Neutron Detector Shutdown Procedure 1.Turn Off Photomultiplier Tube High Voltages There are two HV channels per red module, each with it’s own black dial.

Slides:



Advertisements
Similar presentations
How to use the NEC projector Its easy! Really!. How to use the NEC projector IMPORTANT-make sure you have reserved the equipment (projector and/or laptop).
Advertisements

Whitesboro ISD Laptop Training Agenda October 2008.
Each laptop is numbered Each slot in the laptop cabinet is numbered. Be sure to pick up the laptop that has been assigned to you! Getting the Laptops.
AV Controls in the Conference Rooms Trying to Navigate the Changes.
Understanding Your Laptop A scavenger hunt designed to help you get to know your new computer.
Data Projector Setting Up/Connecting Laptop & Data Projector.
1.Cable management cover ( cpu only ) 2.Wired barcode scanner holder (optional) 3.Mouse holder and tray 4. Removable rear technology panel 5. Power cord.
Getting started with LEGO NXT Mindstorms software This is intended to be a short introduction to the LEGO Mindstorms software and programming the LEGO.
So you want to do a presentation in the Council Chamber?? No problem, here’s how… Note: If you are using the laptop to conduct your presentation, either.
Using Telemedicine Equipment. Overview The ‘Big’ Picture The ‘Bigger’ Picture Equipment Setting Up A Video Conference Conducting A Video Conference Common.
University of Manitoba A How to Guide for Theatre B & C.
AUDIO VISUAL TRAINING University Center. BLACK BOX EQUIPMENT IN CLASS University Center LCD Projector/Built In Screen Laptop Connection (VGA Cord) Control.
College of Education 103 Conference Room The Multimedia Podium.
Detailed Room Guides Select from the list of Willard Building technology classrooms to view more detailed operating instructions. The instructions are.
1 Check all equipment is included before returning. If you have an accident or the equipment is damaged or you need support please contact Blaize
Digital StarLab Set-Up, Operation, Maintenance, and Teacher Manual for the Digital StarLab are in the links below or on the training tab in the BlackBoard.
High Energy Large Conference Room QUICKSTART Guide Track Lighting For Better Projection Viewing Dim-able track lighting is available so the overhead neon.
`SET-UP MANUAL SRM D248 PURPOSE:
The Handling Camera1 Trainer Training The Handling Camera.
Mercury bulb Camera Microscope on/off Stage up/down Focus wheel Objective controls Fluorescence filter controls Mono/RGB.
Computer Basics Dayton Metro Library Place photo here May 20, 2015.
1. Pump down the chamber from the atmosphere pressure 2. Using RHEED to obtain diffraction images 3. Open the RHEED chamber or venting from high vacuum.
Experimental Procedures Arrival at Desktop BASE Check that computer and DAQcard are still running. Sign in and start logbook entry (date and time). Note.
PHSAUTOMOTIVESALSPHSAUTOMOTIVESALS Charging System tests & Voltage information Checking the charging system with just a volt meter.
Computers on Wheels Teacher Overview. Be sure to pick up the laptop that has been assigned to you! Each slot in the laptop cabinet is numbered. Each laptop.
Wireless Netbook Lab Student Overview. Be sure to pick up the Netbook that has been assigned to you! Each slot in the Netbook cabinet is numbered. Each.
COBAE - Smart Classroom Technology Vic Catalasan For immediate in-class assistant please call X1500 or
AUDIO VISUAL TRAINING Center for Academic Success.
Computers 101 An Introduction to the Personal Computer.
Should be on Up to hear patient button presses Down to mute. In either case the #1 and #2 lights should light with each button press. Leave the 5 to the.
