Practice Class Exercise CHINA Enroute 1 BEIJING, CHINA; 30 JUN-11 JUL 2014
PBN Implementation Processes 2
3 Airspace Concept Activity Overview
Route Spacing ✈ Airway vs Air Route 4 10km
Route Spacing ✈ Air Route ✈ RNAV km offset ✈ (doc x XTT2.0 +buffer 1.00) ✈ RNAV 1 – 8.4km offset ✈ (9nm enroute euro RNAV1; US RNAV2) ✈ RNP 1 – 6.5km offset ✈ (7nm enroute euro) ✈ Air Route ✈ RNAV km offset ✈ (doc x XTT2.0 +buffer 1.00) ✈ RNAV 1 – 8.4km offset ✈ (9nm enroute euro RNAV1; US RNAV2) ✈ RNP 1 – 6.5km offset ✈ (7nm enroute euro) or 8.4 or or 8.4 or 6.5
Beijing Area 6
Guangzhou Area 7
Beijing/Hong Kong 8
Distance Differences
Good Design Practice 12 CORNER-POST Flows by quadrant, segregate Arrivals laterally and vertically from Departures
BR SP VT RJ BH
Good Design Practice 14 In TMA/APP Crossing routes i n ACC – Cross when level
BeijingBeijing ✈ Team Organizer ✈ Team Recorder ✈ Team Name ✈ Team Organizer ✈ Team Recorder ✈ Team Name 15
BeijingBeijing ✈ Safety ✈ Capacity ✈ Efficiency ✈ Environment ✈ Access ✈ Safety ✈ Capacity ✈ Efficiency ✈ Environment ✈ Access 16
BeijingBeijing ✈ NavSpec? ✈ Corner Posts? ✈ ACC Transition points? ✈ NavSpec? ✈ Corner Posts? ✈ ACC Transition points? 17
Beijing/Hong Kong/Shanghai 18
FiniFini 19