V. Carassiti - Princeton (USA) 9-13/01/2003 1 BABAR IFR UPGRADE DETECTOR ASSEMBLING AND MOUNTING.

Slides:



Advertisements
Similar presentations
Module Assembly Update Ohio State University and Princeton University are presently preparing facilities for module assembly. Both universities are fabricating.
Advertisements

INAR 243 FLOORS.  Structural element  Proper ground for functions.
Click on this image to open the full PDF document.
1 Short update Itzhak Tserruya HBD meeting BNL, April 11, 2006.
Both the dome and slab design use a 5 gallon bucket in the middle to be used as a squat hole FINAL MOLD DESIGN.
1 Sep. 19, 2006Changguo Lu, Princeton University Induced signal in RPC, Configuration of the double gap RPC and Grouping of the strips Changguo Lu Princeton.
Pneumatic Arm Assembly Instructions. Contents of Pneumatic Arm Kit Wooden pieces (⅜” cross-section): 1 X 24”; 1 X 21⅛”; 8 X 7½”; 4 X 7⅛”; 4 X 7”; 2 X.
AMS-02 tracker mechanics status of assembly and integration at UniGe Outer planes: - Tests of evaporator (cooling loop) integration - Tools to develop.
Mechanical Status of ECAL Marc Anduze – 30/10/06.
October 22, 2003H.J. Krebs1 LST Mechanical Design Review 2005 IR-2 Installation Discussion H.J. Krebs October 22, 2003.
October 22, 2003H.J. Krebs1 LST Mechanical Design Review 2004 IR-2 Installation Schedule H.J. Krebs October 22, 2003.
Stave core assembly Stephanie Yang WP4 face to face meeting, Lancaster University 20 Feb 2014.
Parts list 1 – 8’ 2” OD stainless steel pipe, chamfered at both ends 1 –7’ 4” PVC pipe 2 – 4” PVC end caps, with appropriate holes 1 – heater (model#=Omegalux.
VELO upgrade electronics – HYBRIDS Tony Smith University of Liverpool.
SQXF Shell & Yoke Assembly Procedure
Bridging the Gap: Building Bridges 101, It Is Time to Get To Work
Update on LST-based IFR barrel upgrade Roberto Calabrese Ferrara University Workshop on IFR replacement, SLAC, 12/8/2002.
PRST5450-eTraining presents… Book Repair Issues: “Tipping-In”
Mickael Frotin– 07/06/2009 Demonstrator - Assembly ECAL meeting - London.
1 Module and stave interconnect Rev. sept. 29/08.
Step-by-step assembly instructions
1 Discussion for basic options — engineering video conference July 12, 2006 Outline Water pool — advantages — issues, problems, engineering options Aquarium.
Parts list 1 – 8’ 2” OD stainless steel pipe, chamfered at both ends 1 –7’ 4” PVC pipe 2 – 4” PVC end caps, with appropriate holes 1 – heater (model#=Omegalux.
M. Alfonsi LNF/INFN Cagliari 5 May 2006 M1R1 mechanical requirements  Space constraint Frame and pannel Pads readout and trigger sectors Gas inlet and.
Marc Anduze – 09/09/2008 Report on EUDET Mechanics - Global Design and composite structures: Marc Anduze - Integration Slab and thermal measurements: Aboud.
1 Fulvio TESSAROTTO the new RICH beam pipe the new RICH beam pipe - pipe production, gluing and tests - measurement and removal of the old pipe - fixation.
Mechanical Status of EUDET Module Marc Anduze – 05/04/07.
Silicon /pcb assembly R Thompson, J Freestone LAL 3 June 08.
CLAS12-RICH Mechanical Design Status-Report CLAS12 RICH Review September 5-6 th 2013 S. Tomassini, D. Orecchini1 D. Orecchini, S. Tomassini.
Baby MIND coil modules assembly the aluminium folded strip solution 1 Alexey, Philippe, Gabriella, Helder, Herman Baby Mind Magnet CERN June.
Layout for Fixel Readout Board fiber Holder The FRBH module will provide structure to the fiber assembly in the Fixel Readout system. header Pots, two.
Visit to Heidelberg Loek Ceelie Henk Schuijlenburg.
Stave C channel side closeout gluing jig S Yang WP4 monthly meeting at Liverpool University 26 th March 2014.
Side view of generator. Close up of unused grounding pad - gives provisions for mounting the absorber.
How to Change Raptor Knife Blades. Step 1: Use a Phillips screwdriver to remove the 5 screws. It is not necessary to remove the lanyard/webbing to change.
Progress on the Prototype design Catania Goikoetxea, Mikel Navarro Medrano, Javier Mainz, March 31st,
Marc Anduze – CALICE Meeting – KOBE 10/05/07 Mechanical R&D for Technological EUDET ECAL Prototype.
SiD Hcal structure & 1m² Micromegas chamber prototype CALICE 2009 – LYON – 2009, septembre 17 th.
MQXFB design, assembly plans & tooling at CERN J.C Perez On behalf of MQXF collaboration team MQXF Workshop on Structure, Alignment and Electrical QA.
2010/12/14 Caltech Massimo Benettoni FDIRC FBox (almost) ready for production Box design finalized (as possible) Gives precise Fblock positioning wrt guiding.
News on Mechanical Design Dirk Wiedner July /4/20121Dirk Wiedner Mu3e meeting Zurich.
Origami and Cooling 24th September 2012 C. Irmler (HEPHY Vienna) Joint PXD and SVD Meeting Göttingen.
The first step is to measure the depth of your box.
The problem is to design, construct and test the most efficient bridge within the specifications. Back to start of slide show.
SuperB Integration SuperB Experimental hall. Related topics of Slac D&D activities.
SuperB – IFR status of the detector & tooling development 1V. Carassiti - INFN FEINP PAN 07-09/09/2012.
BM&N STS ladders assembly in VLHEP
Board Replacement for Engineered Glue-Down Pattern Plus with a Premier Performance replacement board.
Micro Vertex Detector of PANDA Status of Strip BARREL and DISC
Ferrara MECHANICAL SUPPORT for forward tracking detectors Federico Evangelisti INFN - Ferrara GSI – 2-6 march 2009.
Update on Pavia MM mechanical prototype
Ladder Assembly All tools and jigs produced Glue dispensing works
MECHANICS OF THE FORWARD STRAW TUBE TRACKER (preliminary) Federico Evangelisti INFN - Ferrara GSI - 7/11 dicember 2009.
NA62 LAV Anti1 REMOVAL & TESTS
Sensor Layout Options Aim is to understand the implication and constrains of possible sensor design/layout on the general ID Layout. Keep both ATLAS “drum”
How to Create your Sea Floor Spreading Model
Step-by-step assembly instructions
IFR detector mechanics
Step-by-step assembly instructions
Step-by-step assembly instructions
Hydraulic Arm Assembly Instructions
LST Module Installation
Limited Streamer Tubes
Board Replacement for Engineered Glue-Down Hardwood Floors
Gattini Detector Installation
Limited Streamer Tube Project Summary
Bunker Wall Design Wall ESS
After service guide for changing PCB
BaBar LST Upgrade Richard F Boyce
Status of QQXF cryostat
Presentation transcript:

V. Carassiti - Princeton (USA) 9-13/01/ BABAR IFR UPGRADE DETECTOR ASSEMBLING AND MOUNTING

V. Carassiti - Princeton (USA) 9-13/01/ DETECTOR LAYOUT EXPLODED

V. Carassiti - Princeton (USA) 9-13/01/ DETECTOR LAYOUT ASSEMBLED

V. Carassiti - Princeton (USA) 9-13/01/ IAROCCI TUBE TUBE MATERIAL : NORYL OR PVC THE TUBE IS NOT SELF SUPPORTING

V. Carassiti - Princeton (USA) 9-13/01/ RIB RIB MATERIAL : STEEL NUMBER OF RIBS : TO BE OPTIMIZED DEPENDING ON DETECTOR’S EFFICIENCY AND STIFFNESS REQUIRED ASSUMING A RIB OF 1 MM THICK FOR EACH TUBE, THE TOTAL LENGTH NEEDED IS ABOUT 8000 m; THE CORRESPONDING WEIGHT IS 1260 Kg AND THE COST = 3.6*1260 = 4536 € (20% VAT INCLUDED)

V. Carassiti - Princeton (USA) 9-13/01/ DETECTOR’S STIFFNESS THE HELP OF THE RIBS

V. Carassiti - Princeton (USA) 9-13/01/ GLUEING – PHASE 1 THE RIB IS GLUED ON THE TUBE’S SIDE

V. Carassiti - Princeton (USA) 9-13/01/ GLUEING – PHASE 2 THE DETECTOR’S MODULE IS ASSEMBLED

V. Carassiti - Princeton (USA) 9-13/01/ GLUEING – PHASE 3 STRIPS, GROUND, SIGNAL PCB AND INSULATOR FOILS ARE ASSEMBLED THE TOTAL THICKNESS IS ABOUT 1 MM

V. Carassiti - Princeton (USA) 9-13/01/ GLUEING – PHASE 4 STRIPS, GROUND, SIGNAL PCB AND INSULATOR FOILS ARE GLUED ON THE TUBES

V. Carassiti - Princeton (USA) 9-13/01/ DETECTOR’S VERTICAL STIFFNESS

V. Carassiti - Princeton (USA) 9-13/01/ MOUNTING AND DISMOUNTING THE DETECTOR  THE STRIPS FOIL GOES IN TO THE GAP (SLIDE 13); A PROPER TOOLING KEEPS IT IN SHAPE AND PLACE  THE MODULES OF THE DETECTOR ARE INSERTED ONE BY ONE FROM THE BOTTOM TO THE TOP, THE NEXT SLIDING ON THE PREVIOUS ONE (SLIDES 14, 15)  EACH MODULE CAN BE HELD ON BOTH EDGES, WHICH ALLOWS THE LIFTING AND THE ADJUSTMENT.  WHEN THE CORNER PIECES ARE MOUNTED THE DETECTOR DISASSEMBLY IS STILL POSSIBLE AFTER THE CENTER PIECES REMOVAL (SLIDE 16); THE PROCEDURE IS THE FOLLOWING: 1) LIFTING THE UPPER MODULES 2) EXTRACT THE CENTRAL MODULES 3) IN THE MIDDLE OF THE GAP THERE’S THE SPACE TO LOWER OR LIFT THE OTHER MODULES.AND REMOVE THEM.  THE OPERATION OF ASSEMBLY AND DISASSEMBLY NEED A TOOLING, HOLDING AND HANDLING THE MODULES OF THE DETECTOR.

V. Carassiti - Princeton (USA) 9-13/01/ INSERTING THE STRIP FOIL THE STRIP FOIL SLIDES INTO THE GAP A TOOLING HOLDING AND MOVING THE FOIL IS NEEDED

V. Carassiti - Princeton (USA) 9-13/01/ INSERTING THE DETECTOR - 1

V. Carassiti - Princeton (USA) 9-13/01/ INSERTING THE DETECTOR - 2

V. Carassiti - Princeton (USA) 9-13/01/ EXTRACTING THE DETECTOR

V. Carassiti - Princeton (USA) 9-13/01/ THE LAYER IN PLACE