1 Job Element Sheet Process: Cheesecake Bake – Depanning Setup Author: Andreana Crance, RIT MSD Date/Revision: 2/14/10, Rev 0 Labor Requirements: Supervisor.

Slides:



Advertisements
Similar presentations
Step-by-Step: Select a Page Orientation USE the document that is open from the previous exercise. 1.In the Page Setup group of the Page Layout tab, click.
Advertisements

Kitchen Safety & Sanitation
1 Job Element Sheet Process: Cheesecake Bake – Mixing Process Author: Andreana Crance, RIT MSD Date/Revision: 1/29/10, Rev 0 Job Element Sheet Process:
The Professional Kitchen Equipment. Preparation Equipment in. circular blade that rotates at high speed that is used to cut foods into uniform.
Handling Marking Depaneling Screen Printing Final Assembly Solder Frame Handling / Line Examples.
Job Element Sheet Process: Cheesecake Bake – Dropper Process Author: Andreana Crance, RIT MSD Date/Revision: 2/5/10, Rev 0 1. Obtain dropper2. Set up dropper.
1 Job Element Sheet Process: Cheesecake Bake – Depanning Process Author: Andreana Crance, RIT MSD Date/Revision: 2/11/10, Rev 0 Post Tunnel Oven: 1.Dump.
Dennis Sabre Fire Appliances
Andreana Crance Kevin Rodas Rob Santora Jeremy Smith Matt Syska 1.
1 Job Element Sheet Process: Cheesecake Bake – Oven Loading Process Author: Andreana Crance, RIT MSD Date/Revision: 2/13/10, Rev 0 Set-up Instructions:
Andreana Crance, Industrial & Systems Engineering Matt Syska, Industrial & Systems Engineering.
1 Job Element Sheet Process: Cheesecake Bake – Oven Loading Process w/AWP Author: Andreana Crance, RIT MSD Date/Revision: 2/13/10, Rev 0 Set-up Instructions:
© T Madas Time Height © T Madas Time Height Liquid is poured in the container at constant rate.
IV.D Student Activity Sheet 7: Modeling the Singapore Flyer
Chapter Point slope Form.
Chapter 17 Putting It All Together. Viewing the Preloader To view the preloader, 1.CTRL-Enter to test the movie. 2.View > Simulate Download.
2 tablespoons of yeast 2 cups of Boiling Water 5 cups of Bread Flour 2 tablespoons of Sugar 2 tablespoons of Oil 3 Loaf Pans Thermometer Oven Pre-Heated.
8/27/2015© Jennifer Choquette 8/27/2015© Jennifer Choquette Directions. 1.Get out a blank sheet of paper. 2.Watch the power point. 3.Label your paper.
CHEESECAKE DEPANNING Zach Alsheimer Garth Sinclair Matt Gundrum Casey Bauman.
CHEESECAKE DEPANNING Zach Alsheimer Garth Sinclair Matt Gundrum Casey Bauman.
Chapter 4 Process Design.
Managing Processes and Capabilities CHAPTER THREE.
IN YOUR SKETCHBOOK… Day 6 (negative space) Warm-up: What is negative space? How might focusing on it be used as a strategy for observational drawing?
P10712 CHEESECAKE PROCESS IMPROVEMENT Andreana Crance, Kevin Rodas, Rob Santora, Jeremy Smith, Matt Syska.
Pool Table Project.
Next “How to Add Information to The Header & Footer in Microsoft Excel” Presented by: Carmen Alexander – Student, University of Phoenix Online - 05/2005.
DO NOW!! AGENDA  CW#6 finding irregular volume  Lw#3 Volume by displacement DUE Friday Hw #5 Science Skills Week 5: Thursday Sept 10, 2015 Set up your.
Process Layout Chapter 7 July 20, 2005.
Please Do Now / Nov. 20, Sharpen Pencil 2.Collect Please Do Now from front table, chrome 3. Take out journals, write in homework -Study for 3 rd.
Damage due to fire Statistics – Scatter diagram An insurance company decided to investigate the connection between ‘ the distance from the site of a.
11.3 Perimeter and Area of Similar Figures Hubarth Geometry.
Objectives Identify three types of microorganism: bacteria, viruses, fungi. Describe the features of each of these three types of microorganism in terms.
Unit #7.  Explain the different lab group roles and their associated responsibilities.  Understand the pre-lab, lab, and post-lab procedures.  Differentiate.
 Math corrections can go in the basket  Discuss the following with your table: › The chemical formula for water is H 2 O. What does this mean? › What.
NDMC Accumulation (format: print grade-specific pages & set print layout 4 [or 2] pages per sheet)
Layouts MiniBendCenter. Intelligent load robot Pick from bulk container Bulk container scan.
MH...CH LECT-021 SYSTEMS CONCEPT Adopting a materials handling systems from overall optimization point of view. Adopting a materials handling systems.
Front Structure Load and Weld Station
KITCHEN APPLIANCES. LARGE AND SMALL Kitchen appliances are designed to make food preparation easier, faster and sometimes safer. Large appliances –Stoves.
“What” Question: What – Refers to a noun (object, event, action) Requirement: A specific noun is required “Why” Question Why – reason / cause and effect.
MSD Parbake Mezzanine Final Meeting Clem Pin (ME) Sam Phillips (ME) Graham Frasch (ME)Simon Stam (ME) Matt Lynch (EE) Stefan Colegrove(EE)
Chapter 5- Facility Equipment
Start.
Add 2 Zinc Stations + Tank Relayout Need to confirm the space with PTI
Conic Sections Advanced Higher Graphic Communication - Conic Sections
A roller is used for rolling pizza crust.
First and Third Angle Projection.
How to measure 4L of water?
How to measure 4L of water?
Centennial High School
Work together to classify the triangle below using its angles and sides.
Process Flow For Electronic Component Prep
Break down Lance rack Cut one of each of these for each rack
Draw the balance scales shown below on a blank page after Page 105.
5 × 7 = × 7 = 70 9 × 7 = CONNECTIONS IN 7 × TABLE
5 × 8 = 40 4 × 8 = 32 9 × 8 = CONNECTIONS IN 8 × TABLE
Make Ten Example: Name: ______________________
4 × 6 = 24 8 × 6 = 48 7 × 6 = CONNECTIONS IN 6 × TABLE
5 × 6 = 30 2 × 6 = 12 7 × 6 = CONNECTIONS IN 6 × TABLE
10 × 8 = 80 5 × 8 = 40 6 × 8 = CONNECTIONS IN 8 × TABLE MULTIPLICATION.
Exercise Tool Life An engineer is interested in the effects of four factors on y = life of a tool: A: Cutting speed B: Cutting angle C: Tool hardness.
3 × 12 = 36 6 × 12 = 72 7 × 12 = CONNECTIONS IN 12 × TABLE
Geometry Three Dimensions
Treasure Valley Water Reading
Unit 6 #2.2 Engineering/CAD.
Interpretation of Drawings
5 × 12 = × 12 = × 12 = CONNECTIONS IN 12 × TABLE MULTIPLICATION.
Unit 2 Test Review.
5 × 9 = 45 6 × 9 = 54 7 × 9 = CONNECTIONS IN 9 × TABLE
3 × 7 = 21 6 × 7 = 42 7 × 7 = CONNECTIONS IN 7 × TABLE
Presentation transcript:

1 Job Element Sheet Process: Cheesecake Bake – Depanning Setup Author: Andreana Crance, RIT MSD Date/Revision: 2/14/10, Rev 0 Labor Requirements: Supervisor Contact Information: Paul Adams: 2 employees: depanning 1 employee: loading bread baskets

2 Job Element Sheet New Depanning Area Current Depanning Area Conveyor Path Used Cheesecake Depanning Layout

3 Job Element Sheet Cheesecake Depanning Layout Water Spider Empty Pan Rack Work Table Conveyor Depanning Worker Stack of “Bread Baskets”

4 Job Element Sheet Process: Cheesecake Bake – Depanning Setup Author: Andreana Crance, RIT MSD Date/Revision: 2/14/10, Rev 0 1.Connect U-conveyor at tunnel oven end - At current state, wheel water receptacle to unload to pour out water 2. Set oven at correct oven speed (Contact Night Supervisor)

5 Job Element Sheet Process: Cheesecake Bake – Depanning Setup Author: Andreana Crance, RIT MSD Date/Revision: 2/14/10, Rev 0 At Proposed Depanning Station: 3. Angle blue conveyor to fit a station on both sides 4.Set up station on both sides of blue conveyor as shown below and in the drawing on the previous page Station 1 Station 2 Conveyor

6 Job Element Sheet Process: Cheesecake Bake – Depanning Setup Author: Andreana Crance, RIT MSD Date/Revision: 2/14/10, Rev 0 5. On each station (set-up similar to current process) – Foam holders – Bread baskets