Validation and Consistency Check Presentationon Presentationon.

Slides:



Advertisements
Similar presentations
PLANNING & IMPLEMENTATION of Educational Programmes EFFECTIVE MONITORING FRAMEWORK EFFICIENT EDUCATIONAL MANAGEMENT INFORMATION SYSTEM (EMIS)
Advertisements

The MDGs and School Enrolment: An example of administrative data
Rajiv Vidya Mission (SSA) HYDERABAD. Web–enabled school mapping helps to  Identify habitations without access to schooling facilities.  Conduct proximity.
CAPACITY BUIDLING ON ACCOUNTING AND INTERNAL AUDIT OF SARVA SIKSHA ABHIYAN ANDHRA PRADESH.
Q Q Q Q Q Q Annual Average Prices Health & Education Health & Education Health & Education Construction & Equipment.
State Project Office, SSA, Uttarakhand, Dehradun.
INTERNAL AUDIT Mechanism in SSA-MADHYA PRADESH. Staff sanctioned for Financial Management S.No.Name of Post Post sanctioned Post FilledPost Vacant State.
20 th December, Mysore, Karnataka 1.  Introduction to T.A.M.E.D. templates  Understanding templates  Filling procedure  Department wise templates.
July 11 - September FFIEC Central Data Repository Bank Enrollment.
WELCOME English Language Learners (ELLs) Pat Faircloth Student Achievement through Language Acquisition (SALA) Kim Ward Education Information Services.
Gear Up for Graduation Graduate School Workshop Fall 2014.
Sarva Shiksha Abhiyan, Rajasthan.
Financial Management Information System
INTERMEDIATE PANCHAYATS Sri R.Suryanarayana Reddy, Centre Head, CDP&A.
6 th Annual Focus Users’ Conference Texas Reporting Presented by: Bethany Heslam.
Technology Use Plan Mary Anderson 7/29/08 EDTECH 571 click to go to each slide.
E - Mamta Mothers & Child Tracking
Instructions for Submitting FY12 ( ) Title I Data Office of School Improvement Grant Programs March 2012.
Post Enumeration Survey of DISE 2011 ( 5% sample check) Dr. T. Vijaya Kumar Senior Faculty Centre for Equity and Social Development NATIONAL INSTITUTE.
August 22, 2015 Non Emergency Medical Transportation Program Update September 23, 2014.
EdCIL, Technical Support Group (SSA), New Delhi Presentation on Financial Management Assessment Tool 30th Quarterly Review Meeting of Finance Controllers.
1st NRC Meeting, October 2006, Amsterdam 1 ICCS 2009 Field Operations.
Experience of Vietnam in Census Mapping and Household Listings General Statistics Office of Vietnam.
Special Education Proportionate Set-Aside Requirements October 2014.
Implementation of FM Action Plan and Monthly Expenditure Plan Group-I M.P,Jharkand,U.P.,Gujarat, Chattisgarh,Nagaland,Chandigarh, Daman&Diu Shri Ved Praksh.
Data Management Seminar, 8-11th July 2008, Hamburg ICCS 2009 Main Survey Field Operations.
Tracking Review update November 2013 Rob Williamson Skills & Employability Service Katherine Atkinson ELS Management Information.
Instructions for Submitting FY12 ( ) Title I Data Office of School Improvement Grant Programs March 2012.
WHAT IS EMIS? Education Management Information System Established by law in 1989, the Education Management Information System (EMIS) provides the architecture.
Eligibility Traditional and Mixed Districts- Stay in Training Room with Katie Full CEP- Conference Room with Cindy McIntosh RCCI’s- Valerie’s Office with.
1. The applicant, as an alternative to submitting applications in the usual manner in the concerned office, can submit the application to a CHO i CE Agent.
Online Reporting Guide
 Maintains the Instrument Database  Generates the Calibration Schedules  Maintains Calibration Records  Provides Facility to enter All types of.
Kindergarten Individual Development Survey (KIDS) District 97 pilot involvement December 11, 2012.
Magnet Lab User Portal August 2010.
M&E progress in EFA Goals Prepared by Nyi Nyi THAUNG, UIS (Bangkok) Capacity Building Workshop on Monitoring and Evaluating Progress in Education in the.
