Helsinki Sept 2007 S.Galés ERA-NET Supporting Cooperation for research infrastructures in all S&T fields 7 th FP Call Capacity Work Program: Infrastructures.

Slides:



Advertisements
Similar presentations
Goal 1: acquire a mutual and better understanding of the Funding systems of nuclear physics infrastructures and associated equipments in Europe that is.
Advertisements

ERA-NET Cooperation and coordination of national research and innovation activities Last call 2005 Deadline September-October.
1 Supporting the cooperation and coordination of research activities carried out at national or regional level The “ERA-NET” Scheme
Funding Schemes. Legal and Financial Rules in the 7th Framework Programme PHOENIX Training Laulasmaa, 1 Sept 2007.
IRINA KUKLINA, RICHARD BURGER BRUSSELS, 25 NOVEMBER 2014 CO-FUNDING MECHANISMS OF RUSSIAN-EUROPEAN S&T COOPERATION.
Opportunities for EU-India Research Through the EU’s 7 th Research Framework Programme Indraneel Ghose Science and Technology Section European Commission.
Identification of critical success factors for implementing NLLS, through collaboration and exchange of expertise IDENTIFY LLP-2008-RO-KA1-KA1NLLS.
The New EU Framework Programme for Research and Innovation HORIZON 2020 Judit Fejes Executive Agency of Small and Medium Enterprises (EASME)
1 7th Framework Programme Specific Programme “Ideas” European Commission Directorate B November 2005.
“ERA-NET” 24 April Cooperation and coordination of national or regional research and innovation activities (i.e. programmes) FP6 Launch Conference.
Networking with Southeast Europe SEE-ERA.NET Pilot Joint Call for Research Proposals Southeast European Era-Net.
The SEE-ERA.NET project - a brief overview on the interim project results.
APRE Agency for the Promotion of European Research Lifecycle of an FP 7 project Caterina Buonocore Riga, 13th September, 2007.
WP1 presentation Christian Jagersma Bucharest, 1-4 March 2010 Agentschap NL (NL Agency)
 Towards transnational funding of Nuclear Physics Research Infrastructures GANIL-SPIRAL2 AGATA ISOLDE-ALTO JYVL-LNL-LNS- GANIL-SPIRAL1-GSI Eastern-Network.
The Preparatory Phase Proposal a first draft to be discussed.
The next call FP Infrastructures-5. FP Infrastructures-5 Call outline (1) All fields of S&T are covered Publication date: 4 November 2004.
RTD-B.4 - Regions of Knowledge and Research Potential Regional Dimension of the 7th Framework Programme Regions of Knowledge Objectives and Activities.
BONUS FOR THE BALTIC SEA SCIENCE - NETWORK OF FUNDING AGENCIES On behalf of BONUS consortium: Andris Andrushaitis BONUS ERA-NET National Assistant Coordinator.
Dr. Margaretha Mazura (EMF) ICT Day Opportunities to participate in EU ICT research projects San José, 16 February 2010 Principles of EU Research Funding.
1 THE CITY OF TOMORROW AND CULTURAL HERITAGE Thierry PROST EUROPEAN COMMISSION - DG RTD Directorate I - Preserving the Ecosystem Tel: +32/2/ Fax:
Regions of Knowledge WP and calls for proposals 2008 Warszawa, European Commission DG RTD/B4 Anna Rémond.
Sophie Sergent Ifremer European Affairs Department / MariFish WP7 ERANET MariFish COORDINATION OF EUROPEAN MARINE FISHERIES RESEARCH Presentation of MariFish.
1 NOT LEGALLY BINDING Energy Info day FP7-ENERGY-2008-RUSSIA 13th December 2007 International Co-operation FP7 Energy Theme Energy EU-Russia Call European.
Dr. Marion Tobler, NCP Environment Evaluation Criteria and Procedure.
ESTELA Summer Workshop, 26 June 2013 The EU-SOLARIS project.
AIDA negotiation process AIDA NCP Meeting,
Astroparticle Physics for Europe ASPERA – 2 Workpackage 5 1. Workpackage 5 - European-wide common calls and other common actions Deborah Miller, STFC.
Participation in 7FP Anna Pikalova National Research University “Higher School of Economics” National Contact Points “Mobility” & “INCO”
RTD-B.4 - Regions of Knowledge and Research Potential Regional Dimension of the 7th Framework Programme « RESEARCH POTENTIAL » « CAPACITIES » SPECIFIC.
