11 City of Hallandale Beach Water, Wastewater and Stormwater Facilities Plan Public Meeting.

Slides:



Advertisements
Similar presentations
Wakulla County Sewer Project Eutaw Utilities Presentation April 7, 2011.
Advertisements

TEXAS COMMISSION on ENVIRONMENTAL QUALITY. PROPOSED STUCTURE FOR CHAPTER 217 < Subchapter A Administrative Provisions < Subchapter B Design Bases < Subchapter.
City of Clinton Fiscal Year 2013 Sewer Rate Recommendations Committee of the Whole April 24, 2012.
1 Collection System And Wastewater Treatment Plant Sewer Update
Funding for Municipal Infrastructure Ruth Noemí Colón Acting Secretary of State George Stafford Deputy Secretary of State Public Finance and Management.
Water Services Department Arizona Mexico Commission Bi-National Meeting March 9-11, 2008 David Cavazos Deputy City Manager Water Services Department Arizona.
Town of Plattsburgh Cumberland Head Sewer District Welcome To CUMBERLAND HEAD SEWER DISTRICT INFORMATIONAL MEETING JULY 2009.
“Nucor Road Industrial Corridor – Sanitary Sewer Project” Presented by: Justin Longstreth, P.E. Brian Hannon, P,E, Moore & Bruggink, Inc. October 14 th,
1 Wastewater Capital Improvement Program (CIP) Large Users Meeting March 15, 2010.
Hopkins – St. Louis Park – Minneapolis Regional Sanitary Sewer Improvements Draft Facility Plan January 20, 2010 Metropolitan Council Public Information.
Cuba’s Future Development Needs, Funding Models, and Alternatives. A Perspective of the Operation of a Cuban Water & Sewer Utility. Eduardo Vega-Llort,
FY Budget Presentation to Board of Finance March 31, 2014 SWPCA William P. Brink, Executive Director Rhudean Bull, Administration Manager.
5-Year Capital Improvements Water Supply, Treatment and Distribution Water Treatment Plant #1 – Wells and Wellfields$ 500,000 –
Utilities Planning Group UPCOMING REQUESTS FOR PROPOSALS Larry Tunnell, PE, PG Chief Engineer.
The City of North Bend Sanitary Sewer System
Utility Extension Project
1 Stormwater and Wastewater in Halifax Regional Municipality Presentation to Halifax Watershed Advisory Board John Sheppard, P.Eng. Manager of Environmental.
Chicago Department of Water Management Thomas H. Powers, P.E. Commissioner Leadership Summit June 2, 2015.
Imagine the result Impact Study on MSD Rate Payers of Proposed Consolidation/Merger Phase II – Towns of Biltmore Forest, Montreat and Weaverville Presentation.
2015 Needs Assessment Our Strategy for Success Scott Torpie Washington State Office of Drinking Water.
Water System Planning Study
VOLUSIA COUNTY PUBLIC WORKS DEPARTMENT WATER RESOURCES & UTILITIES DIVISION Mike Ulrich, Director Mike Ulrich, Director.
1 Monthly Operations Report September 15, 2015 Presented to Boynton Beach City Commission Presented by Boynton Beach Utilities
Rapid Assessment Process Project Strategic Plan City of Marfa Water and Wastewater System Improvements Marfa, Texas Presented to: Stakeholders and Project.
Orange County Utilities Department Water and Wastewater Budget Challenges March 9, 2010.
Waste Water Facilities Plan Update November 2, 2009 Palmer Engineering Company / Hazen & Sawyer / CDP Public Hearing Presentation.
Pelican Group of Lakes Improvement District Public Hearing on Facilities Plan Agenda Introduction of PGOLID Board of DirectorsDale Haakenstad Introduction.
Separating Inflow Reduction From Infiltration Removal Using Simple Tools Frederick Bloetscher, PhD, PE Florida Atlantic University.