Odisha Primary Education Programme Authority S&ME Department Govt. of Odisha 1 Child Tracking System (CTS)
3rd NRC Meeting, 9-12 June 2008, Windsor ICCS 2009 Main Survey Field Operations.
The Jordan Performance Appraisal System (JPAS) is designed to help educators in their continuing efforts to provide high quality instruction to all students.
Year wise Details of Environmental Audits Conducted by SAI India & Appeared in the Audit Reports, as compiled by Regional Training Institute, Mumbai.
1 Field Visit Team 1 Team Members: Uttrakhand, A&N, Assam, Delhi, Jharkhand, Manipur, Nagaland, Sikkim, Amita Singla, Mr. Alok Dubey, SPO, Mr. Ramesh,
October 20, 2015 Copyright © 2010 Infogain Corporation. All rights reserved. Social Statistics Division Central Statistical Organization Ministry of Statistics.
INSPECTION OF SCHEMES. PROCESS OF EARLIER INSPECTIONS INSPECTION TEAM VISITS GRAM PANCHAYATS. ASKS FOR SCHEMATIC DOCUMENTS. FILLS THE INSPECTION FORMAT.
Mapping in Surveys Uses of maps: Plan operations Facilitate data collection Presentation and analysis of results There are two main categories of maps:
An Overview of 5% Sample Post Enumeration Survey of DISE Data Anugula N. Reddy Assistant Professor
Data Management Seminar, 9-12th July 2007, Hamburg 11 ICCS 2009 – Field Trial Survey Operations Overview.
Improving Data Quality Tuscaloosa County School System STI Office/District, McAleer PR.
Under ICDS Scheme. ICDS Profile UNITSANCTIONEDFUNCTIONAL Dist. Level ICDS Cells21 No. of ICDS Projects148 No. of AWCs AWCs in Minority Area
Early Childhood Outcomes Indicator 7 Data Collection Application Review.
ADEPT 1 SAFE-T Judgments. SAFE-T 2 What are the stages of SAFE-T?  Stage I: Preparation  Stage II: Collection of evidence  Stage.
II nd HALF YEARLY MONITORING REPORT OF Giri Institute of Development Studies, Lucknow On MDM for the State of Uttar Pradesh Period: 1st April to 30th September.
Indira Awaas Yojana Ministry of Rural Development, Government of India.
United Nations Workshop on Principles and Recommendations for a Vital Statistics System, Revision 3, for African English-speaking countries Addis Ababa,
Presentation for National Workshop/ Review Meeting of State Project Engineers/ Civil Works Coordinators Puri, Orissa Date : 16 & 17 November, 2011.
Karnataka – Key Information* Population million Proportion of Child Population in age group 0- 6 years : 11.2% Sex Ratio: 968 females for 1000 males.
ASER Pakistan a citizens’ led initiative 1. About the ASER Survey The purpose of the ASER rapid assessment survey and its planned annual rounds in rural.
Reporting a Student thru Different PIMS Submissions Barry Frye Manager of Student Data Information Systems Appalachia Intermediate Unit 08 1.
A Training Course for the Analysis and Reporting of Data from Education Management Information Systems (EMIS)
Community Liaison Training NCLB Parental Involvement Requirements “Creating an Audit Trail” October 19, 2007 Eduardo Elizondo, Director Federal Programs.
PRESENTATION. . The Meghalaya Administrative Training Institute, Shillong as State Nodal agency for implementing the intensive training programme “training.
Research Colloquium on Post-School Education and Training 4 November 2014, Burgers Park Hotel Higher Education and Training Information System Jean Skene,
Strengthening Student Educational Outcomes: ESSB 5946 (2013) LAP and Basic Education.
Teacher Licensure PI-34 Wisconsin’s New Process. New License Stages  Initial Educator 5 year, non-renewable  Professional Educator 5 year renewable.
Login Screen Step 1: Please Enter 21 digit Head of office Login Id and Password Step 2: Click Submit Button.
Student Database Management Information System an initiative towards tracking every student… (In Sync with U-DISE)
Annual Work Plan & Budget
Annual Work Plan & Budget
Document Custodian of the Drop Safe Log
Staff category changes
Staff category changes
Presentation transcript:

Validation and Consistency Check Presentationon Presentationon

Divisions: 18 Districts: 71 Blocks : 813 Clusters: 8135 Gram Sabhas: Villages : Schools (PS / UPS): 1.69 lacs Enrolment (class 1-8): lacs Literacy rate (2001): 56.30ScenarioScenario

Single Teacher Schools: 3278 (PS), 6684 (UPS) Zero Teacher Schools: 151 (PS), 480 (UPS) Schools without Toilet: 9863 (PS), 2390 (UPS) Schools without Water : 1565 (PS), 2191 (UPS) Facility Building Less Schools: 166 (PS), 48 (UPS) Pupil Teacher Ratio: 1: 53 Student Classroom Ratio: 1: 47 % of Female Teachers : 43%GapsGaps Source DISE

Plan of Action Implementing DISE Sl. No.Action ItemTime Target 1Printing of DCF and Instruction Manual15th July 2Distribution of DCFs, etc.30th September 3Training of Dist level personnel30th-1st August 4 Training of sub-dist /cluster level personnel25th August 6Training of Head Teachers10th September 7Field data collection3rd October 8Scrutiny and Cross-checking5th-12th October 9 Data computerization, validation and taking backup for submission31st December 10Compilation / Analysis1st to 5th Jan 11Dissemination After 10 th Januray

Validation and Consistency Check In Uttar Pradesh validation and consistency check has been done in three stages : Stage 1 : Validation Process through education workers Stage 2 : Verification Process through Decision Support System Stage 3 : Consistency Check through DISE In Uttar Pradesh validation and consistency check has been done in three stages : Stage 1 : Validation Process through education workers Stage 2 : Verification Process through Decision Support System Stage 3 : Consistency Check through DISE

 NPRCs responsible for checking DCFs for all schools.  BRCs responsible to check 5% DCFs before submitting data to DPOs  MIS personnel is responsible to check 5% DCFs data with the school records before entering the data in Software  After sample check if there is any problem in data the DCF formats are referred to concerned schools for rectification. Validation Process through Education Workers

 Decision Support System software have been prepared inhouse in Power Builder 6.0 and implemented in all 70 Districts for support to DISE data at District level according to their needs.  The software uses the database of DISE and generate needful reports for Decision making, preparing annual work plan, rationalization of teachers, Free text book distribution etc.  The software also takes care of various types of funds transfer to Village Education committee and generate reports to support Electronic Funds Transfer System (EFS) Verification Process Through DSS

Verification Process Through DSS Contd…. In the software following Verification reports have been generated for verification : 1.Closed Schools : The schools which are closed have had to be verified at field level (ABSAs, BRCs, NPRCs etc.) 2. School Having Zero Enrolment : Schools list distributed to field level functionaries to collect the missing data. 3.Enrolment Check for 2 Year : Schools list have been generated to compare the enrolment from last year to check whether data difference is higher or lesser. The list have been verified from field. 4. School with Teacher and Para Teacher Mismatch : The school list have been generated to ensure consistency between number of teacher / para teacher in school particulars and those given in Teacher Details

Verification Process Through DSS Contd…. 5. Classroom Status Check : The list have been generated to compare number of classrooms from last year to check if classroom are higher or lesser. The list also checks the schools have zero classrooms. 6. Toilet Facility Status Check : The list have been generated to compare the availability of toilet from last year if toilet is available last year. The person from Block should go and verify it and give valid reason for requirement. 7. Water Facility Status Check : The list have been generated to compare the availability of Water Facility from last year. If Handpump is shown available from last year the person from Block should go and verify it and give valid reason for requirement

At third stage, the inconsistency option given in DISE software have been followed by District regarding the following: 1.Master Data 2.Teacher Data 3.Enrolment by Age Data 4.Enrolment by Medium Instruction 5.Repeaters Data 6.Children with Disability Data Consistency Check through DISE

After successful completion on all three stages of verification, the district personnel brings backup of their database with following report :  Block wise GER / NER  District Report Card which shows comparison from last year on various type of Indicators. District have to submit this DRCs duly signed by District Project Officer. Sample of DRCDRC  District have to submit various reports like (List of Closed Schools, Single Teacher Schools, Zero Teacher Schools etc. ) duly signed by DPO.

 At State Level Second & Third Stage is repeated again to see whether district had followed all the verification checks  At State office District data is not accepted until all the stages of verification have been cleared and ensures that all the reports are duly signed by District Project Officer. District Consistency Check At State Level

 During , 5% sample checking of DISE data has been under taken.  Following institutions have been assigned the responsibility of sample survey  G. B. Pant, Allahabad  CDAR, Lucknow  Giri Institute Lucknow  Following 7 districts have been covered : Siddharth Nagar, Barabanki, Chitrakoot, Shahjahpur, Saharanpur, Azamgarh, Sonbhadra  The Institutions have submitted the draft report ot SPO  Final report is received and sent to NUEPA in May’08 5% sample checking by external agency