1 ASTRONET Coordinating strategic planning for European Astronomy.
ERA-NET Supporting Cooperation for research infrastructures in all S&T fields 7 th FP Call Capacity Work Program: Infrastructures Deadline May 2 nd 2007.
The Seventh Framework Programme for Research and Technological Development (FP7) supporting innovation Epp Tohver-Bulavs 07. November 2007, Tallinn.
Status of QUACO project
Information session first joint ERANID call (Task 5 DOW) Belgian Science Policy Office 30 September 2015.
S 1 Annual Meeting 2013 Management and reporting (WP6) Chiara Bearzotti NACLIM project manager.
1 7 th Research Framework Programme Rules for the Participation.
JASPERS for CEF Stéphane OUAKI Head Of Unit
Danube Transnational Programme – opportunities for cooperation Bucharest
European Commission Research 1 Participation in the EU 6th Framework Programme for Research and Technological Development Peter Härtwich, DG Research,
Negotiation of Proposals Dr. Evangelos Ouzounis Directorate C DG Information Society European Commission.
 the creation of an "internal market" in research (free movement of knowledge, researchers and technology)  the restructuring of the European research.
9th Meeting of the Steering Committee 1 / 26 Lisbon, 10 November 2009 Climate Impact Research (and Response) Coordination for a Larger Europe CIRCLE (2)
The 7th Framework Programme for Research: Strategy of international cooperation activities Robert Burmanjer Head of Unit, “International Scientific Cooperation.
ERANETMED is funded by the European Commission’s 7th Framework Programme EURO – MEDITERRANEAN COOPERATION THROUGH ERANET JOINT ACTIVITIES AND BEYOND ERANETMED.
Richard Escritt, Director – Coordination of Community Actions DG Research, European Commission “The development of the ERA: Experiences from FP6 and reflections.
SC meeting R. Aleksan February 11 th TIARA 1.General Information 2.Final Budget 3.Meeting Objectives 4.Organizational matters 5.Kickoff meeting 6.Conclusion.
ERA-Instruments Thomas Gübitz, Johannes Janssen, Christian Renner, Bonn, 4 Februar 2008 Infrastructure Funding in the Life Sciences.
Comparative analysis of the National Rural Networks (NRNs) in the EU Member States Martin Law Contact Point of the European Network for Rural Development.
WP leaders meeting R. Aleksan October 5 th, 2009 TIARA 1.Objectives 2.General Context 3.Building TIARA 4.Conclusion.
WP leaders meeting R. Aleksan October 5 th, 2009 TIARA 1.Objectives 2.WP management 3.General rules 4.Conclusion Work Packages.
André Hoddevik, Project Director Enlargement of the PEPPOL-consortium 2009.
Mindfuel at the heart of transport research Era-net inTransport How theCzech organisations may participate Mindfuel at the heart of transport research.
In line with ERA-NET scheme the project aims at developing and strengthening the cooperation and coordination of national and or/regional programs for.
Geothermal ERA NET Coordination Office Orkustofnun, Iceland Cooperation between European countries through the Geothermal ERA NET slides from Guðni A Jóhannesson.
AMICI WP1 – Management, coordination and dissemination
WP3 - Evaluation and proposal selection
Strengthening the foundations of ERA
EU-Russia Cooperation in the Areas of Science, Research and Innovation
Background CRiteria for the IDentification of Groundwater thrEsholds BRIDGE Project Presentation Contract N° (SSPI) Co-ordinator: BRGM (Fr)
The ERA.Net instrument Aims and benefits
CRUE – The Way Forward Vicki Jackson
AMICI WP1 – Management, coordination and dissemination
SOCIAL DIALOGUE WITHIN EUPAN
Post-2020 discussions 1. State of play of discussions 2. On-going work 3. Questions for debate.
Technical Working Group meeting 21 March 2012 Brussels
WP2. ARIMNet2 2nd call ARIMNet2 Governing Board Meeting
ASTRONET Coordinating strategic planning for European Astronomy
SOCIAL DIALOGUE WITHIN THE SCOPE OF EUPAN
Experience of the implementation of FP6; preparations towards FP7
Presentation transcript:

Helsinki Sept 2007 S.Galés ERA-NET Supporting Cooperation for research infrastructures in all S&T fields 7 th FP Call Capacity Work Program: Infrastructures Deadline May 2 nd 2007

In line with ERA-NET scheme the project should aim at developing and strengthening the cooperation and coordination of national and or/regional programs for research infrastructures In line with ERA-NET scheme the project should aim at developing and strengthening the cooperation and coordination of national and or/regional programs for research infrastructures Eligible partners are only program owners Eligible partners are only program owners (National/regional ministries/governments or Research councils and funding agencies (National/regional ministries/governments or Research councils and funding agencies managing research programs) managing research programs) Objectives of ERA-NET

Motivations for a Nuclear Physics ERANET- NUPNET In our field the challenge is to merge the national programs to create a stronger and more cohesive research activity which is truly European in scope Two conditions are required 1- Independent scientific assessment of the field: emerging areas,key developments, needed instruments, recommendations and scientific priorities. This is done by NuPECC and respected emerging areas,key developments, needed instruments, recommendations and scientific priorities. This is done by NuPECC and respected 2- Current funding procedures (separate funding agencies reflect separate priorities) has to be given a strategic direction to help to align some decisions on commonly agreed European research goals. This ERA-NET NUPNET proposal aims to meet this challenge

NUPNET Proposal A stepwise approach 2008 Information exchange and Census of resources for Nuclear Physics Funding Bodies Agreement on an Action Plan for Infrastructures (Resource and financial Action plan of Agencies) Implementation of pilot projects of the Action plan About 20 participants Funding agencies and ministries From 14 EU countries

NuPNET Work packages overview WP1: Management, coordination and communication ( Fr -IN2P3) WP1: Management, coordination and communication ( Fr -IN2P3) Task 1.1: Overall Management of NuPNET (IN2P3) Task 1.2: Overall Co-ordination of the Consortium (IN2P3) Task 1.3: Communication and electronic tools (Romania) WP2: Systematic exchange and networking ( Germany, PT-GSI) WP2: Systematic exchange and networking ( Germany, PT-GSI) Task 2.1: Systematic exchange of information on funding modalities and administrative procedures (Gr/D) Task 2.2: Census of present European Nuclear physics resources (D/Gr/Ro) Task 2.3: Links with I3, DS and other bodies in nuclear physics (D) Task 2.4: Integration of new associates (Nl) WP3: Funding action plan (Italy, INFN) WP3: Funding action plan (Italy, INFN) Task 3.1: Analysis of current funding of European nuclear research projects and identification of opportunities for NuPNET (I) Task 3.2: Identification and tackling barriers: Investigation of formal and legal barriers for a future European cooperation (Pol) Task 3.3: Funding Action Plan: Establish common evaluation procedures and standards for common transnational projects within a roadmap for funding infrastructures of nuclear physics (CEA) WP4 Implementation of trans-national joint activities ( Spain, FECYT) WP4 Implementation of trans-national joint activities ( Spain, FECYT) Task 4.1: Use of existing agreements (Bu) Task 4.2: Mechanisms for joint activities at a trans-national level (E/UK?) Task 4.3: Test implementation of a coordinated trans-national pilot activity (E)

Structure of the Project NuPECC as advisory Body Governing Council Coordination Committee WP2 De WP3 Italy WP Spain Co-ordinator WP1 FR Scientific Advisory Body NuPECC European Commission

Helsinki Sept 2007 S.Galés GOALS of NuPNET Mapping the science priorities (NuPECC) into a funding action plan Establish procedures and funding for trans-national common activities (variable geometry) Identification of joint activities to be implemented in the framework of NuPNET, Launching of a pilot joint activity Establish a sustainable action beyond this project