7.2.3 Student Book © 2005 Propane Education & Research CouncilPage Identifying Procedures for Measuring Resistance Between Two Given Points in.
IT Badge Support – Stage 1. Before switching on make sure an adult has checked your computer is plugged in safely and the electricity is switched on at.
MICROSOFT WORD GETTING STARTED WITH WORD. CONTENTS 1.STARTING THE PROGRAMSTARTING THE PROGRAM 2.BASIC TEXT EDITINGBASIC TEXT EDITING 3.SAVING A DOCUMENTSAVING.
New Log In Procedures for Students Using City Schools Computers.
PSU Outreach VLN Technical Training and Best Teaching Practices.
Step 2: Solve the 1st side/layer
Constant Hall A Mediated Classroom Guide. In Constant Hall classrooms, media and computer equipment is stored in a Media Desk. You will also find this.
Elementary Campuses. Mouse on mouse pad Chair pushed in neatly Keyboard straight Logged off Helping hand on left side Headphones neatly setting on right.
To Use This System To schedule a training or for classroom support, please call the Library Computing Helpdesk at WAYNE STATE UNIVERSITY -
Automotive Engines: Theory and Servicing, 7/e By James D. Halderman Copyright © 2011, 2009, 2005, 2001, 1997 Pearson Education, Inc., Upper Saddle River,
Windows Tutorial Common Objects ACOS: 1, 4. Using the Taskbar 1. Using the taskbar, you can switch between open programs and between open documents within.
Please read all the instructions carefully before the installation. Installation shall be carried out by experienced mechanic. Follow the steps in the.
New Log In Procedures for Students Using City Schools Computers.
LSM780 Live Cell Turn On/Turn Off Instructions Kim Peifley 07/13/15.
As you look at an iMac you will notice that there are no buttons on the front of the machine as shown in figure 1.
Design Studies 20 ‘Show Off’ Project How to make a computer monitor In Google Sketchup By: Liam Jack.
Using the “Clicker” If you have a clicker now, and did not do this last time, please enter your ID in your clicker. First, turn on your clicker by sliding.
Instructional E-Classroom Instructional Guide Seneca College, Audio-Visual Services.
When the program is first started a wizard will start to setup your Lemming App. Enter your company name and owner in the fields designated “Company Name”
PSU Outreach VLN Technical Training and Best Teaching Practices.
Designing a Next-Generation Surgical Robot Activity.
AUDIO VISUAL TRAINING Wilkins Theatre-Black Box. BLACK BOX EQUIPMENT IN CLASS Black Box LCD Projector/Built In Screen Laptop Connection (VGA Cord) Control.
AUDIO VISUAL TRAINING Bruce Hall-Smart Class. SMART CLASS EQUIPMENT Smart Class LCD Projector/Built In Screen Control Panel Credenza (DVD/VCR & P.C. inside)
How to Use a Laptop Computers. Unplug the laptop from the computer on wheels!
1 Top Level of CSC DCS UI 2nd PRIORITY ERRORS 3rd PRIORITY ERRORS LV Primary - MaratonsHV Primary 1 st PRIORITY ERRORS CSC_COOLING CSC_GAS CSC – Any Single.
COMPUTER LITERACY 1 TRANSITION PLUS BASIC COMPUTER USE PART 1.
Copy the following notes: Procedure: A specific way of doing something or step-by-step instructions Troubleshooting: the process of identifying and eliminating.
Digital Literacy Introduction to Computers Unit 1, Lesson 1.
OPERATING SYSTEM.
The care and use of the Room 241 video display and Skype Facility
Introduction to smartphone/tablet
HVI HIPOT TEST SET Pft sERIES.
Dayton Metro Library Computer Basics September 19, 2018
Hutchinson Hall-Black Box
Hennings Hall-Black Box
Star Early Literacy PreTest Instructions
Dayton Metro Library Place photo here Computer Basics December 8, 2018.
Using the Dean’s Boardroom
For this test you will be asked to remember the colors of words that are briefly presented on the computer screen. After several have been presented you.
2019 Investing Now Summer Program
Presentation transcript:

Neutron Detector Shutdown Procedure 1.Turn Off Photomultiplier Tube High Voltages There are two HV channels per red module, each with it’s own black dial for adjusting the high voltage output. Basically, to turn the HV off you need to turn each black dial as far counter-clockwise as it will go. If the dial is difficult to turn it is probably locked. To unlock, push up on the black lever on the side of the dial. You can monitor each channel’s high voltage setting with the voltmeter (shown on the left in the picture below). Simply plug the voltmeter’s short LEMO cable into the monitoring port underneath the black dial. A reading of 1.75 V on the meter, for example, translates into a high voltage of 1750 V (1V = 1kV). It’s a good idea to monitor each channel in this way as you turn it off. Once a channel’s HV is dialed all the way down, flip the switch just above the corresponding black dial to the off position. It’s very important to dial the HVs down to zero before flipping this HV on/off switch. After you’ve done this for all 4 channels you’re done. 1 Voltmeter with LEMO Cable Voltmeter with LEMO Cable HV Modules On/Off Switch Black Adjustment Dial Monitoring Port HV Modules On/Off Switch Black Adjustment Dial Monitoring Port

2.Turn Off The Electronics Crates There are two NIM electronics crates that should be switched off after the high voltage has been turned off. Make sure the high voltage is off before proceeding! (see step 1 above). Simply switch the two on/off switches to their off positions. 2 NIM Crate On/Off Switches NIM Crate On/Off Switches

3 3.Shutdown Data Acquisition Computers There are two Dell data acquisition computers that should be properly shutdown. This can be down either remotely or locally. For this set of instructions we’ll assume that it will be down locally in the mine. Before an electrical shutdown either Joel Sander or Ray Bunker will have made sure that data taking has been turned off, and will probably have already turned the computers off. These instructions are for the unlikely event that the computers have not been turned off. If you’re unsure or it looks like some programs are still running, please contact one of our cells: Ray Bunker  Joel Sander  Both computers are accessed with a single keyboard, monitor and mouse (as pictured to the right). They both run Windows XP… there’s nothing unusual about turning them on/off. You may need the username and password to gain access: Username  hep Password  hep|_|se|- the vertical lines (or pipes) are not letters. Typical location on a keyboard is just above the enter key, grouped with the backslash key. First log into (if necessary) whichever computer is currently hooked up to the keyboard and monitor. Use the menu bar at the bottom of the screen to shutdown the computer. Now switch to the other computer by double- tapping the scroll-lock key located near the top-right corner of the keyboard. This will switch keyboard, monitor and mouse control over to the other computer. Log into and shutdown the 2 nd computer. It should be fairly obvious from the computers’ front panel lights and the from the noise they make whether or not they have powered down. Also, turn off the UPS battery backup to prevent it from beeping during the power outage, and consequently wearing out its battery. The front of the module has two switches. The larger one on the right is the on/off switch. UPS Battery Backup Dell Data Acquisition Computers

4 4.Turn Off UPS Battery Backups There are two additional UPS battery backups that should be turned off so that they don’t beep during the power outage, and needlessly wear down their batteries. The other two modules are located between the two yellow electronics racks as shown in the picture below. Again, there are two switches on the front of each module. The on/off switch is the larger one on the right. These two UPS modules provide power glitch protection for the two NIM crates you shutdown in step 2. It’s very important that the high voltage be turned off (step 1) prior to turning off the NIM crates and their UPS modules! UPS Battery Backups

5 Neutron Detector Power On Procedure Turning things back on is basically a reversal of the above 4 shutdown steps: 1.Turn on all 3 UPS backup modules. 2.Turn on the 2 Dell data acquisition computers. Simply push the power switch on the front side of each computer. You don’t have to log in or start anything… we’ll do that remotely. 3.Switch on the two electronics crates. 4.Before turning on the high voltage make sure the 4 black dials are turned all the way counter- clockwise (the zero voltage/off position). Also, locate the sheet that indicates the neutron and muon high voltage settings for each channel. We will inform you ahead of time which set of voltages to use… normally it will be the neutron high voltages. Then, one channel at a time: 1.Plug the voltmeter into the HV monitoring port 2.Flip the HV on/off switch to the on position 3.Slowly turn the black dial clockwise until the voltmeter indicates the correct value. It can be difficult to get the exact value… try to get it as close as possible. 4.Lock the black dial by pushing the slider on its side down. This action can change the final voltage setting… so be careful. The dial can still be tweaked with a little more force when it’s in the locked position. This may be necessary to get the voltage close to the desired setting. And that’s all there is to it… Thank you!