Gate Automation 03 June 2015 2 VIS/VRS System Overview Equip the ingate and outgate lanes with camera ’ s The VIS system records container damage as.

Slides:



Advertisements
Similar presentations
COMPANY UPDATE 250 people Worldwide – 25 U.S. Based #1 worldwide for install base and annual new customers Proven technology with 15 years of expertise.
Advertisements

Collecting data Chapter 6. What is data? Data is raw facts and figures. In order to process data it has to be collected. The method of collecting data.
0 Communication Needs for a 21 st Century Railroad May 17, 2007 IEEE Communications Society CQR International Workshop 2007.
NexSentry Imaging Solutions
RFID Access Control System March, 2003 Softrónica.
Rest Rooms Concessions Rest Rooms Concessions CAUTION TAPE Block sidewalk for safety of bands and spectators. BACK GATE Band Entrance Coordinate and Check.
Ethan Bruning Senior Sales Engineer Mobile Capture Apps – Introduction to Mobile Capture App Design and Development.
The simple visitor management system. What it does.
Driver Hours of Service Logs & Vehicle Inspections Tools For Any Driver Safety and Compliance Fleet Management.
SeeCrane system August 2010 Version 2 1.Company Overview Hi-Tech Solutions 2.
Port Security ECT Delta Terminal Rotterdam, The Netherlands.
Automatic Parking Enforcer ENSC 440 Presentation and Demo December 13, 2010 Presented by: R.Maroufi, R.Johal, A.Moshgabadi, Y.Kuo, S.Rohani.
COPAS B.V. ICT specialists for the Container Handling Industry Company profile (October 2004) Home base: Rotterdam, The Netherlands We travel all over.
Lesson 4-Installing Network Operating Systems. Overview Installing and configuring Novell NetWare 6.0. Installing and configuring Windows 2000 Server.
AUTOMATIC DATA CAPTURE  a term to describe technologies which aim to immediately identify data with 100 percent accuracy.
Input devices, processing and output devices Hardware Senior I.
Background on USPS mail forwarding operations Overview of PARS
Input and Output Devices - Inputs
AS Module 2 Information; Management and Management and Manipulation or what to do with data, how to do it, and……... ensure it provides useful information.
1PORTMANN PROJECT OVERVIEWMarch 2013 Canada, Vancouver Port Mann bridge Freeflow tolling operation.
Input Devices Manual and Automatic By Laura and Gracie.
1.Overview 2. Hardware 3. Software Interface 4. Triggering 5. Installation 6. Configuring.
Welcome to Navis Configurable Gate Level 3 Training.
DATA COLLECTION METHODS CONTENT PAGE How data is collected via questionnaires. How data is collected via questionnaires. How data is collected with mark.
Faculty of Computer & Information Software Engineering Third year
Data Capture Understand the concept of data encoding. Describe methods of data capture and identify appropriate contexts for their.
Warehouse Procedure. Receiving Cargo EASTRONGWarehouse Notice SuppliersSend cargo to warehouse.
Forms Training. Tested Formatted The Template Library.
©La-Nette Mark Did you know computers are everywhere you look, and even in places you can't see. Computers check out your groceries, pump your gas,
IPD Technical Conference February 19 th 2008 Application: Pipette Measurement and Flash Inspection. Distributor: CPU Automation Engineer: Mike Bray.
Presentation by: Jay Krasner Automation in patient registration.
Intermediate Documents (IDOCs) What is an IDoc What is an IDoc An IDoc is simply a data container that is used to exchange information between any two.
Chapter 2 HAEDWAER.
Input Devices. Input devices allow us to enter data into the computer system –Mouse –Keyboard –Graphics Tablet –TrackPad –Touch-sensitive screen - Scanner.
Name Enrolment no.: Dhruti Desai Khushboo Desai Sneha Gangwani Rajul Shah
DEQ Oregon – SysTechFACA Workgroup – Oregon FACA Workgroup Meeting SysTech International Innovative Technologies for Future OBD Based I/M Program Design.
License Plate Recognition of A Vehicle using MATLAB
AUTOMATIC NUMBER PLATE RECOGNITION SYSTEM
Standard Input Devices
THE MALAYSIAN ELECTRONIC PASSPORT
Constraints Space Load Capacity Costs Operating hours.
HighPROTEC-2 MRM4-2 Motor Protection Relay Sales presentation
Chp 4: Input and Output Devices
Input and Output Devices
Standard Methods of Input.
ABOUT SABRA – Vehicle Registration Automatic System
PARKING AUTOMATION SYSTEM
FCC lifts Layout, characteristics etc.
Under Vehicle Surveillance System
Printers.
OCR GCSE ICT Data capture methods.
Databases.
Factors that Influence the Geometric Detection Pattern of Vehicle-based Licence Plate Recognition Systems Martin Rademeyer Thinus Booysen, Arno Barnard.
Wavestore Integrates…
Windows Tablet App Gate Overview
PDA Application User Guide
Databases.
Wavestore Integrates…
HighPROTEC-2 MRDT4-2 Transformer Protection with differential Sales presentation 2015/08/10.
Introduction to Computers
Presentation On MODERNIZATION AND COMPUTERIZATION OF 22 BORDER CHECK POSTS IN THE STATE OF MAHARASHTRA.
Wavestore Integrates…
Chapter 3 Hardware and software 1.
Product Training Module
ACTi ALPR - Automatic License Plate Recognition
Chapter 3 Hardware and software 1.
Presented by: Jeff Moore – Artsyl Technologies, Inc.
Introduction to Computers
The Millo-Check TM Drivers’ logbook auditing software for HOS compliance with or without scanner. by.
Bio Bachelor’s degree in Marine Transportation from United States Merchant Marine Academy USNR veteran, with 8 years in the Merchant Marine Reserve MBA.
Presentation transcript:

