Coastal Protection and Restoration Authority Presentation to Coastal Financing Authority July 30, 2008.

Slides:



Advertisements
Similar presentations
Feasibility Study Overview Louisiana Coastal Area Ecosystem Restoration 19 September 2000.
Advertisements

Restoring and protecting Louisiana’s coast David Peterson – La. AG’s Office – Asst. Attorney General - AG Designee to CPRA Matthew Nowlin – CPRA – Staff.
CPRA Board Meeting, Baton Rouge, LA May 15, 2013 Coastal Protection and Restoration Authority.
Update on Southwest Louisiana Projects Office of Coastal Protection and Restoration.
Cameron Meadows Marsh Creation and Terracing (CS-66) Julia Wall, E.I. Engineering Division May 6, 2014 committed to our coast Coastal Protection and Restoration.
The Coastal Wetlands Planning, Protection and Restoration Act Presentation for the National Science Teachers Association Meeting New Orleans, LA November.
US Army Corps of Engineers BUILDING STRONG ® LOUISIANA COASTAL AREA (LCA) PROGRAM UPDATE June 16, 2010 Presented by: Bren Haase, OCPR Mark Wingate, USACE.
Coastal Protection and Restoration Authority January 18, 2012 Deepwater Horizon Early Restoration Phase I.
BUILDING STRONG ® US Army Corps of Engineers BUILDING STRONG ® Support to Gulf Coast Recovery U.S. Army Engineer Research and Development Center Coastal.
Bayou Dupont Sediment Delivery – Marsh Creation #3 (BA-164)
Southeast Louisiana Flood Protection Authority – East (SLFPA-E) and Pontchartrain Levee District Recommendations for Early Emergency Restoration Projects.
Coastal Protection and Restoration Authority August 22, 2012 Deepwater Horizon.
TROPICAL STORM LEE September 1-6 After Action Report.
Governor's Advisory Commission on Coastal Protection, Restoration, and Conservation June 6, 2012 Deepwater Horizon.
Fiscal Year 2009 Annual Plan: Ecosystem Restoration and Hurricane Protection in Coastal Louisiana.
April, 2008 Office of Coastal Restoration & Management PROJECT UPDATE Office of Coastal Restoration & Management PROJECT UPDATE.
DRAFT CORPS OF ENGINEERS CONTRACTS: Louisiana Coastal Area, Mississippi River Gulf Outlet, and Lake Pontchartrain & Vicinity Presented to the Coastal Protection.
Integrated Ecosystem Restoration and Hurricane Protection: Louisiana’s Comprehensive Master Plan for a Sustainable Coast.
US Army Corps of Engineers BUILDING STRONG ® The Nature Conservancy’s Climate, Risk & Resilience 2013 Learning Exchange Col. Richard Hansen U.S. Army Corps.
Fiscal Year 2010 Annual Plan Ecosystem Restoration and Hurricane Protection in Louisiana Location:CPRA Meeting, LaSalle Building Date:February 18, 2009.
Oil Spill Restoration Planning – NFWF Proposal No.1 Kyle Graham Deputy Director CPRA July 17, 2013 committed to our coast.
Oil Spill Restoration Planning – Part 1 (RESTORE Act, NRDA, SEPs) Kyle Graham Deputy Executive Director CPRA 8/22/2012 committed to our coast.
1 New Orleans District Morganza to the Gulf 23 May 2008 Carl Anderson, Senior Project Manager, USACE.
Increase Atchafalaya Flow to Terrebonne Governor’s Advisory Commission Meeting 7 August 2013 committed to our coast.
SOUTHWEST COASTAL AND SOUTH CENTRAL PROJECTS – Update and Path Forward CPRA Meeting January 22, 2013 committed to our coast.
CPRA UNO Meeting August 13, urplus Funds 2008 $300 Million Surplus Funds Act 3 of the nd Extraordinary Legislative Session provides for:
Update On Mississippi River Delta Management Plan Presented at August 20, 2009, Meeting of Governor’s Advisory Commission on Coastal Protection, Restoration.
US Army Corps of Engineers BUILDING STRONG ® Planning Principles & Procedures – FY11 AUTHORIZATION AND APPROPRIATION OR “It Takes Two to Tango"
Coastal Restoration Updates September 10, 2007 Coastal Restoration Updates September 10, 2007 Louisiana Department of Natural Resources Louisiana Department.
Recreational Impacts of Coastal Restoration Projects CNREP Presentation Joseph Berlin May 28, 2010.