Short and Long Range Water Supply Planning and Aquifer Performance Test (APT)
METRO WASTEWATER RECLAMATION DISTRICT CAPITAL IMPROVEMENTS PROGRAM
FINAL BUDGET CITY COUNCIL PUBLIC HEARING SEPTEMBER 27, 2011.
TENTATIVE BUDGET PRESENTATION CITY COUNCIL PUBLIC HEARING SEPTEMBER 8, 2010.
2012 – 2016 Financial Plan January 13,  Provide sewer collection and treatment to the City of Nelson  Treatment plant built in the ‘60’s  Nearly.
PROPOSED BUDGET PRESENTATION CITY COUNCIL WORKSHOP AUGUST 23, 2011.
Town of Broadway Fiscal Year 2016 Budget May 19, 2015.
Investing In Our Future. Statement from Mayor Tom Murphy “The Gillette Regional Water Supply Project is essential for quality of life and economic development.
CE 3372 Water Systems Design Lecture 005: Engineering Drawings.
1 Public Hearing User Rate Adjustments April 8, 2008.
Wisler Pierre-Louis, P.E., LEED AP BD+C, CFM, PMP Public Works Director Public Works Department.
DRAFT BUDGET PRESENTATION CITY COUNCIL WORKSHOP AUGUST 10, 2010.
5-Year Capital Improvements Water Supply, Treatment and Distribution Water Treatment Plant #1 – Wells and Wellfields$ 500,000 –
Using New Jersey’s State Revolving Fund to Reduce Combined Sewage Flooding in Camden City Andrew Kricun, P.E., BCEE Executive Director / Chief Engineer.
Water System Master Plan & Rate Study City of DeKalb, Illinois City Council Presentation May 16, 2015.
Hernando County’s Utilities Infrastructure Opportunity through the American Recovery and Reinvestment Act of 2009 (the Federal Stimulus Package)
Presented by: David S. Prinzhorn, P.E. Town Engineer/Public Works Director/Utilities Manager Town of Cave Creek.
December 10, 2009 TOWN OF PALM BEACH WATER COMMITTEE Discussion of Water Plant Options.
City of Joliet 2016 Proposed Budget November 30, 2015.
SMALL BUSINESS OPPORTUNITY FORUM Water Department 2015 Capital Program & 2016 Outlook.
Phase II and Compost Facility Upgrade Projects February 16, 2012.
Town of Enfield : Upgrading the Water Pollution Control Facility & Collection System Jay Sheehan, PE Michael Burns, PE.
FY 2016 Water & Sewer Rates Presented by: The Department of Public Works Works.
What are they and how are they calculated? May 2015.
Operating Efficiencies Costs to operate and maintain the water and sewer system have not varied significantly during the first 5 years of operation.
What is the Cost of Lost Water? AWWA / RCAP Small Systems Operator Training Columbus, Ohio May 24, 2016 AWWA / RCAP Small Systems Operator Training us,
2015 Annual Financial Report December 31, Total Revenue $13,068,887Total Expenditure $14,006,870 Revenue Budget $14,957,884Expenditure Budget $15,669,564.
FY 2017 BudgetHearing September 8, 2016 Mike Loftin, Assistant City Manager - Finance 1.
Advanced Technologies Decentralized Recovery and Reuse
Environmental Services
RUSSELL - ROSSBURN WATER SUPPLY
Kings Bluff Raw Water System Parallel Raw Water Main Project
Separating Inflow Reduction and Infiltration Removal
Recycled Water Project – Sharon Heights GCC
CITY OF MARSHALL CHLORIDE ISSUES September 26, 2017
Water Department has Six Divisions
City Council Meeting February 16, 2010
Parkland/Brookdale Interceptor Replacement
CITY OF MARSHALL CHLORIDE ISSUES NOVEMBER 22, 2016
Public Hearing Sanitary Sewer Fees
FEE INCREASES Public Work Shop June 2, 2018.
Director of Water Engineering
Presentation transcript:

11 City of Hallandale Beach Water, Wastewater and Stormwater Facilities Plan Public Meeting

2 Preparation of a facilities plan is required for future State Revolving Funds (SRF) ■SRFs are appealing to Municipalities because: ●Lower Interest Rate ●Flexible payback terms

3 Facilities planning involves identifying ■Resources ■Resource needs ■Capital needs ■Policy needs Include everything AND the kitchen sink ■DOES NOT OBLIGATE CITY TO CONSTRUCT ALL PROJECTS

4 Engineering / utilities commissioned this facilities plan to include: ■Water Treatment ■Water Distribution System ■Wastewater Transmission System ■Stormwater Collection and Discharge This Facilities Plan was developed as a compilation of reports previously prepared for City => Low budget, overall summary

5 ■10 MGD lime softening water plant built in 1951, expanded in 1968, 1981 ■6 MGD membrane plant constructed in 2008 ■Problems: Aging equipment needs to be replaced (high service pumps, chemicals, membranes, etc.) 1 – Current system – Water treatment

6 Conceptual costs for interim upgrades at WTP Potential Projects Conceptual Cost ($ millions) Groundwater Rule Improvements$0.500 Fluoride Upgrades$0.050 Filter Repairs$0.850 NF Membrane Replacement$0.800 New Well No. 9 / Pipeline / Lime Sludge Equipment / Misc. $1.200 Subtotal$3.400 Contingency20%$0.680 Design / Legal / Administrative15%$0.510 Construction Oversight15%$0.510 Total$5.100

7 2 – Current system – Water distribution ■72 miles of pipe, 2-24 inches in diameter ■Small diameter pipes leak and need replacement ■Problems: Fire flows, pressure limitations, small pipes and deterioration/age of pipes

8 Pressure issues were previously identified in water & wastewater model report ■City is presently replacing pipes to address issues

9 Conceptual cost for upgrades for high service water pumping Improvement Conceptual Cost ($ millions) High Services Pump with VFDs (per Efficiency Study) Electrical Distribution System Replacement Temporary Pumping and Electrical Contingency (20%)0.400 Engineering / Legal / Administration (15%)0.300 Construction Oversight (15%)0.300 Total3.000

10 Conceptual costs for water main replacement program Pipeline Diameter (in) Conceptual Cost ($ millions) Golden Isles NE 4th Ave Gulfstream Park Old Federal Highway Loop Mardi Gras SE 3rd Ave Poinciana Drive Alamanda Dr Tamarind Dr NE 1st St Telemetry0.250 Subtotal3.277 Contingency (20%)0.656 Engineering/Administration/Legal (15%)0.482 Construction Oversight (15%)0.482 Total4.897

11 City is also considering automated meter reading ■Estimated cost is $3.5 Million

12 3 – Current system – Wastewater collection system ■City operates over 50 miles of gravity sewers,18 miles of force mains, and 14 older lift stations ■High groundwater table, low lying City ■Problems: Infiltration/Inflow accounts for almost 40% of wastewater. City pays Hollywood SRWWTP to treat this “wastewater.”

13 What is inflow and infiltration?

14 Conceptual Cost for Inflow/Infiltration Rehabilitation Program Improvement Conceptual Cost ($ millions) I/I Lining/Repair/Replacement Subtotal (contingency included)$4.000 Engineering/Legal/Administration (15%)$0.500 Construction oversight (15%)$0.500 Total$5.000

15 Proposed lift stations and forcemains

16 Conceptual cost of pump station and forcemain upgrades Improvement Conceptual Cost ($ millions) Diplomat Pumps$0.510 PS2$0.074 PS12$0.060 PS 13$ in FM 650 feet$0.078 PS12$0.178 PS 3$0.195 PS 7$0.124 PS 8$3.000 PS14$ in FM PS feet$ in FM to Hollywood$1.237 Subtotal$5.849 Contingency (20%)1.170 Engineering/Legal/Administration (15%)$0.877 Construction oversight (15%)$0.877 Total$8.773

17 4 – Current system – Stormwater

18 Stormwater issues are visible to general public

19 Stormwater infrastructure goals ■Control Stormwater ■Treat Stormwater ■Control Property Damage ■Protect Other Infrastructure ■Prepare for Sea Level Rise Scenarios

20 Conceptual costs for proposed stormwater program Project Conceptual Cost ($ millions) Southwest Quadrant Improvements$ Contingency (20%) $2.498 Engineering / Legal / Administrative (15%) $1.874 Construction Oversight (15%) $1.874 Total $18.736

21 In summary, the facilities plan for SRF presents the summary capital plan for Water/Wastewater/Stormwater Remember – “Kitchen Sink” Approach Item Cost ($ millions) Water High Service Pumping$3.000 Water Plant Upgrades – Interim$5.100 Water Plant Upgrades – Long Term$9.444 Water Main Replacements$4.897 Automated Meter Reading$3.500 Water Distribution System$ Inflow and Infiltration Remediation$5.000 Pump Station Upgrades$8.773 Stormwater$ Total Capital Planning Program (Water/Wastewater/Stormwater) $69.700

22 Questions? Public comments