Gate Automation

03 June VIS/VRS System Overview Equip the ingate and outgate lanes with camera ’ s The VIS system records container damage as video images The VRS system automates the process of: License plate identification Prefix/Container number identification ISO Size/Type identification

03 June VIS/VRS Inspection Room An inspection room is used in conjunction with VIS/VRS, this room is manned by the container terminal who will, in case of problems, correct the wrong data.

03 June VIS/VRS Vitronic tests stopped - results very poor Cosmos is the software and also the hardware supplier for the HT First tests, December 15, 1999 End of tests, October 2000

03 June VIS/VRS End result 99% recognition

03 June VIS/VRS V Visual G Gate = S System V Visual I Inspection S System + V Visual R Recognition S System

03 June VGS Functional aims: Visual inspection Container and truck recognition Container number ISO code License plate number Determination of truck structure

03 June VGS: Gate Entry Gate closed No entry

03 June Gate open Please enter VGS: Gate Entry

03 June Trigger 1: License plate + OCR VGS: Gate Passing

03 June Trigger 1: License plate + OCR Create truck call VGS: Gate Passing

03 June GUI: Creation Truck Call

03 June Trigger 1: License plate + OCR Create truck call Front view + OCR VGS: Gate Passing

03 June Trigger 2: Side views + OCR VGS: Gate Passing

03 June Trigger 2: Side views + OCR Top view + OCR VGS: Gate Passing

03 June VGS: Gate Passing Trigger 3: After view + OCR

03 June VGS: Post Processing

03 June Trigger 4: Post Processing Green light for next truck VGS: Gate Passing

03 June VGS: Infrastructure

03 June VGS Hardware

03 June Camera Flexibility New technology Line scan camera 7000 lines x 2048 pixels Container length 45 ’  mm + 20 %  minimum 9 pixels / cm ² Used for left, right and top camera

03 June Camera flexibility cm

03 June Software Concept New technology JAVA on the server (hardware independent) MFC C++ on the client (ms Windows NT) Component based development (reuse of code) Hardware configuration in tables

03 June VGS: Gate Scenario Step 1 : Gate Entry Step 2 : Gate Passing Detection of the truck Taking pictures Optical Character Recognition (OCR) Step 3 : Post processing

03 June VIS/VRS Quay cranes Rail cranes Barge cranes

03 June RAIL REQUIREMENTS Max. speed 30 KM Both directions Outdoor conditions Cargo other than containers such as swap bodies and trailers must be detected Optional to recognise swap bodies/trailers The information of containers on the train must be read

03 June RAIL Maximum length train, 120 teu Maximum length of railcar, 4 teu 5 teu railcars are under development? Position of the installation differs per terminal RMG or RTG, bi-directional

03 June QUAYCRANES REQUIREMENTS The system must operate under open outdoor conditions The system must be installed on a quay crane Discharge, information in TCS in 5 seconds after the container is released by the crane Loading is still under discussion

03 June GENERAL REQUIREMENTS Availability 99,9 % Data captured > 98% The system must be able to handle all ISO standard types of containers The system should handle twinlifts and extended twinlifts

03 June VRS RAIL REQUIREMENTS Container prefix and number ISO size/type IMO container identification Direction of doors Railcarnumber Position of containers Sequence of railcars Inspection plate y/n

03 June QUAY CRANE REQUIREMENTS Container prefix number ISO size/type IMO container Identification Directions of doors

03 June VIS REQUIREMENTS Rail, pictures of all visible side of the container must be made and stored, including the top, but exclude the bottom Same requirements are valid for the pictures of the railcar Quay Crane, pictures off all visible sides of the container, including the top and bottom In case of twinlifts, all visible sides of the two containers, for each container 1 set of pictures

03 June Process-flow Autogate-In Gate in Reading Cargocard Parking Reception Area Data Input Truck-driver: License Plate

03 June Autogate In Damage Y/N CSC Y/N Top/Bottom Rail Y/N Local container

03 June Autogate In Input reception-employee Sealnumber IMO More than 1 container Data to Autogate Containerinfo on Cargocard Driver to Customs Printing of Route-information

03 June Autogate In Reading Cargo-card System recognition License-plate container size/type IMO VIS

03 June Autogate In Check VGS / Cargocard / IMO If damage yes: Manual Inspection Handscan Printing of Condition Tag

03 June Autogate In Internet, pictures per container available

03 June Autogate Out Autogate License-plate Containernumber Size/Type

03 June Autogate OUT Reading of Cargocard Handscan VGS Check result on Cargocard

03 June Autogate Out Action Truck-driver: Sealnumber Damage Y/N If yes, manual inspection Printer Condition Tag Customs Gate Out

03 June Autogate Out Internet, pictures of the container available

03 June COST/ BENEFIT IRR = 25%