Time Series for Ocean, La of the Louisiana Chenier Plain Aerial Video Survey Program Pontchartrain Institute of Environmental Sciences University.
April 20, 2011 Shoreline Protection Emergency Restoration Plan.
One Team: Relevant, Ready, Responsive, Reliable US Army Corps of Engineers 1 Coastal Protection and Restoration Advisory Committee 3 April 2006 D
Mississippi River Long Distance Sediment Pipeline Project Louisiana Office of Coastal Protection and Restoration Coastal Protection and Restoration Authority.
Oil Spill Restoration Planning Part 2 (RESTORE Act, Criminal, NRDA, SEPs) Kyle Graham Deputy Director CPRA May 15, 2013 committed to our coast.
Presentation to the Little Rock SAME Small Business Symposium by LTC Mark Jernigan Deputy Commander, New Orleans District April 28, 2009 Presentation to.
1 Coastal Wetlands Planning, Protection, and Restoration Act (CWPPRA) Overview.
BUILDING STRONG ® Mississippi River Ship Channel Gulf to Baton Rouge, LA Propeller Club for Port of New Orleans 24 September 2015.
CONSERVATION AND RESTORATION PARTNERSHIP FUND FY 2014 Request For Proposals September 18, 2013.
July 20, 2011 Coastal Protection and Restoration Authority Deepwater Horizon Early Restoration.
Fiscal Year 2012 Annual Plan Integrated Ecosystem Restoration and Hurricane Protection in Louisiana Coastal Protection and Restoration Authority Karim.
The Science and Policy of Louisiana Coastal Ecosystem Restoration.
Building Strong 1 1 MRGO Ecosystem Restoration Plan Feasibility Study Gregory Miller Senior Project Manager Corps of Engineers New Orleans District October.
Time Series for the east end of East Island of the Isles Dernieres Aerial Video Survey Program Pontchartrain Institute of Environmental Sciences.
Spill Related Planning Efforts September 15, 2010 Kyle Graham Governor’s Office Coastal Activities.
Fiscal Year 2009 Annual Plan: Ecosystem Restoration and Hurricane Protection in Coastal Louisiana Draft.
Implementing the Master Plan Kyle Graham Deputy Executive Director CPRA June 20, 2012 committed to our coast.
1 Atchafalaya River and Bayous Chene, Boeuf, and Black, Louisiana Dredged Material Management Plan (DMMP) Kick off Meeting April 13, 2005 Project Manager.
Christopher Knotts, P.E. Public Works & Water Resources Association of Levee Boards of Louisiana Annual Meeting December 3, 2015.
LCA Program State Concerns Moving Forward February 25, 2010 Kyle Graham Governor’s Office Coastal Activities.
Legislation and Louisiana Wetlands Coastal Wetlands Planning, Protection and Restoration Act passed in 1990 named for La. Senator John Breaux of Louisiana.
Donaldsonville, LA to the Gulf of Mexico Feasibility Study.
US Army Corps of Engineers BUILDING STRONG ® OVERVIEW OF THE CIVIL WORKS PROCESS Planning Principles & Procedures – FY 11.
Donaldsonville, LA to the Gulf of Mexico Feasibility Study.
Wetlands Workshop Presented by Em LeBlanc. Let’s go on a Field Trip!
Mississippi River. Names Great One Father of Waters “Great River” “Big River” Derived from the Ojibwe word misi-ziibi ("Great River") or gichi- ziibi.
Review for LA Geography II. Storm surge: wall of ocean water that is pushed inland during a hurricane Coastal Plain: low flat region built by a river.
CPRA Update ALBL Annual Meeting Johnny Bradberry December 8, 2016
Louisiana’s Coastal Protection and Restoration Update
CPRA Program Update ACEC Project Outlook November 17th, 2016
Acadiana Region Cajun Country.
Louisiana Coastal Area
CPRA Program Update ACEC Project Outlook 2017 November 16, 2017
Beneficial Use of Dredged Material
Fab-Five Projects New Orleans FY19-FY23
Regions of Louisiana.
Regions of Louisiana.
GOMESA and RESTORE Funding
Challenges and Opportunities in Addressing Climate Change
Committed to our coast Preliminary Assessment of Restoration Impacts in the Isles Dernieres, Terrebonne Parish, LA CPRA Board Meeting Baton Rouge,
Presentation transcript:

