Today’s Workshop This workshop is being held in response to requests from interested parties to be included in the development of the revised regulations.

Slides:



Advertisements
Similar presentations
Head of Policies & Planning Division Ministry of Environment
Advertisements

Permits, RFIs and CEQA, Oh My! When to Approve/Require RFI Amendments and When is CEQA Involved? 8 th LEA/CIWMB Partnership Conference May 11, 2005.
Alternative Daily Cover (ADC) Investigation Report.
Chapter F.A.C. Updates F. Thomas Lubozynski, P.E. Waste Program Administrator.
Your logo here WasteMINZ Mid-Year Roundup Wellington.
The Proposed Part 115 Rules and Waste Utilization East and West Michigan Chapters of the Air and Waste Management Association & The Environmental Law Section.
Chip and Grind Facilities Compliance First: Evaluation of Solid Waste Facilities’ State Standards Training Provided By: California Integrated Waste Management.
EXAMINATION OF MODERN SANITARY LANDFILLS W. Gregory Vogt Chair, Sanitary Landfill Working Group, ISWA Vice President, SCS Engineers.
BCC PUBLIC HEARING Concrete & Asphalt Plants Ordinance Adoption Hearing ZONING DIVISION January 27, 2015.
Construction and Demolition Waste Management at UVM
CCDD Rules and Regulations Salvaging Chad Broege – Thelen Sand & Gravel.
Building for theBy Recycling Industrial Materials Industrial Materials Recycling Kimberly Cochran, PhD US EPA Office of Solid Waste AGC Building Division.
June 19, 2014 CONTROL OF TRASH ENTERING WATERWAYS IN CALIFORNIA DRAFT WATER RESOURCES CONTROL BOARD POLICY.
RIVER RANCH ORGANICS AN ENFORCEMENT ODYSSEY. Parvaneh Byrth Riverside County LEA Phone:
Revised ADC Regulations New text in italics and blue § Beneficial Reuse.
Alternative Daily Cover (ADC) Demonstration Project Guidance Stakeholder Workshop Waste Compliance and Mitigation Program Monthly Public Meeting August.
Mid-Florida Materials (MFM) (Division of Hubbard Construction) C&D Debris Disposal Facility Renewal of C&D Permit.
Department of the Environment Maryland’s Solid Waste Statutes and Regulations As They Bear on Composting 5/21/2009 Edward M. Dexter, P.G., Administrator,
DEPARTMENT OF HUMAN SETTLEMENTS- SANITATION INPUTS ON NATIONAL WASTE MANAGEMENT STRATEGY 29 MAY 2012 By Mandisa Mangqalaza.
Permit Implementation Regulations (AB 1497) Package Update Key Issues 1. Significant Change and Modified Permit Process 2. Public Noticing and Hearing.
Barriers to C&D Reuse & Recycling Survey Results & Findings.
New Ag Waiver for the San Diego Region (including Temecula Valley) Water Quality Workshop Rancho California Water District November 6, 2008 Presented by.
Organics Policy Roadmap  Sub-directive 6.1: 50% reduction of organics in waste stream by 2020  Need additional capacity to process 15 million tons per.
New Zealand Building Code What is it?. The New Zealand Building Code is the first schedule to the Building Regulations All building work must comply.
Construction and Demolition Inert Processing Operations Compliance First: Evaluation of Solid Waste Facilities’ State Standards Training Provided By: California.
California Venue and Event Recycling Legislation Review of AB 2176 Model Ordinance For Waste Reduction at Venues and Events.
Phase II C&D Waste & Inert Debris Disposal Regulations Comments.
Proposed Amendments to Chapter 32, Article V, Solid Waste Management, and to Chapter 38, Zoning Orange County Code Presented by the Orange County Environmental.
Screen | 1 EPA - Drivers for Regionalisation Max Harvey Director Operations Environment Protection Authority Presentation, reference, author, date.
TRB: Waste Management and Resource Efficiency Workshop July 2011 Tom Roick, Senior Policy Analyst Oregon Department of Environmental Quality Oregon DEQ’s.
1 2 nd Informal Workshops on Draft Revisions to the Disposal Reporting System Regulations June 24, Diamond Bar June 26, Sacramento.
SUMMARY OF INFORMAL COMMENTS Temporary Waiver of Terms Regulations May 2006.
Department of Public Works Non-Exclusive Solid Waste Collection Franchise System – Review September 29, 2014.
Cedar Grove Landscape & Construction Services Specifying Compost and Soils for BMP T5.13 Soil Quality and Depth,