Contribution Requested to the EU Proposed budget of 1.7 Million Euros for 3 years Proposed budget of 1.7 Million Euros for 3 years 260 person. months: 72% of the budget for personal costs, 260 person. months: 72% of the budget for personal costs, 22% for travel costs (360 travel units for the whole project; from 13 up to 32 per agency). A maximum of 6 General Meetings (and 5 national days) 22% for travel costs (360 travel units for the whole project; from 13 up to 32 per agency). A maximum of 6 General Meetings (and 5 national days) 7% overheads 7% overheads Submitted May 2007 Submitted May 2007

Results of the evaluation and start of the negotiations with the EC Commission Results of the evaluation and start of the negotiations with the EC Commission Improvement of the description of work and related new budget (1.3 M€,23% reduction ) Improvement of the description of work and related new budget (1.3 M€,23% reduction ) Next steps Next steps NuPNET Proposal Selected - July 2007 Focus on main goal : Funding Action Plan and launch of pilot action Focus on main goal : Funding Action Plan and launch of pilot action Simplify WP2 and WP3, avoid duplication. Less open days and general meetings  Budget cut Simplify WP2 and WP3, avoid duplication. Less open days and general meetings  Budget cut Result of the evaluation 13,5/15

Lots of rephrasing has been made in the new version of the text Lots of rephrasing has been made in the new version of the text Milestones and deliverables should be clearer and less numerous Milestones and deliverables should be clearer and less numerous Budget: reduction to 1.3 M€ Budget: reduction to 1.3 M€ Reduction of the lump sums reimbursed (1 person month = 4.5 K€; travel unit =1 K€; Workshop = 3k€) Reduction of the lump sums reimbursed (1 person month = 4.5 K€; travel unit =1 K€; Workshop = 3k€) Cut in « Open days » (2.1), communication (T1.3) and Task leader Person Month Cut in « Open days » (2.1), communication (T1.3) and Task leader Person Month Less travel units Less travel units  But ERANET goals are the real issue  But ERANET goals are the real issue Improvement of the description of work and related new budget

EC Contribution per WP 36 Months WP1WP2WP3WP4Total Partner 1 CNRSF , , , , ,00 16% 65% Partner 2 PTGSID , , , ,00 15% Partner 3 BMBF*D 3 000, , ,00 1% Partner 4 INFNIt , , , , ,00 15% Partner 5 FECYTEs , , , , ,00 14% Partner 6 MECEs 3 000, , , ,00 4% Partner 7 FNRSBe 3 000, , , ,00 1% Partner 8 FWO V Be 3 000, , , ,00 1% Partner 9 Bg 3 000, , , , ,00 4% Partner 10 CEAF 3 000, , , , ,00 4% Partner 11 Cz 3 000, , , ,00 1% Partner 12 HIPFi 3 000, , , ,00 1% Partner 13 Gr 3 000, , , ,00 4% Partner 14 Hg 3 000, , , , ,00 4% Partner 15 Nl 3 000, , , ,00 4% Partner 16 Pl 3 000, , , , ,00 4% Partner 17 Ro , , , ,00 8% Partner 18 Uk 3 000, , , ,00 1% , , , , ,00 100%107% * BMBF budget should be added to PT-GSI 30%27%19%25%100% ,

EC Timing: EC Timing: Sept. 18th: Description of Work (DoW) and GPF (electronic form) to Brussels (Done Yesterday!!) Sept. 18th: Description of Work (DoW) and GPF (electronic form) to Brussels (Done Yesterday!!) Sept. 28th: finalized Description of Work and GPFs signed by each partner Sept. 28th: finalized Description of Work and GPFs signed by each partner October: finalization of legal matters; October: finalization of legal matters; November – December: grant agreement sent to CNRS and signature of the contract before next year (2008). November – December: grant agreement sent to CNRS and signature of the contract before next year (2008). Next steps Thanks to all contributors and to J.Benlliure(FECYT), A.Bracco(INFN), C.Bosaro(IN2P3), I. Reinhard (GSI),