Accessible Mt. Baker Integrated Multimodal Plan Seattle Planning Commission Michael James, SDOT January 8, 2015.

Slides:



Advertisements
Similar presentations
Transport for Canberra 07 November2013. Transport for NSW: Regional Transport Plan ACT, whilst not part of the region, is an important destination Transport.
Advertisements

Town of Dryden, NY :: Hamlet of Varna – Community Development Plan Public Workshop Project Scoping/Issues Identification December 1, 2010.
Presentation Outline What is a Healthy Neighborhood? Planning Trends and Impacts on Health Planning Tools for Healthy Communities.
The National Context for Smart Mobility John V. Thomas, PhD US EPA Smart Growth Program.
Important Notes for Sustainable Streets Power Point users: (1) Copyright permission for many of the images included in this file has been granted to Ellen.
In March 2015, Mayor Murray announced a proposal for a new 9-year, $900 million transportation levy to replace the Bridging the Gap levy that expires at.
Fitzgerald & Halliday, Inc Hartford, CT Study Advisory Committee Meeting #2 April 10, 2014; 4-6 PM Route 1 Corridor Plan Clinton, Westbrook, Old Saybrook,
PROJECT KICK-OFF Jason Collins, Ph.D., P.E., AICP October 14, 2008.
Joe Olson SW Region Director December 8,  History/Background  Next Steps (Planning & Environmental Linkages (PEL)  PEL Process  Schedule  Questions.
South Gate General Plan: Addressing Health and Climate Change 22 January09.
 City of Mesa Council Presentation October 23, 2014.
1 City of Rapid City and Rapid City Community Planning RAPID CITY BICYCLE AND PEDESTRIAN MASTER PLAN in collaboration with: Kadrmas, Lee and Jackson RDG.
Pinehurst School Traffic Safety Pinehurst School Traffic Safety Meeting January 27-28, 2015.
Austin Strategic Mobility Plan Apr 19, 2010 Program Overview.
WalkSanDiego, created 1998 Move San Diego, created 2004 Merged Staff 18 Board Members $1,040,000 Annual Budget.
SEATTLE LIGHT RAIL STATION AREA PLANNING City of Seattle Station Area Planning in Seattle SEATTLE LIGHT RAIL STATION AREA PLANNING.
Seattle Station Area Planning Milestones & Events Transit-Oriented Development Program Information & Schedule Station Area Atlas Station Area Recommendations.
CBD Curbspace & Multimodal Decision Framework Study Seattle Planning Commission Meghan Shepard, Michael James November 13, 2014.
1 ACCESS to QUALITY CULTURAL, RECREATIONAL, EDUCATIONAL and LEISURE OPPORTUNITIES Collaboratively encourages and supports opportunities to focus on the.
Virginia Street Bus RAPID Transit Extension Presentation to RTC July 17, 2015 Project Purpose Extend RAPID to UNR Improve pedestrian safety & access Create.
Overview of the IT 3 Initiative CONFIDENTIAL Discussion Document September 2008.
Improving Your World. RS&H tradition began in 1941 Employee-owned company Six programs of client-focused services Multi-disciplined team of planners,
Multimodal Corridor Plan BCC Discussion Item Transportation Planning Division August 19, 2014.
Seattle Planning Commission Briefing December 11, 2014 Seattle’s Comprehensive Plan: What it is and why we have it How it’s working What’s new and what.
South/West Corridor Improvements Service and Facility Alternatives September 9, 2014 Planning & Project Development Committee March 3, 2015.
Quality Region Principles The New Visions Plan addresses the region’s quality of life in a number of important ways and provides a framework for improving.
1 Item 11: Review of Draft Bicycle and Pedestrian Plan for the National Capital Region Michael Farrell TPB Staff Presentation to the Transportation Planning.
Land Use Study for the Community of Winchester July 9, 2012.
Association of Metropolitan Planning Organizations.
Mark Phillips BSDA/Metro Long-Range Planner. The Foundation: Moving Transit Forward.
South/West Corridor Transit Improvements PRIMO & ENHANCED AMENITIES PLANNING PHASE September 9, 2014 Planning & Project Development Committee August 11,
A Connected Region for Our Future Tampa Bay Area Regional Transportation Authority.
How Would a Transportation – Land Use Grant Program Work in the Washington Region? Presentation to the Transportation Planning Board Technical Committee.