Focused Workshop on the Informal Draft Revised Disposal Reporting System Regulations Session #1 March 2003.
Plastic Trash Bag Program  Report to the Legislature –Originally due October 2001 –Delayed pending results of Plastics White Paper –Report updated to.
Welcome Revisions of Chapter WAC Sections -035 and -036 Rule advisory committee workshop #5 Lacey, WA October 28, 2009.
SPECIAL WASTE TRAINING Rick Thompson Solid Waste Section.
Regulatory Review Update Strategic Directive 8.3 Regulatory areas supporting the Organics Road Map In Review Compostable Material Storage Limitations Agriculture.
California Integrated Waste Management Board November 10, 2008 Item #2 Discussion And Request For Direction Regarding The Board's Fulfillment Of The Requirements.
Cal/EPA Building Room 550 Financial Assurances Phase II Informal Rulemaking Group Meeting May 12, :00 am to 12:00 pm Financial Assurances Phase II.
REVISED DISPOSAL REPORTING & ADJUSTMENT METHOD REGULATIONS 14 CCR Sections et. seq. 14 CCR Section CCR Section
Rigid Plastic Packaging Container (RPPC) Informational Update Permitting and Compliance Committee Meeting February 17, 2009.
Phase II Proposed C&D Waste and Inert Debris Disposal Regulations Discussion of Issues & Alternatives, Comment Summary & Staff Recommendations.
Construction and Demolition Waste Management at UVM.
1 Draft Final Safe Fill Regulations. 2 W hat’s new in Safe Fill Definition? Definition is short as a result of: – Due diligence procedures moved to existing.
March 2003 Focused Workshop on the Informal Draft Revised Disposal Reporting System Regulations Session #2: Transfer Station Issues.
1 Bioreactor Landfill Operations Regulatory Perspective Considerations ASTSWMO Conference July 23, 2003 Scott Walker, PE, CEG California EPA Integrated.
Update on Methane Regulations Affecting Landfills Pat Sullivan Senior Vice President SCS Engineers Nov. 10, 2015.
1 Permit Implementation Regulations Defines the phrase “significant change in the design or operation of a solid waste facility that is not authorized.
Welcome to the Permit Implementation Regulations Informational Presentation.
Discussion And Request For Direction Relative To Strategic Directive 8.3 Regulation Reviews For Alternative Daily Cover And Food/Green Waste Composting.
Presentation of Contractor’s Report “California 2008 Statewide Waste Characterization Study” CIWMB Strategic Policy Development Committee September 9,
Presentation to Association Municipalities of Ontario Implementation of Management of Excess Soil - A Guide for Best Management Practices Ministry of the.
Status Report On Staff Review Of Board Regulations For Alternative Daily Cover, Food And Green Waste Composting, Farm And Ranch Composting, Compostable.
California Integrated Waste Management Board 1 Rigid Plastic Packaging Container (RPPC) Informal Rulemaking Jerry Berumen Permitting and.
Preliminary Analysis of an Evolving Issue Inert Disposal Sites and Permits Background  Definitions  Non-Traditional Facilities  LA Sites  New Information.
Discussion of Priority Activities for Next Eighteen Months Action Plans.
Work Related to Senate Bill 2202 (effective January 1, 2001)
Item 21 May 11-12, 2004 CIWMB Meeting Discussion And Request For Rulemaking Direction To Formally Notice Proposed Regulations For RCRA Subtitle D Program.
1 Draft Final Safe Fill Regulations Major Changes/Revisions Presented to the CSSAB November 8, 2002.
1 Sahtu Land Use Planning Board Public Hearing on the Draft 3 Sahtu Land Use Plan May 2011 INAC Presentation.
DEMOLITION WASTE RECYCLING RCBC 2016 Conference | May 2016 PRESENTERS: Suzanne Bycraft: Manager, Fleet & Environmental Programs Linh Huynh: Waste Reduction.
2/10/05 California Integrated Waste Management Board1 Consideration Of A Report to the Legislature: Plastic Trash Bag Program And A Comprehensive Approach.
Welcome to the Permit Implementation Regulations (AB 1497) Workshop.
The NEW Distance Education Guidelines
Impacts of new Legislation on waste statistics
Tire Accountability Program
Tajiguas Resource Recovery Project Doing More with Our Waste
SOLID WASTE MANAGEMENT PRINCIPLES
Presentation transcript:

Today’s Workshop This workshop is being held in response to requests from interested parties to be included in the development of the revised regulations regarding ADC. This public workshop provides an opportunity to explore, understand, and discuss the proposed regulations.

P&E Committee - October 2002 Request for Board Direction  Staff requested Direction to Initiate Formal Notice of Proposed Revised Alternative Daily Cover (ADC) Regulations (Title 27 of the CCR sections & 20690)  Board discussed and concurred in going forward w/60-day formal comment period

Background/History Proposed Revised ADC Regulations  1996 (AB 1647) – Legislative Intent for ADC  ADC Regulations effective  7/01-4/02 Board action- specific facilities re: 2000 ADC overuse/abuse; C&D ADC issue  7/01 Board direction re: policy issues  9/01-1/02 Workgroup re: policy issues  2/02 Board direction re: policy issues

Staff Activity – Revised ADC Regulations P + I staff were assigned to guide the reg package for this effort Noticed 60-day Formal Comment Period Started 4/18 – formal comments will be accepted until 5:00 p.m. on 6/17 Holding workshops on June 9 – Cal/EPA; June 23 Diamond Bar (SoCal) – AQMD Building ADC Training currently being conducted statewide. The training emphasizes operational issues and is not a forum for regulations development.

Latest Numbers on ADC Use Statewide total - ADC used for the last three years for which there is complete data 1999 = 2,172,804 tons 2000 = 2,220,198 tons 2001 = 3,455,422 tons

Current State of ADC Use Total tonnage as previously noted is up 80% from The ADC materials reported in the tonnage study include green material, sludge, ash, construction/demolition, auto shredder, compost, tires and sediment; tarps are not recorded because no materials are involved. More than 60% of the LF’s in CA use ADC of some kind – the most popular and least expensive are tarps.

Why use ADC and other Materials? The benefits of using ADC and materials of beneficial use at LF’s are: Reduces the need for on-site soil or soil importation for cover material Uses materials not recycled else where, such as sludge, treated auto-shredder waste, shredded tires, used C&D As ‘beneficial use’, waste materials such as concrete or used asphalt can be used for roadbase, winter pads, etc. within the landfill

Scope of regs based on 2/02 Board direction, initial draft of informal workshops & comments received. Material processing & grain size standards C&D ADC material quality control Beneficial Use Other: contamination, storage/handling, blending/layering, RDSI changes, numerical cap not included. Key Issues Considered for Proposed Revised ADC Regulations

Notable Changes in Proposed ADC Regulations The following are the highlights of the revised proposed ADC regulations that will be heard at the Board July 7, 2003 after workshops, training and comments on the regs are included as background for Board members education, etc. Changes to the existing regs are highlighted in blue

Specifications based on recommendations received, staff review of existing operations, & ongoing field studies Green Material ADC -- 95% <6 inches long Construction/Demolition ADC -- 95% <12 inch long; 50% <6 inch C&D ADC Materials must be processed before being spread on the working face Site-specific alternative processing & grain size specifications are allowed if approved by LEA with concurrence of Board Biggest change to the ADC Regs – Pre-processing & Material Grain Size

Why make a grain size requirement/specification? Field studies and inspections have shown that in many LF’s using waste derived ADC without pre-processing, notably C&D wastes in particular, the result can be undesirable as cover.

