New Testing Resources Gary Varner Some resources in Hawaii Experience from developing integrated readout systems 1 6-OCT-2010 Electronics GPC Review.

Slides:



Advertisements
Similar presentations
Fast Timing Workshop Krakow, Nov 29 - Dec 1 st 2010 Part 2a.
Advertisements

Sci-Fi tracker for IT replacement 1 Lausanne 9. December 2010.
PD '07 Kobe -- G. Varrner 1 Compact, low-power and (deadtimeless) high timing precision photodetector readout G. Varner and L. Ruckman [University of Hawaii]
1 Bates XFEL Linac and Bunch Compressor Dynamics 1. Linac Layout and General Beam Parameter 2. Bunch Compressor –System Details (RF, Magnet Chicane) –Linear.
Chris Tennant Jefferson Laboratory March 15, 2013 “Workshop to Explore Physics Opportunities with Intense, Polarized Electron Beams up to 300 MeV”
Upcoming Review of the Hall D Photon Beam and Tagger Richard Jones, University of Connecticut, for the GlueX collaboration GlueX Collaboration Meeting.
Fabrication Process Options Gary Varner Specification Details are often Application Specific Is IBM 130nm always the best choice? 1 6-OCT-2010 Electronics.
A. Zholents, July 28, 2004 Timing Controls Using Enhanced SASE Technique *) A. Zholents or *) towards absolute synchronization between “visible” pump and.
Bingxin Yang High resolution effective K September 22-23, 2004 High-Resolution Effective K Measurements Using Spontaneous.
17 September 2010John Learned at ANT2010 Santa Fe1 Univ. of Hawaii: Steve Dye, John Learned, Shigenobu Matsuno, Marc Rosen, Michinari Sakai, Stefanie Smith,
Large Area, High Speed Photo-detectors Readout Jean-Francois Genat + On behalf and with the help of Herve Grabas +, Samuel Meehan +, Eric Oberla +, Fukun.
ANtarctic Impulsive Transient Antenna NASA funding started 2003 for first launch in 2006 Phase A approval for SMEX ToO mission 600 km radius, 1.1 million.
The Belle SVD Trigger  Tom Ziegler  Vertex 2002  Kailua-Kona, Hawaii, 4-8 th nov The Belle SVD Trigger Tom Ziegler on behalf of the Belle SVD.
Tuning in to UHE Neutrinos in Antarctica – The ANITA Experiment J. T. Link P. Miočinović Univ. of Hawaii – Manoa Neutrino 2004, Paris, France ANITA-LITE.
First detector and DAQ test results from the TEDA beamline Matt Andrew, Mike Hadmack, Bryce Jacobson, Gary Varner University of Hawaii Experience from.
Photon Source and Tagger Richard Jones, University of Connecticut GlueX Detector ReviewOctober 20-22, 2004, Newport News presented by GlueX Tagged Beam.
Trigger-less and reconfigurable data acquisition system for J-PET
SLAC XFEL Short Bunch Measurement and Timing Workshop 1 Current status of the FERMI project (slides provided by Rene Bakker) Photoinjector laser system.
Slide 1 George R. Neil Associate Director Jefferson Lab Jefferson Avenue Newport News, Virginia VUV Program Directors Review Plans for a VUV.
Development of a 20 GS/s Sampling Chip in 130nm CMOS Technology Jean-Francois Genat On behalf of Mircea Bogdan 1, Henry J. Frisch 1, Herve Grabas 3, Mary.
Radovan Milinčić and Predrag Miočinović SLAC International SalSA Workshop, February 3-4, T(CR) 3 IC Testbed for Coherent Radio Cherenkov Radiation.
A 4-Channel Waveform Sampling ASIC in 130 nm CMOS E. Oberla, H. Grabas, J.F. Genat, H. Frisch Enrico Fermi Institute, University of Chicago K. Nishimura,
M. Labiche - INTAG workshop GSI May Se - D prototype for the focal plane of the PRISMA spectrometer (Task4) Digitisers for SAGE & LISA (task1)
May 31, 2008 SuperB PID sessionMarko Starič, Ljubljana Marko Starič J. Stefan Institute, Ljubljana Report on hardware tests and MC studies in Ljubljana.
2 1/March/2015 日本物理学会大70回年次大会@早稲田大学 東大ICEPP 内山雄祐 他 MEG II collaboration.
Large Area Endplate Prototype for the LC TPC 1 D. Attié, P. Baron, D. Calvet, P. Colas, C. Coquelet, E. Delagnes, M. Dixit, A. Le Coguie, R. Joannes, S.
Research of long distance clock distribution system Université Libre de Bruxelles (IIHE) Yifan Yang, Kael Hanson, Aongus Ó Murchadha, Thomas Meures, Michael.
Introducing gigahertz-bandwidth photodetectors for the visible and near-IR spectral range that provide highest performance-to-price ratio available today!