February 24, “Moving Transit Forward”  A fiscally responsible, community-driven vision for restoring, enhancing, and expanding the Metro Transit.
On the Road to a New Metropolitan Transportation Plan Spokane Regional Health District Board of Health April 25, 2013.
Comprehensive Plan Update Kevin O’Neill Seattle Bicycle Advisory Board September 2, 2015.
Creating the 2040 Regional Transportation Plan. Today’s Presentation Now Developing the Next RTP  Very Early Stages of Development  Website: 2040Plan.org.
Public Open House Thursday, March 19, 2009 TOD Plan & Park-and-Ride Location Study Village of Montgomery, Illinois Public Open House TOD Plan & Park-and-Ride.
Regional Transit Study Project Update. Four open houses held between November , 2009 Informed and engaged the public in the study process Provided.
Planning and Community Development Department Sierra Madre Villa Corridor Public Art Project City Council December 8, 2014.
ACTIVE TRANSPORTATION Saint John. ATSJ VISION A City that supports a high quality of life where calm and friendly streets encourage the connection between.
200/768_K 0 Sustainable Growth & Development Subcommittee Report Committee for a Sustainable Emerald Coast May 17, 2007.
Urban Design and Transportation Creating options and opportunities.
Rainier Avenue South Pilot Project Update Seattle Bicycle Advisory Board Project Manager Jim Curtin September 2, 2015.
Bicycle Advisory Board September 2, 2015 Freight Master Plan.
San Diego Regional Comprehensive Plan Presentation to Senate Transportation and Housing Committee February 8, 2005.
OLDE TOWN ARVADA TOD Update to RTD Board September 3, 2013
Urban Bicycle Networks Throughout Virginia I. Introduction This multimodal investment network is the incorporation of four urban bicycle studies and plans.
Shaping our Future Transportation Transportation trends Influencing trends through land use decisions Alternative futures: Base Case and Scenario Complementary.
EASTSIDE ACTIVITY CENTER DRAFT MASTER PLAN Board of County Commissioners January 22, 2008.
Pinehurst School Traffic Safety Pinehurst School Traffic Safety Meeting May 13-14, 2014.
South/West Corridor Transit Improvements ZARZAMORA AND MILITARY PRIMO BRT PROJECTS ENVIRONMENTAL AND PRELIMINARY DESIGN PHASE September 9, 2014 VIA Community.
Minnesota State Planning Conference September 28, 2011.
Livingston County Transportation Connectivity Plan Final Report December 2013.
The Concept for City Center – The Power of TOD TOD Advisory Committee Meeting 3 December 10, 2009 The Premier Place for a Premier City.
Key Trends Shaping Transportation System Management Operations Timothy Papandreou CIO, Director Office of Innovation San Francisco Municipal Transportation.
DRAFT INNER MELBOURNE ACTION PLAN Presented by Elissa McElroy IMAP Executive Officer January 2016.
C ENTRAL E STUARY P LAN A V ISION F OR O AKLAND’S W ATERFRONT Central Estuary Plan A VISION FOR OAKLAND’S WATERFRONT Specific Plan and Environmental Assessment.
A presentation by Kittelson & Associates, Inc. Broward Boulevard Presentation to the Broward MPO TCC and CIR March 2012 Agenda Item NA-1, Attachment.
COMPREHENSIVE PLAN UPDATE MEETING 2 – TRANSPORTATION ELEMENT 12/12/2013.
Pedestrian Master Plan Update Seattle Planning Commission Michelle Marx, Ian Macek, Kevin O’Neill May 26, 2016.
8 th Ave S 2016 Pedestrian Improvements South Park Neighborhood Association David Allen, Sue Byers, Alisa Arment April 12, 2016.
2035 General Plan Update Planning Commission Study Session on Draft Circulation Element February 2, 2016.
Planning Commission Ian Macek May 26, 2016 Freight Master Plan.
REGIONAL BICYCLE AND PEDESTRIAN PLAN
Photo credit: Wu Wenbin
Project Management Team Meeting #3
One ODOT: Positioned for the Future
San Mateo Countywide Transportation Plan update
Transportation Management Plan Modernization Project
Presentation transcript:

Accessible Mt. Baker Integrated Multimodal Plan Seattle Planning Commission Michael James, SDOT January 8, 2015

SDOT’s mission & vision Mission: delivering a first-rate transportation system for Seattle. Vision: a vibrant Seattle with connected people, places, and products. 2

