1 July 19, 2005German Martinez – SX5 Meeting RBX Temperature Monitoring Proposal German Martinez.

Slides:



Advertisements
Similar presentations
JCOP FW Update ALICE DCS Workshop 6 th and 7 th October, 2005 Fernando Varela Rodriguez, IT-CO Outline Organization Current status Future work.
Advertisements

The Control System for the ATLAS Pixel Detector
March 16, 2004Alice controls workshop, S.Popescu Low Voltage and High Voltage OPC status and plans.
SPD DCS Status Report Ivan Amos Calì a,b, S.Ceresa a,c, C.Torcato de Matos a a CERN-AIT a CERN-AIT b Università degli studi di Bari b Università degli.
Power Supply System John Joseph LBNL Spectrometer Solenoid Test Plan Review Feb 17 th 2012.
PIXEL WEEK September 1999 S. Kersten University of Wuppertal 1 Status of Interlock Box New Interlock Box: NTC -I Box q relative changes in resistor values.
A3016 and MAO test at CAEN Pigi, A. Boaino & CAEN.
Supervision of Production Computers in ALICE Peter Chochula for the ALICE DCS team.
DCS aspects of TDAQ racks in USA15 and SDX1 Y. Ermoline et al. ATLAS Week, CERN, 15 February 2005.
Status of DCS for TDAQ racks Y. Ermoline et al. ATLAS TDAQ Week, CERN, 27 April 2005.
Energy Smart Room GROUP 9 PRESENTERS DEMO DATE SPECIAL THANKS TO ADVISOR PRESENTERS Thursday April 19, 2007 Department of Electrical and Systems Engineering.
Isabelle Laugier, AT/VAC/ICM Section February 7 th 2008.
DSS Advisory Board Christoph Schäfer Rack Safety System.
PP2 Status F. Bellina. Problem solved.. Problem with inhibit and reading temperature and many crazy behavior Solved with a new FPGA firmware: the hardware.
3 June 2003U. Frankenfeld1 TPC Detector Control System Status.
5 March DCS Final Design Review: RPC detector The DCS system of the Atlas RPC detector V.Bocci, G.Chiodi, E. Petrolo, R.Vari, S.Veneziano INFN Roma.
Towards a Detector Control System for the ATLAS Pixeldetector Susanne Kersten, University of Wuppertal Pixel2002, Carmel September 2002 Overview of the.
LKr Calorimeter Control and monitoring R. Fantechi 19/02/2010 R. Fantechi.
DCS T0 DCS Answers to DCS Commissioning and Installation related questions ALICE week T.Karavicheva and the T0 team T0 DCS Answers to.
S. Zelepoukine CMS Electronics Status Report: ECAL Detector Control System S. Zelepoukine IHEP Protvino/ETHZ
Royal Latin School. Describe, using diagrams or otherwise, the ring, bus and star network topologies Once you have decided to network a number of computers.
PLC Based sequential batch process CONTROL system
André Augustinus OPC news, versions to use on behalf of Sorina Popescu.
Giovanni Polese1 RPC Detector Control System for MTCC Pierluigi Paolucci, Anna Cimmino I.N.F.N. of Naples Giovanni Polese Lappeenranta University.
15-16/3/04 DCS workshop G. De Cataldo, A,.Franco and A. Tauro 1 Answers from the HMPID to the ACC questions 1.Concerning global DCS overview drawing 2.Concerning.
ECAL Prototype DCS system using PVSS Günther Dissertori (for Alison Lister) ETHZ
G. Dissertori ETHZ CMS Electronics ECAL DCS : Plans for 2003 G. Dissertori ETHZ
AMS HVCMOS status Raimon Casanova Mohr 14/05/2015.
Alice DCS workshop S.Popescu 1 1. News from TPC DCS cooling prototype Project overview: Aim of the prototype: investigating and developing standard.
André Augustinus 16 June 2003 DCS Workshop General Purpose Monitor.
André Augustinus 9 October 2006 Interlocks update.
Fifth CMS Electronics Week EASY: a new SY1527-based Embedded Assembly SYstem May 7th, 2003 CAEN SpA.
CONTENTS: 1.Abstract. 2.Objective. 3.Block diagram. 4.Methodology. 5.Advantages and Disadvantages. 6.Applications. 7.Conclusion.
CMS ECAL DCS 10.Oct S.Zelepoukine ICALEPCS CMS ECAL DCS 1 The Detector Control System for the Electromagnetic Calorimeter of the CMS Experiment.
What Is A Network A network is a group of computers interconnected with communication lines which allows users to share information and resources.
André Augustinus Infrastructure  Turbines  Radmon  Thermocouple readout  Netgear redundancy  Other cavern items  Cooling CRs  Other CR and surface.
GPS & GSM BASED CAR SECURITY SYSTEM. Student’s Name with USN No.
ALICE DCS Workshop 9 October 2006 ALICE DCS Workshop 9 October 2006 Michele NITTI.
9/12/2003Ivan Hruska1 First box prototype –Box design in July ‘03 –Box produced during August ’03 Tested last week in few fingers Small changes necessary.
AFP Trigger DAQ and DCS Krzysztof Korcyl Institute of Nuclear Physics - Cracow on behalf of TDAQ and DCS subsystems.
G. Dissertori ETHZ CMS Electronics ECAL DCS : Plans for 2003 G. Dissertori ETHZ
G. Dissertori ETHZ CMS Electronics ECAL DCS Software Planning G. Dissertori ETHZ
14 February 2007 G. Bohner, R. Bonnefoy, M. Crouau, P. Jacquet, C. Lacan, J. Lecoq, S. Monteil, P. Perret, G. Reinmuth, K. Suchorski LPC Clermont PS Very-Front-End.
T0 DCS Status DCS Workshop March 2006 T.Karavicheva on behalf of T0 team.
D. EliaALICE week / DCS workshop - Sept 20, SPD Power Supply System DCS status Domenico Elia INFN Bari.
10/09/10FV 1 News and observations from Brussels' meeting.
Tales and mysteries of PVSS in the land of ECAL Alison Lister ETHZ Alison Lister
D.Macina TS/LEATOTEM Meeting25/02/2004 Roman Pot test at the SPS Test of the Roman Pot prototype in the SPS proposed in December 2003 (CERN/LHCC ):
Status Report TOTEM Collaboration Meeting 17-NOVEMBER-2014
G. Dissertori ETHZ CMS Electronics ECAL Detector Control System : Status Report G. Dissertori ETHZ
CERN Summerschool 2007 Monitor and Control of the CANbus power supplies of ATLAS’ MDTs Wilco Koppert (UU)
Detector Safety System overview DSS is a PLC based system designed to protect ATLAS detector from damages. Front end (hardware) 2 redundant PLC ~700 input.
The Maraton LV system Michela Lenzi INFN Firenze Thanks to V. Bocci, P. Ciambrone, A. Sciubba LV Power Supply RCM AC/DC converter.
Development of T3Maps adapter boards
FPix DCS Subgroup Report
Institute of Nuclear Physics Polish Academy of Sciences
ATLAS MDT HV – LV Detector Control System (DCS)
PLC: Programmable Logical Controller
How SCADA Systems Work?.
WP02 PRR: Master Oscillator and RF Reference Distribution
Inside the computer.
Robert Gomez-Reino Garrido
Radiation- and Magnet field- Tolerant Power Supply System
RPC Detector Control System
TPC Detector Control System
RPC Detector Control System
Pierluigi Paolucci & Giovanni Polese
Pierluigi Paolucci & Giovanni Polese
The Ring Network Advantages: They are cheap to expand.
Pierluigi Paolucci & Giovanni Polese
Presentation transcript:

1 July 19, 2005German Martinez – SX5 Meeting RBX Temperature Monitoring Proposal German Martinez

2 July 19, 2005German Martinez – SX5 Meeting ProposalProposal Install one sensor (AD592,Pt100/1000 or NTC) in each HE sector, monitored with 1 or 2 ELMB per HE-/+ and implement a temporary trip system for each powering sector (would turn off only three wedges with the current powering scheme Advantages: Quality temperature measurement, good hardware protection, easy software integration as there is JCOP framework dedicated to ELMBs. Disadvantages: even when relatively simple, some real work has to be done and it is at least in part a temporary solution.

3 July 19, 2005German Martinez – SX5 Meeting SensorsSensors 1.AD590 Ads: Rad tolerant, Used in RM Cons: Relatively Expensive (~15 €) 2.AD592 Ads: Similar, but Cheaper thatAD590Ads (~6€) Cons: Not Rad tolerant certified 3.4-wire Pt100 Ads: ELMB & PVSS ready, Rad Hard, recommended by DSS, Cons: Needs 4 wires, Relatively Expensive 4.10K NTC Ads: ELMB & PVSS ready, Rad Hard, Cheap (~1 €)

4 July 19, 2005German Martinez – SX5 Meeting ELMBELMB Got Already One, but problems to get the PCI readout card, but probably we can borrow it from BU. Final version ready, we can buy up to 75 boards that Fernando allocated for CMS. Cheap: 85 CHF each

5 July 19, 2005German Martinez – SX5 Meeting Interlock Hardware Start to draw Circuit Diagram, but we may just use the “IBox” recalled by Fernando Already integrated to ELMB & PVSS, Rad tolerant Created by Wupperthal Uni for ATLAS Pixels LV system Possible to get some collaboration (Know personally the people involved)

6 July 19, 2005German Martinez – SX5 Meeting Power Switch Necessary for temporary power supplies Add as en extra card Takes signals from comparator signals Possible control by PVSS through ELMB

7 July 19, 2005German Martinez – SX5 Meeting DSS Integration Should be an add on card that process signals from comparators Possible PVSS control via ELMB signals Need to discuss requirements with DSS people Need to discuss alarm conditions within the collaboration

8 July 19, 2005German Martinez – SX5 Meeting Now the important issues Sadovar and Coffee: Old coffee machine back in operation, but results not as expected (Cafeteria quality, but does not meet our standards of Excellence  ) Logistics: Has somebody think of water supply and a sink?