Coastal Protection and Restoration Authority Presentation to Coastal Financing Authority July 30, 2008

Director of Implementation, David Miller Planning and Project Management David Fruge Engineering and Operations Christopher Knotts Louisiana Coastal Engineer and Science LACES Coastal Protection and Restoration Authority Implementation Structure

Primary Funding Authorities Coastal Wetlands Planning, Protection Restoration Act (CWPPRA) Coastal Impact Assistance Program (CIAP) Water Resource Development Act (WRDA) La. Coastal Area (LCA) Program (WRDA) State Coastal Protection and Restoration Trust Fund State Capitol Outlay Funds Gulf of Mexico Energy Security Act (GOMESA)

Cost Share by Project Phase Reconnaissance (100% Federal) Feasibility Study (50%/50%) Pre-Construction Engineering & Design (75% Federal / 25% Non- Federal) Construction (65% Federal / 35% Non-Federal)

2009 Annual Plan – Appropriated CWPPRA -$16 Million CIAP -$67 Million LCA -$20 Million Hurricane Protection - $81 Million Other -$23 Million Programmatic -$17 Million $224 Million

2009 Annual Plan Funding by Project Phase 85%Engineering, Design and Construction ($191 Million) 8%Programmatic ($17 Million) 4%O&M ($10 Million) 3%Planning, S&T ($6 Million)

Potential Additional Needs – 2009 Annual Plan Hurricane Protection  $821,900,000 Coastal Restoration  $428,720,000 Total:$1,250,620,000

Potential Additional Needs – 2009 Annual Plan Hurricane Protection Projects Future Needs ($M)Project Type West Shore-Lake Pontchartrain, LA $ 2.00 Planning Donaldsonville, LA to the Gulf of Mexico Hurricane Protection Project $ 1.90Planning Lake Pontchartrain, LA & Vicinity Hurricane Protection Project $ PED* West Bank Hurricane Protection Project $ PED* Morganza, LA to the Gulf of Mexico Hurricane Protection Project $ 48.00Construction Hurricane Flood Protection, Construction, and Development Program $ 10.00Construction Larose to Golden Meadow Hurricane Protection Project $ 29.00Construction Acadiana Gulf of Mexico Access Channel/ Vermilion Parish Hurricane Prot. $ 3.00Construction TOTAL $ * Preliminary Engineering and Design

Potential Additional Needs – 2009 Annual Plan Coastal Restoration Projects Future Needs ($M)Project Type Biloxi Marsh Restoration $ 28.00Construction Cameron Parish Gulf Shoreline Protection $ 50.00Construction Pipeline Conveyance of Sediment - Plaquemines Parish $ 50.00Construction Mississippi River Reintroduction into Bayou Lafourche $ 8.30PED and Const. Caminada Headland Restoration - LCA $ Construction Shell Island Restoration - LCA $ 92.60Construction Beneficial Use of Dredged Material - LCA $ 30.00Construction Hope Canal - LCA $ 6.00Construction Myrtle Grove - LCA $ 20.00Construction Louisiana Applied Coastal Engineering and Science Program (LACES) $ 1.50Science & Tech. Restoration Partnerships $ 3.00PED/ Const. GPS Network $ 0.15Science & Tech. MMS Sand Inventory $ 0.07Science & Tech. WAVCIS $ 0.10Science & Tech. Implementation of Non-Structural Recommendations $ 0.50Other Initiatives TOTAL $