A N DY Status Commissioning with colliding beams (p  +p  at  s=500 GeV) L.C.Bland, for AnDY 8 March 2011 Time Meeting, BNL.
Deeper Sampling CMOS Transient Waveform Recording ASICs
1 Activities in Wuhan TopMetal sensor & ALICE ITS upgade Xiangming Sun CCNU ALICE ITS Upgrade and O2 Asian Workshop 2014.
1 iTOP readout firmware development K. Nishimura and G. Varner 25-MAR-2011 lDAQ meeting Not shown: Joshua Sopher (firmware) Lili Zhang (DSP coding)
Free-Electron Laser at the TESLA Test Facility More than 50 institutes from 12 countries are involved in the TESLA Project The TESLA Collaboration: Three.
Turkish Accelerator and Radiation Laboratory at Ankara Suat ÖZKORUCUKLU İstanbul University.
Update on the Hall C Monte Carlo simulation for 12 GeV Mark Jones.
07-Jan-2010 Jornadas LIP 2010, Braga JC. Da SILVA Electronics systems for the ClearPEM-Sonic scanner José C. DA SILVA, LIP-Lisbon Tagus LIP Group * *J.C.Silva,
July LEReC Review July 2014 Low Energy RHIC electron Cooling Brian Sheehy Laser and Timing.
RD50 Michael Moll – PH-TA1-SDMeeting February 25, Three R&D strategies:  Material engineering - Defect engineering of silicon (oxygenation, dimers,
TOF code status report : raw data data visualization geometry A. De Caro for the TOF group.
Towards a 7-module Micromegas Large TPC prototype 1 D. Attié, P. Baron, D. Calvet, P. Colas, C. Coquelet, E. Delagnes, M. Dixit, A. Le Coguie, R. Joannes,
Photon Source and Tagger Richard Jones, University of Connecticut GlueX Detector ReviewOctober 20-22, 2004, Newport News presented by GlueX Tagged Beam.
RSVP AGS Upgrade Projects MECO RSVP Preliminary Baseline Review Brookhaven National Lab April 6-8, 2005 D. Phillips.
1 Rome, 14 October 2008 Joao Varela LIP, Lisbon PET-MRI Project in FP7 LIP Motivations and Proposals.
Timing System R+D for the NLC Josef Frisch. NLC and PEPII Phase and Timing Requirements (approximate)
IceRay-0 Testbed: A Radio Surface Listening Station John Kelley IceCube Collaboration Meeting April 30, 2008 UH Radio Detection Group: P. Gorham, G. Varner,
Update on the New Developments & Analysis from Hawaii Larry Ruckman & Gary Varner Instrumentation Development Laboratory (ID-Lab) University of Hawaii.
SU participation in nn bar Sam Silverstein. Who are we? Particle physics group  ATLAS  IceCube Instrumentation physics division  ATLAS L1Calo trigger.
PXIE Beam Instrumentation Status Update – Preparing for MEBT 1.1 Beam Vic Scarpine Feb. 9, 2016.
Update on works with SiPMs at Pisa Matteo Morrocchi.
Philip Bambade, Pierre Barillon, Frédéric Bogard, Selma Conforti, Patrick Cornebise, Shan Liu, Illia Khvastunov Journée PHIL
Project Overview James Fast Pacific Northwest National Laboratory.
1/20 LHCb upgrade, Jeroen van Tilburg Nikhef Jamboree, 14 Dec 2015 Preparing for the LHCb upgrade.
CALIFA - USC R&D activities: Designing and prototyping CALIFA a next generation calorimeter for R3B/FAIR Huelva July 07.
HB2008 – WG F: 27 Aug. S. Childress – Diagnostics_2MW 1 NuMI Beam Diagnostics and Control Steps to 2 MW S. Childress Fermilab.
NMLTA Protection System Update -Loss Monitors- Arden Warner September 2 nd, 2009.
PIP-II Beam Instrumentation Vic Scarpine PIP-II Machine Advisory Committee Meeting March 2016.
Overview Turkish Projects TAC / TARLA Avni Aksoy Ankara University Institute of Accelerator Technologies.
TPC for ILC and application to Fast Neutron Imaging L. An 2, D. Attié 1, Y. Chen 2, P. Colas 1, M. Riallot 1, H. Shen 2, W. Wang 1,2, X. Wang 2, C. Zhang.
WBS 1.03 Readout Systems Specifications, Design and Acceptance
PRAD DAQ System Overview
Technical Design for the Mu3e Detector
Analog FE circuitry simulation
Large Area Endplate Prototype for the LC TPC
Computers Are Your Future Eleventh Edition
Superbeams with SPL at CERN
Bubble Chamber Planning Meeting
The New Readout Electronics for the SLAC Focusing DIRC Prototype (SLAC experiment T-492 ) L. L. Ruckman, G. S. Varner Instrumentation Development Laboratory.
Jean-Francois Genat, Herve Grabas, Eric Oberla August 2d 2010
The LHCb Front-end Electronics System Status and Future Development
Presentation transcript:

New Testing Resources Gary Varner Some resources in Hawaii Experience from developing integrated readout systems 1 6-OCT-2010 Electronics GPC Review

2 Context Access to multi-project infrastructure (radio-neutrino, x-ray FEL, Super KEKB upgrade…) Test beamline in Watanabe Hall commissioned this fall intense flux, ~1ps timing Access to an array of high quality test equipment Expect Hawaii to play an expanded test/characterization role ASIC input coupling studies System timing performance Integrated detector results Key deliverable: papers for students and postdoc

3 Bremsstrahlung x-ray source: UH FEL Target: Thin Cu foil 1 mil Vacuum Al Exit Window 5 mil 10 mil polyethylene Helium filled transport line ~15” Air Plastic cover` Active Si Bulk Si 1mm 2.4um 300 um Carrier FR-4 (PCB) 62.5 mil 200 um First x-rays: September 2010!!!

4 FEL = very tight bunch specs ~ 1ps timing probe Target: Thin Cu foil 1 mil Vacuum Al Exit Window 5 mil 10 mil polyethylene Helium filled bag/volume ~15” Air Plastic cover` Active Si Bulk Si 1mm 2.4um? 300 um Carrier FR-4 (PCB) 62.5 mil 200 um Ebeam = 40MeV 200mA e- Macropulse BaF2 radiator 10 mil BaF2 Single Pulse

5 Readout for FEL x-ray beamline Detectors ASICs Front-end Module Master Module Giga-bit Fiber links cPCI crate (control room) New card CPU X-rays Master module

6 Mono-chromatic x-ray Source

7 Front-end Electronics studies J-F Genat, G. Varner, F. Tang, H. Frisch NIM A607 (2009) G. Varner and L. Ruckman NIM A602 (2009) GHz analog bandwidth, 5GSa/s Simulation includes detector response

8 Another example Detailed input characterization ANITA and Askaryan Radio Array (south pole) require high quality RF electronics characterization equipment: 8 GHz, high sensitivity Network analyzers Noise figure meters TDR Fast impulse generators In addition to piLas and other resources mentioned previously

9 Ice Radio Sampler (IRS) RF input coupling (S11) P. Gorham -- measurement

10 Ice Radio Sampler (IRS) P. Gorham -- measurement

11 Summary There is a HUGE amount of firmware and readout software development work still Use overlap with other projects to bring additional resources to bear Exploit existing capabilities for detailed characterization and insight into ways to improve ASIC/system performance Both xFEL commissioned and new test equipment since last GP Review

Backup Slides Some background context… 12

13