C&D ADC - Violation ( Contamination)

Why 6 inches and 12 inches as the required specifications? The 6 inch figure for the green waste reflects the standard for ground GWM that can be achieved with most existing grinding machines and would not impose major new costs to operators wishing to comply. The 12 inch figure for C&D waste also reflects a reasonable number provided by operators who were successful in grinding C&D waste for use as ADC. Most particles are under 6 inches but there are often going to be pieces in the 12 inch range or longer.

Green Material ADC - Violation (Contamination/No processing prior to use/ineffective as cover)

Pre-processing Now Better Specified § CIWMB - Alternative Daily Cover. [T14: §17682, § (b)] (2) Waste-derived alternative daily cover shall be processed prior to spreading and compacting on the working face and applied and compacted to ensure no open voids within the material or in contact within the underlying wastes.

C&D Waste without pre-processing – typically applied by being pushed out on to working face and then being compacted

No cross-contamination of ADC w/waste or other ADC materials (11) The owner or operator shall implement a program described in the Report of Disposal Site Information as required by §21600(b)(6) to minimize contamination of alternative daily cover with wastes not included within the individual alternative daily cover material types specified in subdivision (b) of this section and wastes that would conflict with the performance requirements of ¶(a)(2).

Green Material ADC contaminated with waste and litter – January 03 - Violation

Green Material ADC - Violation (Heavy contamination w/litter)

Green Material/C&D ADC - Violation Contamination with other wastes

No Blending or Layering of Different types of ADC permitted without demonstration project and EA approval (b) Unless otherwise specified in this section, alternative daily cover use by blending listed materials other than using side-by-side on the working face, or layering on top of one another listed materials, shall require site-specific demonstration projects approved by the EA with concurrence by the CIWMB as required by subsection (a)(1).

Layering of Different types of ADC Difficult to Evaluate for compliance

Any foreseeable problems with this definition of Green Material ADC? (A) Processed green material shall be green material as defined in Title 14, California Code of Regulations, §17852(u) with the exclusion of manure and plant waste from the food processing industry, alone or blended with soil. Any problems w/new compost regs and/or definition of Green Material?

New Processing Requirement for Green Material – Spec Size (B) Green material used for alternative daily cover shall be processed prior to being applied to the working face. Prior to spreading and compacting on the working face, processed green material shall comply with a grain size specification by volume of 95% less than 6 inches.

Green Material/C&D ADC - Violation

Green Material ADC - Compliance

Green Material ADC Alternative Processing/Grain Size - Compliance with new specifications

Green waste being pre-processed for use as ADC

Green Waste ADC – Specifications/Grain Size Alternative processing and grain size specification requirements may be approved by the EA if the EA determines that the alternative meets the performance requirements of ¶(a)(2) and (a)(3) of this section and the CIWMB concurs.

Sludge Depth used as ADC must be reduced C) Sludge or sludge-derived materials shall be restricted to a minimum compacted thickness of 6 inches and average compacted thickness of less than or equal to 12 inches.

Compost as ADC (C) Compost materials shall be restricted to a minimum compacted thickness of 6 inches and average compacted thickness of less than or equal to 12 inches. Compost materials shall comply with a grain size specification by volume of 95% less than 6 inches.

C&D Processing Requirements (A) Processed construction and demolition wastes and materials shall be ground, pulverized, shredded, screened, source separated, or otherwise processed, alone or mixed with soil in a manner to provide a compacted material free of open voids when applied to meet the performance requirements as alternative daily cover.