SDOT’s core principles Keep it safe Focus on the basics Build healthy communities Support a thriving economy Provide great service 3

Background / Study Area 4 North Rainier Neighborhood Plan Southeast Transportation Study McClellan Town Center Development Strategy North Rainier Action Plan Seattle Station Area Transportation Analysis Mt. Baker Urban Design Framework Seattle Mobility Plans Community Voices North Rainier Neighborhood Plan SE Transportation Study McClellan Town Center Development Strategy North Rainier Action Plan Seattle Station Area Transportation Analysis Mt. Baker Urban Design Framework Seattle Mobility Plans Community Voices

Teams 5 Interdepartmental City Team Seattle Dept. of Transportation Dept. of Planning and Development Office of Housing Dept. of Neighborhoods/Public Outreach and Engagement Liaisons Somali, Spanish, Oromo, Tigrinya and Amharic Consultant Team HDR (transportation) Cascadia Consulting Group (outreach)

Project outcomes Identify and develop conceptual designs for pedestrian and bicycle safety improvements Refine an integrated multimodal plan –Operational analysis for all modes –Reconsider the “Bowtie” –How are improvements prioritized and phased? –How can this strengthen community assets and values? 6

Scope Overview 7 Results: Identify short- term solutions; establish med and long-term priorities Results: Advance short-term projects and refine integrated multimodal plan Results: Deliver an integrated implementation plan to move improvements forward Public Event #1 (March) Early public engagement Ongoing public engagement Public Event #2 (June)

The Charrette Week (Dec 15 – 19) Town Center vision offered themes Stakeholder interviews informed ideas Project goal defined direction Guiding principles framed fundamentals Evaluation criteria helped test alternatives Early concepts tested New concepts prepared and evaluated Long-term plan emerged Near-term actions followed

Accessible Mt. Baker goal The outcome is a place where jobs are retained and created. The multi-modal plan prioritizes modes as: Pedestrian, Bicycle, Transit, Freight and Auto. Town Center Vision themes are incorporated. In doing so, Mt Baker becomes a “To Place” rather than a “Through Place”, making it a highly desirable destination. Recognize Mt Baker is the gateway to southeast Seattle, with the intent of creating a place that honors the tradition of compact, walkable, and mixed use communities.

Guiding Principles Integrate transport and land use Create a network of streets, paths and open space Identify and respect known constraints Make a legible and identifiable place Establish the hierarchy of modes as: –Ped/Bike: Safety and comfort –Transit: Reliable and frequent –Freight: Access and geometrics –Auto: Calm and equal throughput Optimize fire and emergency access Apply universal design and promote equity

Long-term Concept Reflects the prioritized modal preferences Restores the traditional urban values Eliminates the confluence of streets Supports redevelopment to the north and conservation to the south Allows the Olmsted Greenway extension Creates the desired destination

Near-term actions Phase 1 Pedestrian safety and comfort improvements Other actions Phase 2 Traffic and transit modifications Mt Baker station enhancements Pedestrian safety and comfort improvements Bicycle safety and comfort improvements

Schedule 13 December 2014: launch study, Charrette #1 January – March: early engagement March: public event #1 April – July: ongoing public engagement June: public event #2 Fall 2015: final report

Questions? | (206)

Early concepts reviewed

17 Bowtie Roundabout

Stakeholder Interview Summaries Pedestrians Bikes Transit – bus and light rail Freight Repurposing Rainier Connectivity Urban design/TOD Economic development/ opportunity sites Unintended consequences Concept feedback Short-term ideas Long-term ideas Other issues

Evaluation Factors In concert with the Guiding Principles, a set of Evaluation Factors was created to guide the overall multi-modal plan. These factors are for the prioritized modes as previously identified. Pedestrian –Crossing distance –Conflict points –Traffic signal cycle length and walk distances –Eliminate push button pedestrian signals –Visibility –Large refuge areas

Evaluation Factors Bicycle –Directness –Conflict minimization –Separation –Bike share –Parking Transit –Reliability - schedule and frequency –Proximity and convenience –Rapid Ride-like features and amenities –Ease of transfer Local transfer (bus to rail) Regional transfer (rail to bus to rail) –On-street stops and layover

Evaluation Factors Freight –Reliable trips for deliveries –Access to properties –Geometrics Autos –Vehicles per lane –V/C ratio –% traffic diversion –Queue length –Travel times –Property and service access