AIM – CeTARS Web Service Interface: Course Master Schedule and Other Possibilities November 2008.

Slides:



Advertisements
Similar presentations
Cultural Heritage in REGional NETworks REGNET Project Meeting Content Group Results, open issues, workplan
Advertisements

ICAO Seminar on Aeronautical spectrum management (Cairo, 7 – 17 June 2006) SAFIRE Spectrum and Frequency Information Resource (presented by Eurocontrol)
AIM Enterprise Central Site Planning
Review of AIM I/II Change Requests (ACRs) 6 November 2009 Ron Zinnato, NAWCTSD, AIM Lead S/W Eng.
New Release Announcements and Product Roadmap Chris DiPierro, Director of Software Development April 9-11, 2014
Requirements Specification and Management
Jake Aplanalp AIM/CPM Program Manager NAWCTSD Orlando December 2008 Implementing AIM at Your Activity – A General.
NETC N7 Status Update to AIM FRB Roy Hoyt, NETC N74 Jake Aplanalp, AIM Pgm Mgr 23 Aug 11.
TM Aggregate Reporting of Pandemic Influenza Vaccine Doses Administered Discussion of Options 2 & 3: Submitting Aggregate Reports using the Web-Based User.
Mark Entry (SMART Users) Classroom Training Nov 2012.
Authoring Instructional Materials (AIM) Roadmap
Curriculum Institute Presentation July 11, 2009 CCC CurricUNET A STATEWIDE CURRICULUM NETWORK MODEL.
MT Continuum Status Feb 11 Jake Aplanalp, AIM Pgm Mgr Gerry Cullison, SSP Mark Campbell, LM SS for SSP Mike French, LSI Jamie Stewart, AIM team.
1 AIM User Training 4 November 2009 Jake Aplanalp, NAWCTSD, AIM Pgm Mgr Dave Donnelly, CSFE, AIM Course CCMM Yvette Bartholomew, CPPD, Curr Dvlp Course.
AIM Background & Current Capabilities Brief to FRB Jake Aplanalp AIM/CPM Program Manager NAWCTSD Orlando November,
Pertemuan 16 Matakuliah: A0214/Audit Sistem Informasi Tahun: 2007.
Business Modelling for Internet Based Technology Intro Lecture §Recap on Unit Aims §Unit Study Plan l lectures l tutorials l Resources §Unit Assessment.
D-ES-x-xxx Rev A 5/17/10 1 of 21 (Title) – Final Design Review (FDR) (name) PI (name) PA Date of Review First Use Acknowledgements Image of diagnostic.
Microsoft SharePoint 2013 SharePoint 2013 as a Developer Platform
Semester 2, 2003 Week 7 CSE9020 / 1 Software Testing and Quality Assurance With thanks to Shonali Krishnaswamy and Sylvia Tucker.
Feb 2011 AIM FRB Action Item Review 23 Aug 11 Jake Aplanalp, AIM Pgm Mgr.
About Waterloo website Project report June Outline Overview of process Project deliverables Lessons learned.
Course Results Upload (Non-SMART Users) Classroom Training.
New and In-Process Software Capabilities Status Update to AIM FRB New and In-Process Software Capabilities Status Update to AIM FRB Danette Likens and.
Lessons Learned from NETPDTC Central Site Implementations Lessons Learned from NETPDTC Central Site Implementations 23 Aug 11 Peg David, NETPDTC Project.
October 30, 2008 Extensible Workflow Management for Simmod ESUG32, Frankfurt, Oct 30, 2008 Alexander Scharnweber (DLR) October 30, 2008 Slide 1 > Extensible.
Classroom User Training June 29, 2005 Presented by:
Semester 1, 2003 Week 7 CSE9020 / 1 Software Testing and Quality Assurance With thanks to Shonali Krishnaswamy and Sylvia Tucker.
FRB NAVEDTRA 136 Business Process Refinement FRB NAVEDTRA 136 Business Process Refinement Roy Hoyt, NETC N74 Tiffany Dombrowski, AIM Pgm Mgr, NAWCTSD Jamie.
AIM Virtual FRB Meetings Sep, & 1400 Both Days.
Tunis International Centre for Environmental Technologies Small Seminar on Networking Technology Information Centers UNFCCC secretariat offices Bonn, Germany.
Status of AIM I/II and CPM/LO Module Software 4 November 2009 Jake Aplanalp, NAWCTSD, AIM Pgm Mgr Ron Zinnato, NAWCTSD, AIM Lead S/W Eng.
IT 499 Bachelor Capstone Week 4. Adgenda Administrative Review UNIT three UNIT Four Project UNIT Five Preview Project Status Summary.
GSA Expo 2010 DoD Travel Programs Customer Assistance Tools and Services Mr. Joe Ward and Ms. Margaret Hebert GSA Expo May 2010.
NETC N7 Status Update to AIM FRB Roy Hoyt, NETC N74 Leslie Lucas, SLC LSO Jake Aplanalp, AIM Pgm Mgr Feb 11.
The Price Index Processor System PIPS Niall O’Hanlon.
AIM Toolset Interfaces with Authoritative Technical Data 4 April 2012 Jim Ferrall, AIM Team.
Overall Goal of the Project  Develop full functionality of CMS Tier-2 centers  Embed the Tier-2 centers in the LHC-GRID  Provide well documented and.
JDTA Item and Learning Object Versioning – Proposed Approach JDTA Item and Learning Object Versioning – Proposed Approach Jamie Stewart, Steve Wicinski,
AIM Pre-FRB Webmeeting Session 12 Jun 07 Alan Litz NAVAIR Orlando TSD.
Unit 18 Advanced Database Design
Systems Analysis And Design MIST 4620 Fall 2002 Professor: Dale Goodhue.
Managed by UT-Battelle for the Department of Energy Weatherization Assistant: Ramp Up Support Mark Ternes Mike Gettings Oak Ridge National Laboratory 2009.
In-Process and Potential Future Software Capabilities Status In-Process and Potential Future Software Capabilities Status Danette Likens and Jamie Stewart.
Does IS Education Address Enterprise IT User Concerns? Bart Longenecker University of South Alabama Paul Rosenthal California State University, Los Angeles.
1 AIM FRB Briefing Karen Pohl Curriculum Systems Director Naval Special Warfare Center 3 Nov 08.
AIM FRB Meeting Overview 4-6 November 2009 Jake Aplanalp, NAWCTSD, AIM Pgm Mgr.
27th June e-Sales Project Web Liaison Group Meeting 27th June 2005 Chris Sendall and Nick Mattin
Introduction to FFI: Why and how FFI was developed Introduction to FFI: Why and how FFI was developed 04/02/2013.
NETC Authoring Instructional Materials (AIM) Roadmap February Bruce Bare.
 Course Master Schedule/Resource Requirement List Authoritative Data Sources. (CeTARS or AIM CPM)  Identify Current CMS Business rules and deficiencies.
NCI CBIIT LIMS ISIG Meeting– July 2007 NCI CBIIT LIMS Consortium Interface SIG Mission: focus on an overall goal of providing a library of interfaces/adapters.
NCI CBIIT LIMS ISIG Meeting– Aug. 21,2007 NCI CBIIT LIMS Consortium Interface SIG Mission: focus on an overall goal of providing a library of interfaces/adapters.
Workbench - Mechanical Structural Nonlinearities
ICAO Seminar on Aeronautical spectrum management (Cairo, 7 – 17 June 2006) SAFIRE Spectrum and Frequency Information Resource (presented by Eurocontrol)
Briefing room.
The IPT user interface and data quality tools
IS442 Information Systems Engineering
Gemini Re-platforming Project; External User Participation July 2012
04 | Web Applications Gerry O’Brien | Technical Content Development Manager Paul Pardi | Senior Content Publishing Manager.
ICAO Seminar on Aeronautical spectrum management (Cairo, 7 – 17 June 2006) SAFIRE Spectrum and Frequency Information Resource (presented by Eurocontrol)
WI / XA Integration with NetScaler Gateway: How it works
For Computer-Based Testing
Quality Center (QC) 11 Training Global IT QA Testing Team 2013
U.S. Environmental Protection Agency
Keystroke Biometric System
Two methods to observe tutorial
Coordinate Operations Standard
e-Invoicing – e-Ordering 20/11/2008
For Computer-Based Testing
Presentation transcript:

AIM – CeTARS Web Service Interface: Course Master Schedule and Other Possibilities November 2008

Focus of Discussion/Demo Background and overview of current CMS Web service interface Demo of initial CeTARS and AIM sides of interface Discussion of “where to from here” on CMS and other potential Web service interfaces

The Original Issue Many AIM users have traditionally developed Course Master Schedule (CMS) data in conjunction with their AIM- based curricula CMS data then had to be manually re- keyed into CeTARS both at initial curriculum development and at revisions

Background of Automated Interface CeTARS and AIM technical teams worked together in FY03 to define data interchange requirements and develop batch mode for data exchange CeTARS move to Web service vs. batch import made that interface obsolete At Jun 07 FRB meeting, ATRC requested adaptation of AIM CMS output to interface with existing CeTARS Web service API

Process Overview

Implementation Issues Automate process of getting AOIT data into CMS within AIM - resolved Collect all AIM user input data on FedSun and run CMS Web service to CeTARS from there vs. having to establish authenticated connection from every AIM user site to CeTARS production server - resolved PKI-based authentication between FedSun server and CeTARS - resolved Current interface supports single CMS per CIN – do we need to support CDP-level CMS data in AIM for input to CeTARS? - open

Demonstration of Interface Process [screen captures in Backup Slides or live/Captivate demo?]

Where to from here? Other potential Web service data interfaces from AIM to CeTARS: –Test items and test data (ACR xxxxx) –Others ???? Mechanism to explore interface issues in detail and develop detailed functional, cost, and technical data for possible implementation – recommend establishing a standing CeTARS-AIM interface working group CeTARS relationship to future Enterprise Data Environment (EDE)?

Proposed IPT Functional Leads: –Denise Green –Melinda O’Brien Technical Leads: –Paul Graf (AIM) –Mark Brockway (CeTARS) Business process: –Brief kickoff splinter meeting in Orlando this week –Periodic Web meetings / demos as coordinated by Functional and Technical leads

Points of Contact Ron Zinnato, AIM SSO, NAWCTSD Orlando, Melinda O’Brien, AEGIS Training and Readiness Center (ATRC), Paul Graf, AIM Team,

Backup Slides

AIM AOIT Viewing/Editing Procedures

AIM AOIT

AIM CMS Viewing/Editing Procedures

AIM CMS

AIM CMS Output to CeTARS

AIM Course Selection for CMS Output

AIM CMS Exporting to CeTARS

AIM CMS Exported to CeTARS

Error When Course Already Exists in CeTARS

Error When There is a CDP Conflict with CeTARS

CeTARS Navigation to CMS

Query of CIN/CDP

Course Master Schedule version imported

Location of Events Validation Table for Topic Title imported from AIM

Completed CMS Entry in CeTARS