPGAs SystemACE chip CF card VME interface built from programmable logic (CPLD = non- volatile device) SystemAce physically connected to VME  Should be possible to flash the cards while in the module 88 pair VMEVME each 165 pins FIO 60 80Mb/s TTCdec CAN System ACE 3 x Mb/s DES Input 2 B 1 A 0 V Input 5 E 4 D 3 C Input 8 H 7 G 6 F Input X 9 W DAQ/Timing/VME To JMM G G Jet R S T U Sum DAQ To SMM ROI Opto clock mirror Opto CF card

Uli Schäfer 4 In-situ flash update via VME Connect SystemACE to VMEbus via CPLD (firmware) Have crate CPU write the flash image from file through SystemACE chip onto CF disk Create empty disk image file Loop-mount on any Linux computer Copy configuration files into image Umount and transfer to target system Have custom software write image to CompactFlash disk Status by Summer 2008: Flash writer works in Mainz Fails at CERN (USA15) for unknown reason  give up March / April, 2009: Richard Staley (B’ham) discovers and explores an issue with the L1Calo VME subsystem: VME mount module (VMM) generates data strobes not compliant with VME specs

Uli Schäfer 5 VME issue Date strobe exhibits glitches For write operations these glitches trigger read operations after a valid write access on B’ham modules No problems seen so far on JEMs, except... DS0* WRITE*

Uli Schäfer 6 Refurbish flash write firmware Keep flasher software nearly unchanged Re-work firmware such that read access is protected from glitches Start read operations only if data strobe asserted for a minimum of 50ns Finish internal read operations after a predefined delay, do not wait for data strobe being deasserted Latch the data until VME cycle finished Results: Test rig Mainz : new firmware ok now, though 2008 version fails ! Test week June 15: Flash card writer error-free on CERN test rig Error-free in USA15, all 32 JEM modules could be updated after a somewhat lengthy CPLD update procedure (successful thanks to Andrea)

Uli Schäfer 7 What next... No more need to enter the pit for FPGA firmware updates VME access tightened for flash card operations only, since no problems had been observed elsewhere Keep an eye on reliability of VME operations and have further refurbishment in case instabilities are observed Unfortunately, for any update of the VME CPLD we would again have to enter USA15 and reload each JEM individually. That would be a major intervention, if required during ATLAS running...