Michigan Transportation Alternatives Program Michigan Suburbs Alliance November 18, 2013.

Slides:



Advertisements
Similar presentations
Bob Vasek Cooperative Agreements Engineer Mn/DOT Metro State Aid Overview and Planning and Programming Tom Leibli Cooperative Agreements Project Manager.
Advertisements

2013 TAP CONFERENCE MAP-21 FINAL GUIDANCE ODOT Office of Local Programs.
Southeast Michigan Council of Governments. Michigan Transportation Alternatives Program (TAP): Implementing Successful Projects Kevin Vettraino Planner,
Safe Routes to School Basics April Morrison-Harke SR2S Contracts Coordinator
2014 APPLICATION CYCLE TRANSPORTATION ALTERNATIVES PROGRAM.
Capilano Road Improvement Project WELCOME TO THE OPEN HOUSE.
Local Programs Update July 24, 2014 Jennifer B. DeBruhl Director, Local Assistance Division.
Transportation Alternatives Program FY 2015 Proposed Projects for Funding in Northern Virginia Transportation Planning Board May 21, 2014 Sarah Crawford.
Transportation Enhancement Activities Expanding transportation choices, increasing recreation opportunity and access, revitalizing economies.
Bicycle and Pedestrian Funding Overview NYS Bicycle and Pedestrian Advisory Council August 2, 2010 Albany, New York.
Transportation Alternatives. MAP-21 & TAP MAP-21 requires the following with respect to the allocation & selection of projects: ◦TAP funds sub-allocated.
Illinois Department of Natural Resources. Illinois Coastal Management Program Illinois was officially approved as a Coastal Management Program on Jan.
PennDOT’s Transportation Alternatives Program February 18, 2014.
Safe, Accountable, Flexible, Efficient Transportation Equity Act: A Legacy for Users SAFETEA-LU Key Safety Provisions Federal Highway Administration.
Safe Routes to School: An update on programs, practice and how public health is playing a role Nancy Pullen, MPH, Program Manager September 14, 2006.
History of US Bicycle Routes In 1970’s interest in long distance bicycle travel proliferates.
Federal MAP-21 Programs 1 Module 7 Safety Analysis in a Data-limited, Local Agency Environment July 22, Boise, Idaho.
Funding Levels Similar funding levels to the Transportation Enhancement Activities under SAFETEA-LU: FY 2013: $808,760,000 FY 2014: $819,900,000 Total.
Transportation Alternatives Program (TAP) Recreational Trails Program (RTP) National Historic Trails Workshop, October
Webinar: August 28, Transportation Alternatives Program Webinar: August 28, 2013 Introduction: Shari Schaftlein, Director, FHWA Office of Human.
Transportation Alternatives Program (TAP) Recreational Trails Program (RTP) International Snowmobile Congress — June
Statewide Local Agency Project Delivery Conference SAFETEA-LU: Earmarks and Federal Programs Relating to Local Agencies Travis Brouwer ODOT Federal Affairs.
Transportation Alternatives Program (TAP) 2015 Call for Projects Workshop February 17, 2015 HCMPO Conference Room| Weslaco, TX.
Federal Transportation Funds for Snowmobile Trails Christopher Douwes Trails and Enhancements Program Manager.
Kansas Department of Transportation Becky Pepper Bicycle and Pedestrian Coordinator Kansas Department of Transportation Contact:
2012 FTIP/FSTIP Workshop Project Selection Process.
SUCCESS OF INDIANA TRANSPORTATION ENHANCEMENTS Indiana TE Committee Gerald Nieman, INDOT, TE Program Manager Tom Beck, INDOT/Railroad Glenda Seal, INDOT/Seymour.
Trail Funding Sources & General Information
TRANSPORTATION ENHANCEMENTS. OVERVIEW  The CRTPA coordinates the annual submission of priority project lists (PPLs) to the FDOT for annual funding consideration.
Distribution Guided by State Law Surface Transportation Program (STP) Surface Transportation Program (STP) Congestion Mitigation & Air Quality Improvement.
1 Transportation Alternatives Program FY2015 Application Update February 19, 2014 Jennifer DeBruhl Director, Local Assistance Division.
From Planning to Pouring: The Evolution of Safe Routes to School Julie Walcoff, Ohio DOT, Columbus, OH Alex Smith, Columbus Public Health, Columbus, OH.
