2 Mission Statement Enhance the quality of life, health and safety of all residents by rendering proper and efficient sanitation, street, water, sewer, stormwater, fleet management, facilities maintenance and right-of-way maintenance services.

3 Organization North Miami 10 sq. mi., NE Miami-Dade 60,000 residents Service Area 90,000 residents 22,000 connections Staffing 500 employees city-wide 150 employees in PWD

4 City Limits and Service Area

5

6 Winson Water Treatment Plant

7 Winson WTP Upgrades Well Rehabilitation Filter Rehabilitation WTP Improvements Accelator Sludge Basin Clearwell New Administration Building Transfer and High Service Pumps New Storage Tanks

8 Well Rehabilitation Winson WTP Upgrades

9 Awards

10 FSAWWA Region VII – Best Tasting Drinking Water 2014 – 1 st Place 2013 – 1 st Place 2009 – 1 st Place FSAWWA State Drop Savers Poster Contest 2014, Division 5 – 3 rd Place Awards

11 Miami-Dade County Consent Decree Sewer Overflow Response Plan Information Management System Program Sewer System Asset Management Plan Gravity Sewer System O&M Program Pump Station Operations & Preventative Maintenance Program Force Main Operations & Preventative Maintenance and Assessment/Rehabilitation Program

12 Recently Completed Projects Biscayne Blvd. Force Main Project NE 131 st ST Force Main Project NW 2 nd AVE Force Main Project

13 Biscayne Blvd. Force Main Project 7,000 LF of 12-inch DIP Contractor: JVA Engineering Contractor, Inc. Engineer: EAC Consulting, Inc. Cost: $1,586,000 Start: 8/2014 End: 3/2015

14 Biscayne Blvd. Force Main Project

15 NE 131 ST Force Main Project 3,100 LF of 16-inch DIP Contractor: Roadway Construction, LLC. Engineer: Kimley-Horn and Associates Cost: $694,000 Start: 9/2014 End: 6/2015

16 NE 131 ST Force Main Project

17 NW 2 AVE Force Main Project 1,600 LF of 10-inch DIP Contractor: Roadway Construction, LLC. Engineer: Kimley-Horn and Associates Cost: $375,000 Start: 10/2014 End: 6/2015

18 NW 2 AVE Force Main Project

19 Projects in Design NE 6 AVE Water Main NE 16 AVE Water Main Hospital Pump Station San Souci 1 Pump Station San Souci 3 Pump Station

20 Sanitary Sewer Lining and Rehabilitation Upcoming Projects

21 THANK YOU!