C&D ADC – Violation. No pre-processing. No processing at all. Used as is. Entirely ineffective as cover material

C&D ADC - Compliance

C&D ADC Material Definitions (B) Processed construction and demolition wastes and materials used as alternative daily cover shall be restricted to the following materials: rock, concrete, brick, sand, soil, ceramics, cured asphalt, lumber and wood, wood products, roofing material, plastic pipe, plant material when commingled from construction work, and fines derived from processing the above materials.

Grid used to evaluate particle size and compliance with proposed standard

C&D Spec Size Requirements (C) Construction and demolition wastes shall be processed prior to being applied to the working face. Prior to spreading and compacting on the working face, these materials shall comply with a grain size specification by volume of 95% less than 12 inches and 50% less than 6 inches.

The Particulator – allows evaluation for compliance with grain size spec.

C&D Spec size Alternatives w/EA Approval Alternative processing and grain size specification requirements may be approved by the EA if the EA determines that the alternative meets the performance requirements of ¶(a)(2) and (a)(3) of this section and the CIWMB concurs.

C&D ADC Alternative Processing/Grain Size - Allows for Flexibility as determined by the LEA Roofing material w/tar paper can contaminate and disable processing equipment.

Beneficial Use – What is it? Beneficial use materials are waste derived products NOT used as ADC (daily cover) but used in other places around the landfill. Example: crushed concrete used for roadbase, building winter disposal pads, or used as gravel substitutes around gas and leachate collection systems. Materials used for ‘beneficial use’ are mot considered disposed for purposes of DRS and no disposal fees are due.

Beneficial Use – Access Road

Beneficial Use - #1 § Beneficial Use. Beneficial use of solid wastes at a solid waste landfill shall include, but not be limited to, the following: final cover foundation layer, liner operations layer, leachate and landfill gas collection system, construction fill, road base, wet weather operations pads and access roads, and soil amendments for erosion control and landscaping.

Beneficial use - #2 (a) Beneficial use shall be restricted to those solid wastes appropriate for the specific use and in accordance with engineering, industry guidelines, or other standard practices specified in the Report of Disposal Site Information as required by §21600(b)(6).

Beneficial Use #3 (b) Beneficial use shall be restricted to quantities of solid wastes no more than necessary to meet the minimum requirements of (a). Should the CIWMB determine that an owner or operator violated this standard, the owner or operator shall revise the applicable reports to reflect the overuse as disposal, and pay the required Board of Equalization (BOE) disposal tipping fees for the amount of overuse.

BOE/Fees - #1 (7) Should the CIWMB determine that an owner or operator violated this standard, the owner or operator shall revise the applicable reports to reflect the overuse as disposal, and pay the required Board of Equalization (BOE) disposal tipping fees for the amount of overuse.

New RDSI Requirements T 27- Section (6) (B) Alternative Daily Cover and Beneficial Use - Describe alternative daily cover and beneficial use waste types, quantities, processing methods, alternative processing or grain size specifications if applicable, operations methods, and engineering, industry guidelines, or other standard practices to ensure compliance with §§20685 and

RDSI Requirements – cont’d Include calculations and supporting information based on waste types, applicable cover to waste volume ratios, applicable density conversion factors, engineering specifications, methods to minimize contamination, or other pertinent information to determine maximum quantity limits of these materials to be used.

Existing reg – we have had some problems with this one…. (4) The owner or operator shall place compacted earthen material over the entire working face at the end of any operating day preceding a period of time greater than 24 hours when the facility is closed, unless procedures as required by the EA are in place to ensure that the requirements of ¶(a)(2) and (a)(3) are met. Sites open 7 days have had questions about any obligation to cover with soil at regular intervals since it is not clearly prohibited in existing reg…

Issues for Discussion “Green Material” consistency with Compostable Material Regulations? Need for clarity on the the role of LEAs relative to DRS and BOE fees More details for sludge, is all sludge created equally? Should sludge type and use be tightened up? Phase in of the more detailed RFI requirements? Clarity on 24 hr. operations Others?

Questions/Answers Where would you like to start?