School-based projects from a Transportation Act program.
Capital Improvement Program. During the Annual Strategic Action Plan (SAP) evaluation, long-term needs and priorities are identified by City Council Capital.
Ron Hall Tribal Technical Assistance Program Colorado State University
MDOT Office of Economic Development Michael B. Kapp, Administrator Grant Programs Overview Transportation Solutions for Vibrant Communities.
Introductions Introduction to TCAG Federal Metropolitan Planning Organization (MPO) Responsible for long-term planning for all modes of surface transportation.
MOVING AHEAD FOR PROGRESS IN THE 21 ST CENTURY MAP-21 Volusia TPO TCC & CAC Presentation – August 21, 2012.
Broward Complete Streets Technical Advisory Committee (TAC) Meeting Monday August 10, 2015.
Transportation Enhancements Application Workshop Welcome!! October 3 & 4, 2012.
ADOT Multimodal Planning Division Planning Assistance for Rural Areas (PARA) Program Overview December 4, 2013.
MOVING AHEAD FOR PROGRESS IN THE 21 ST CENTURY MAP-21 Volusia TPO Board Presentation September 25, 2012.
TRANSPORTATION ENHANCEMENTS (TE) PROGRAM. Transportation Enhancements (TE) Program What is the Transportation Enhancements (TE) Program? What is the Transportation.
1 Moving Ahead for Progress in the 21 St Century (MAP-21) Public Law Preliminary Briefing Pioneer Valley MPO Joint Transportation Committee September.
MDOT Office of Economic Development Michael B. Kapp, Administrator Grant Programs Overview Transportation Solutions for Vibrant Communities Upper Peninsula.
INTRODUCTION TO FEDERAL HIGHWAY FUNDING AND ELIGIBILITY Steve Baumann Financial Specialist (503) Mike Morrow(Field Operations Engineer) Mike.
Transportation Programs. Habitat and Wildlife Habitat Connectivity Restoration Mitigation Wildlife Human Safety Crossings.
Caltrans Transportation Planning Grant Programs: Partnership Planning & 5304 Transit Planning Presented by Priscilla Martinez-Velez California Department.
PRESENTED BY PRISCILLA MARTINEZ-VELEZ CALIFORNIA DEPARTMENT OF TRANSPORTATION DIVISION OF TRANSPORTATION PLANNING SACRAMENTO, CA (916)
Transportation Alternatives Program (TAP) Recreational Trails Program (RTP)
Phil Pratt, PE Highway Engineer FHWA, Wyoming Division
Transportation Enhancement Program MDNR Natural Resources Trust Fund Workshop SEMCOG University October 15, 2009 Vince Ranger TE Grant Coordinator MDOT.
Complete Streets Michigan’s Approach Mark A. Van Port Fleet AASHTO SCOD Annual Meeting July 15, 2008.
Regional Concept for Transportation Operations: An action plan to address transportation operations in Southeast Michigan Talking Technology & Transportation.
TRANSPORTATION ALTERNATIVES PROGRAM 2016 Project Scoring Update Workshop.
PennDOT’s Transportation Alternatives Program November 16, 2015.
Safe, Accountable, Flexible, Efficient Transportation Equity Act: A Legacy for Users Advancing Safety through SAFETEA-LU Michael Halladay FHWA Office of.
TRANSPORTATION ALTERNATIVES PROGRAM 2016 Project Scoring Update Workshop.
TRANSPORTATION ALTERNATIVES PROGRAM 2016 Project Scoring Update Workshop.
Caltrans Transportation Planning Grant Programs: Partnership Planning & 5304 (formerly 5305) Transit Planning Presented by Priscilla Martinez-Velez California.
Active Transportation Program California Transportation Commission Mitch Weiss 01/14/141.
TRANSPORTATION ALTERNATIVES PROGRAM (TAP) - FFY2018 & FFY2019 Funding & Application Processes Santa Fe MPO Technical Coordinating Committee Meeting; May.
FUNDING AVAILABILITY & SAFETY PROGRAMS 3//21/2013.
RebuildIndy Indianapolis Department of Public Works March 2011.
Department of Transportation and the Corporation for National and Community Service: Engaging Corps.
TITLE PAGE: Project Title
Central Minnesota Area Transportation Partnership Primer Welcome
Transportation Alternatives (TA) Set-aside
Chris Metka 2017 Statewide Conference on Heritage ???
Federal-aid Highway Program
Presentation transcript:

Michigan Transportation Alternatives Program Michigan Suburbs Alliance November 18, 2013

Transportation Enhancement Program Popular program with most states and local communities Some states didn’t embrace TE Some states used TE funds only on their system Some Members of Congress thought TE was frivolous

Congressional Compromise Consolidate 3 federal programs (TE, RTP and SRTS) into one program – TAP Eliminate some TE program categories Substantial reduction in overall funding Allow transfer provisions to give states flexibility Strengthen input of locals by mandating a role for Metropolitan Planning Organization’s

TE, SRTS, & RTP in Michigan before MAP-21 TE – centralized DOT review and selection process SRTS – centralized DOT review and selection process after school-based planning process Open call for applications, quarterly review meetings Quarterly communication between DOT and MPO’s sending TE and SRTS application and approved project lists All Local TE and SRTS projects implemented by Local Agencies through MDOT’s letting process and with MDOT oversight Both TE and SRTS Programs were and are in the same MDOT office RTP – administered by the MDNR

Funding Distribution Statewide TAP Apportionment $26 Million Rec. Trails $2.9 million 50% by Population 50% Any Area SEMCOG Region Receives about $5 Million

MAP-21 Challenges: MAP-21 Challenges: MDOT perspective Less than 90 days to prepare new program Many unknowns Grant IT system was scheduled for August 2013 implementation and designed with “TE” in mind 6 Large MPO’s and State received direct suballocation - could result in 7 different TAP Programs Avoid disruption of existing TE projects that were “in the pipeline” Let’s not make the same mistakes again! Direction from MDOT Director

MAP-21 Challenges: MAP-21 Challenges: SEMCOG perspective Less than 90 days to prepare new program Many unknowns SEMCOG did not have a system established to process TAP projects SEMCOG did not have staff available to solely dedicate to TAP Because of “Fiscal Constraint”, there is pressure to obligate all available funds within a FY Pressure to show value of projects

Answer: Answer: DOT/MPO Collaboration MDOT and SEMCOG began meeting to coordinate respective TAP’s MDOT Selection Advisory Committee utilized by SEMCOG for project comment and technical review Schedules have been coordinated to fully integrate MDOT’s Selection Advisory Team into SEMCOG’s TAP application process SEMCOG funded some projects from MDOT’s FY 2013 Conditional Commitment list

Answer: Answer: DOT/MPO Collaboration SEMCOG (and the 5 other Large MPO’s in MI) adopted the MDOT Grant System for TAP applications and review documentation Monthly meetings are held between MDOT and MPO’s to discuss the implementation status of all TAP projects (MPO selected and MDOT selected) Reports have been developed to track project progress through the grant application, review, selection, and implementation processes

Advantages: Advantages: MDOT’s perspective Win-win for customers! One application, DOT and MPO’s will coordinate reviews and negotiate funding MDOT grant system makes statewide TAP reporting much more efficient More collaboration can lead to better projects that are more likely to be implemented “$ on the ground”, benefitting MI communities Good government in action!

Advantages: Advantages: SEMCOG’s perspective Staff time savings - didn’t have to “reinvent the wheel” Did not require a new application portal Take advantage of MDOT’s experience with TE and SRTS projects Builds even more professional links between MDOT and SEMCOG SEMCOG can consider funding all or part of an application submitted to MDOT, and vice versa

Other Advantages Other Advantages Jointly funding projects – MPO’s use all or a portion of their suballocated TAP funding and MDOT uses “Any Area” funds on the same project Helps the Large MPO’s with small TAP suballocations (examples: Niles area receives $43,000/year from the South Bend, IN urbanized area and Kalamazoo receives $246,000/year) So far, MDOT and the MPO’s have jointly funded 6 TAP projects More collaboration likely

Proactive and joint approach to outreach/education of TAP to public Two TAP workshops held Focus on best practices, advice to getting projects funded, & technical assistance on navigating both MGS and eligibility requirements One specific to SRTS - changes under MAP-21/TAP, planning process, eligibility, case studies Ongoing MDOT/SEMCOG outreach to communities Emphasis on meeting prior to application (recommendations; potential other funding sources; meeting match requirements; etc.) Other Advantages Other Advantages

