LLRF Requirement and Parameters at ESS Rihua Zeng, Anders J Johansson LLRF workshop, Hamburg, 2011-10- 20 1.

Slides:



Advertisements
Similar presentations
Overview of SMTF RF Systems Brian Chase. Overview Scope of RF Systems RF & LLRF Collaboration LLRF Specifications for SMTF Progress So Far Status of progress.
Advertisements

ESS Timing System Plans and Requirements Timo Korhonen Chief Engineer, Integrated Control System Division May 19, 2014.
Manchester University and the Cockcroft Institute Roger Barlow Technologies manchester.ac.uk Accelerators for ADSRs An account of the requirements.
ESS End-to-End Optics and Layout Integration Håkan Danared European Spallation Source Catania, 6 July 2011.
ESS linac Mats Lindroos, Cristina Oyon and Steve Peggs.
ESS LLRF System Anders J Johansson.
Roger Ruber, Volker Ziemann, Gergana Hamberg Uppsala University
Thomas Roser Snowmass 2001 June 30 - July 21, MW AGS proton driver (M.J. Brennan, I. Marneris, T. Roser, A.G. Ruggiero, D. Trbojevic, N. Tsoupas,
DESIGN OF A HIGH POWER TEST STAND FOR ESS SPOKE CAVITIES
ESS Linac WP8 Radio Frequency Systems and Test Facilities ESS TAC Lund, 8 July 2010 Roger Ruber (Uppsala University) for the ESS Linac RF Team.
Additional RF system issues: Amplifier linearization Reference Phase distribution Master Clock Anders J Johansson Lund University.
Linac 4 LL RF Hardware Architecture and Design Status
Discussion on Studies at Test Stands Roger Ruber Uppsala University.
ESS DTL beam commissioning
ORNL/SNS Spallation Neutron Source Low-Level RF Control System Kay-Uwe Kasemir, Mark Champion April 2005 EPICS Meeting 2005, SLAC.
RF Distribution Alternatives R.A.Yogi & FREIA group Uppsala University.
XFEL The European X-Ray Laser Project X-Ray Free-Electron Laser Stefan Simrock, DESY LLRF-ATCA Review, Dec. 3, 2007 Requirements for the ATCA based LLRF.
XFEL The European X-Ray Laser Project X-Ray Free-Electron Laser Tomasz Czarski, Maciej Linczuk, Institute of Electronic Systems, WUT, Warsaw LLRF ATCA.
LLRF ILC GDE Meeting Feb.6,2007 Shin Michizono LLRF - Stability requirements and proposed llrf system - Typical rf perturbations - Achieved stability at.
EDM2001 Workshop May 14-15, 2001 AGS Intensity Upgrade (J.M. Brennan, I. Marneris, T. Roser, A.G. Ruggiero, D. Trbojevic, N. Tsoupas, S.Y. Zhang) Proton.
CAS, BilbaoMueller, Ugena, Velez, Zerlauth May 31 st v0 SCC – Industrial ADS.
RF Development for ESS Roger Ruber and Volker Ziemann Uppsala Universitet 4 Dec Dec-20091RR+VZ: ESS RF Development.
Anders Sunesson RF Group ESS Accelerator Division
The European Spallation Source Control System
Challenges of Dual Harmonic RF Systems ISIS Synchrotron Group John Thomason.
Cavities Auto Recovery with Beam RF&Linac Section - ALBA Accelerators Division Francis Perez Angela Salom.
13 th April 2007FFAG 07 Carl Beard EMMA RF System Carl Beard, Emma Wooldridge, Peter McIntosh, Peter Corlett, Andy Moss, James Rogers, Joe Orrett ASTeC,
PROTON LINAC FOR INDIAN SNS Vinod Bharadwaj, SLAC (reporting for the Indian SNS Design Team)
Linac RF Source Recommendations for Items 22,23,24,46,47 Chris Adolphsen.
HWDB: Operations at the Spallation Neutron Source Workshop on Accelerator Operations August 6-10, 2012 Glen D. Johns Accelerator Operations Manager.
ESS LLRF and Beam Interaction. ESS RF system From the wall plug to the coupler Controlled over EPICS Connected to the global Machine Protection System.
Preliminary Functional Analysis of ESS Superconducting Radio-Frequency Linac C. Darve, N. Elias, J. Fydrych, D. Piso European Spallation Source ESS AB,
0 Plenty Energy Clean Environment Healthy Life Commissioning and Initial Operation of the KOMAC 100-MeV Proton Linac KOMAC / KAERI Kyung-Tae Seol
ESS Linac Modifications for ESSnuSB Dave McGinnis Chief Engineer / Accelerator Division August 27, 2014.
Timing System R+D for the NLC Josef Frisch. NLC and PEPII Phase and Timing Requirements (approximate)
Digital LLRF: ALBA and Max-IV cases RF&Linac Section - ALBA Accelerators Division Angela Salom.
ESS Linac WP8 Radio Frequency Systems and Test Facilities ESS/SPL Collaboration Meeting Lund, 29 June 2010 Roger Ruber (Uppsala University) for the ESS.
ESGARD – OMIA 10 & 11/09/2007 JRA on Sc cavities and Cryomodule for a Pulsed proton Linac Motivation Work Packages Partners & resources R. Garoby for S.
XFEL The European X-Ray Laser Project X-Ray Free-Electron Laser Wojciech Jalmuzna, Technical University of Lodz, Department of Microelectronics and Computer.
Overview of long pulse experiments at NML Nikolay Solyak PXIE Program Review January 16-17, PXIE Review, N.Solyak E.Harms, S. Nagaitsev, B. Chase,
Aaron Farricker 107/07/2014Aaron Farricker Beam Dynamics in the ESS Linac Under the Influence of Monopole and Dipole HOMs.
M. Munoz April 2, 2014 Beam Commissioning at ESS.
A. FaccoEURISOL DS Task 7GANIL, 30 Nov 2005 EURISOL DS 2° Meeting Task 7 - Primary Accelerator GANIL, November 30, 2005 Summary of the Task 7 status New.
ESS Linac Upgrade Dave McGinnis Chief Engineer / Accelerator Division May 27, 2014.
LLRF developments at DESY Holger Schlarb on behalf of the LLRF team LLRF Workshop 2015 Shanghai,
XFEL The European X-Ray Laser Project X-Ray Free-Electron Laser Wojciech Jalmuzna, Technical University of Lodz, Department of Microelectronics and Computer.
ESS LLRF and Beam Interaction
Rihua Zeng RF group, Accelerator division
LLRF Research and Development at STF-KEK
Uppsala Commitment to ESS and FREIA Planning
Overview and System Design for ESS LLRF Systems
LLRF for ESS: Requirements and System design
Higher Order Modes and Beam Dynamics at ESS
Second SPL Collaboration Meeting, Vancouver May 2009
Emanuele (ESS), Alessandro (CERN), Mikel (Tekniker), Hayley (ISIS)
ESS RF Development at Uppsala University
XFEL Project (accelerator) Overview and recent developments
CEPC RF Power Sources System
A Superconducting Proton/Electron Linac
RF Local Protection System
FAIR pLinac RFQ Meeting pLinac RF Power Sources
RF systems introduction
Introduction CDR Normal Conducting Linac LLRF
European Spallation Source ERIC
Phase reference RF work
Status of the ESS High Power RF Systems
RF introduction Anders Sunesson RF group leader
Roger Ruber for the FREIA team 11 June 2013, Uppsala
RF system for MEIC Ion Linac: SRF and Warm Options
PDR of Master Oscillator
Presentation transcript:

LLRF Requirement and Parameters at ESS Rihua Zeng, Anders J Johansson LLRF workshop, Hamburg,

2 Picture from C. Carlile’s presentation at IPAC 2011

3 5MW beam power 2.5 GeV protons (H+) 2.9 ms pulses 14 Hzrep rate 50 mApulse current MHz MHzRF frequency < 1 W/mbeam losses No accumulator/compressor ring ! Neutrons in 2019 ! Green field site Picture from G. Trahern’s presentation at ICALEPCS11

4

LLRF Workshop 2011, R. Zeng, A. J. Johansson5  More than 200 LLRF stations to be built by 2019 for RFQ, DTL, spoke and elliptical cavities. (One klystron for one cavity.)  Many issues to be addressed  Stringent demands from ESS leads to tough challenges Pulse length: 2.86 ms Rep rate: 14 Hz Current: 50mA

An universal recipe for LLRF? LLRF Workshop 2011, R. Zeng, A. J. Johansson

To do list LLRF Workshop 2011, R. Zeng, A. J. Johansson

To learn list FLASHSNSJPARCFerm.CERNLBNLMYHHRA RF Stab0.01%0.5%1% IF freq.250KHz 54 MHz 50 MHz 12 MHz13 MHz20 MHz56 MHz 10 MHz Sample Freq. 1 MHZ 81 MHz 40 MHz 48 MHz54 MHz 56 MHz 80 MHz77.7 MHz 40 MHz Sampl.IQOtherIQOtherIQOtherIQ CrateVME/ATC A VXIcPCIVXIVMEUSBPXI Phase Distr.. Coax Opto 8 … LLRF Workshop 2011, R. Zeng, A. J. Johansson

To be listed list LLRF Workshop 2011, R. Zeng, A. J. Johansson

Issues: multiple cavities control LLRF Workshop 2011, R. Zeng, A. J. Johansson

11 Picture from S. Peggs’s presentation at IPAC 2011

 Klystron Linearization 12  Minimize power overhead. Is 20% enough? Issues: high effeciency LLRF Workshop 2011, R. Zeng, A. J. Johansson

Issues: high availability Availability at ESS 95%  Avoid failures that cause the whole system to fail  Redundancy  Automatically detect  Fast recovery LLRF Workshop 2011, R. Zeng, A. J. Johansson

Issues: others  High intensity  Long pulse  High gradient  Spoke cavity LLRF Workshop 2011, R. Zeng, A. J. Johansson

Design guidelines Fault tolerant architecture and design – Redundancy or adaption? Easy maintenance – Generic design for all LLRF stations? – Modular design? – Auto-config and auto-calibration? Cost effective and long lived – Multiple vendors? – Software defined function by FPGA/DSP implementation for future upgrades? LLRF Workshop 2011, R. Zeng, A. J. Johansson

Main architecture of ESS LLRF FPGA based solution Separate analog mixers for down- and up-conversion I/Q-demodulation and modulation One master oscillator for the whole ESS – Phase reference for RF – Time reference for control, science Global phase reference distribution Coaxial phase reference line EPICS control system LLRF Workshop 2011, R. Zeng, A. J. Johansson

Interesting possibilities: Co-design with Beam Instrumentation – Simplify upkeep of installation – Minimize cost of units for installation and inventory Open Hardware solution – Multiple sources of hardware possible LLRF Workshop 2011, R. Zeng, A. J. Johansson

What to do in the near future Simulation for more detailed parameters and requirement LLRF Workshop 2011, R. Zeng, A. J. Johansson

Build the prototype LLRF Workshop 2011, R. Zeng, A. J. Johansson

More important, To ask more suggestions for the possible solutions at ESS Many thanks for your attention! LLRF Workshop 2011, R. Zeng, A. J. Johansson