Important Notes Important Notes MDOT and MPO’s still retain separate competitive selection processes See MDOT’s competitiveness criteria at: See SEMCOG’s competitiveness criteria at: Former TE activities and SRTS are still being treated as two separate programs at the DOT level, however, they share the same review schedules RTP is still being administered by the MDNR

Eligible Activities Eligible Activities On-road and off-road trail facilities for pedestrians, bicyclists, and other nonmotorized forms of transportation including: Sidewalks Bicycle infrastructure Pedestrian and bicycle signals Traffic calming techniques Lighting and other safety-related infrastructure ADA compliance

Eligible Activities Eligible Activities Examples: Pedestrian/Bicycle Facilities Detroit Midtown Loop Marine City Broadway Streetscape

Eligible Activities Eligible Activities South Lyon Southwest Connector Detroit Riverwalk at Milliken State Park Examples:Pedestrian/Bicycle Facilities

Eligible Activities Eligible Activities Macomb Orchard Trail Bridge over M-53 DDOT Bike Racks on Buses Examples: Pedestrian/Bicycle Facilities

Eligible Activities Eligible Activities Detroit West Vernor Bike Lanes Examples: Pedestrian/Bicycle Facilities

Eligible Activities Eligible Activities Infrastructure-related projects and systems that will provide safe routes for non-drivers including children, older adults, and individuals with disabilities to access daily needs

Eligible Activities Eligible Activities Conversion and use of abandoned railroad corridors for trails for nonmotorized users. Polly Ann Trail Detroit Dequindre Cut Greenway

Eligible Activities Eligible Activities Construction of turnouts and overlooks M-25 White Rock Overlook M-26 Great Sand Bay Overlook

Eligible Activities Eligible Activities Community improvement activities, including: Inventory, control, or removal of outdoor advertising Preservation and rehabilitation of historic transportation facilities Vegetation management practices in transportation rights-of- way to improve roadway safety, prevent against invasive species, and provide erosion control Archeological activities relating to impacts from implementation of transportation projects eligible under title 23. Houghton Historic Brick Street

Eligible Activities Eligible Activities Any environmental mitigation activity, including pollution prevention and pollution abatement activities and mitigation to: Address stormwater management, control and water pollution prevention or abatement related to highway construction or due to highway runoff, including activities described in sections 133(b)(11), 328(a), and 329 of title 23 Reduce vehicle-caused wildlife mortality or to restore and maintain connectivity among terrestrial or aquatic habitats Grand Rapids Plainfield Avenue Bio-retention Basins

Match Requirements 20 percent minimum from non-federal sources Encourage partnerships with foundations, businesses, nonprofits Higher match is welcomed

Eligible Entities Southeast Michigan Act 51 agencies are eligible to submit projects County road agencies Cities/villages Transit agencies Others through eligible entities (need Sponsorship Agreement)

Master Grant System (MGS) TAP Online Application

Application Process Application Process Discuss your project idea with MDOT/SEMCOG Online application: MDOT Grant System Register at

Application Process Application Process

MDOT Timeline

MDOT Project Competitiveness Details Please visit for TAP Competitiveness Detailswww.michigan.gov/tap Please visit for SRTS Competitiveness Detailswww.saferoutesmichigan.org Discuss project with an MDOT or MFF grant coordinator

Project Implementation MDOT Local Agency Programs (LAP) will assist you through the federal aid implementation process Contacts Bruce Kadzban, P.E. LAP Manager | Landon Johnson, P.E. LAP Staff Engineer |

Project Implementation Construction Phase - Federal funding requirements Davis Bacon wage rates 1999/2012 AASHTO design standards 2011 Michigan Manual of Uniform Traffic Control Devices (MMUTCD) Environmental clearance Permits SHPO approval Right of way certification Historic Preservation Covenant Matching funds must comply w/ FHWA Resolution from transportation agency governing body to certify a fully funded project and maintenance Competitive bid process through MDOT Local Agency Programs (LAP) referred to as the MDOT let process

Project Implementation Construction Phase - MDOT letting process Letting Schedule found at Complete Grade Inspection (GI) package must be submitted to LAP Plans (80% complete) Special provisions Cost estimate Programming application (MDOT form #0259)

Contact Us SEMCOG Contacts: Kevin Vettraino, TAP | Kajal Patel, SRTS | MDOT Contacts (TAP): Vince Ranger, Grant Coordinator | MFF Contacts (SRTS):  Adrianna Jordan, Grant Coordinator |

Questions?