Technical implementation, acceptance issues and the role of human factors in rail freight innovation Carlo Vaghi, Ines Österle, Alberto Milotti Gruppo.

Slides:



Advertisements
Similar presentations
Armand Racine Consultant Chemicals Branch
Advertisements

Operation & Maintenance Engineering Detailed activity description

European Rail Agency Workshop 29 th September 2011 (Lille) Dr Björn Paulsson (UIC) Dr Stephen Ingleton (Newcastle University) REDUCING THE OCCURRENCES.
Proactively Preventing Freight Wagon Derailment Innotrans | Berlin| 18 th September Dr Björn Paulsson (UIC) Grigory Kozyr(UIC) Gordana Vasic (NewRail.
A Joint Research Project funded under the Seventh Framework Programme (FP7) of the European Commission WP 1: Specification and evaluation.
Course: e-Governance Project Lifecycle Day 1
Focusing on Life Cycle Cost (LCC) and Life Cycle Assessment (LCA) in GPP Green Public Procurement (GPP) - Lead the change National Conference George Jadoun,
Mike Roney Past Chairman – International Heavy Haul Association Excellence in Heavy Haul Railroading: Highlights and Lessons Learned from IHHA2011 October.
Koos Kunneke – MMIS Analyst Corne Engelbrecht – Maintenance Engineer Advance Asset Condition Assesment.
UGDIE PROJECT MEETING Bled September WP6 – Assessment and Evaluation Evaluation Planning  Draft Evaluation plan.
Unit Slides by UK Versity.  Unit aims:  This unit aims to help the learner with an opportunity to develop their project management and research skills.
Predictive Maintenance: Condition monitoring Tools and Systems for asset management September 19, 2007.
EVALUATION AND QUALITY ASSURANCE STRATEGY PRESENTED BY DR SHYAM PATIAR.
HEAVY AXLE LOADS ON SHORT LINES AND REGIONAL RAILROADS Georgia Railroad Association 5 th Annual Transportation Conference 5 th Annual Transportation Conference.
Division of Operation and Maintenance Engineering Division of Operation and Maintenance Engineering 1 Reliability Analysis of Switches and Crossings –
DISSEMINATION / VALORISATION PLAN AND ACTIVITIES PRESENTED BY DR SHYAM PATIAR.
Infrastrucure presentation VZNERRAC PLENARY 11 Railway Infrastructure for the Twenty First Century John Amoore Network Rail and ERRAC.
Managing a Training Program Why train? Who will attend the training? What are the learning objectives? Strategies? Coverage? How will the training program.
Managing Fast – Tracked Projects: A Review of ECI Report Dr
The variable cost approach to pricing John Thomas Deputy Director, Economic Regulation Office of Rail Regulation, UK 9 July 2004.
ROAD TRANSPORT RESEARCH, TECHNOLOGICAL DEVELOPMENT AND INTEGRATION (2003 Call)
Engaging with stakeholders: Adding value to the energy system 32nd Annual Conference of the International Association for Impact Assessment Porto Pedro.
Envisioned Role for NTI Concerning ITS Deployment in Egypt by Dr. Mahmoud EL-HADIDI Professor of Telecommunications at Cairo U & Consultant at NTI 3 rd.
18 September Licensing for Next Generation Signalling Buddhadev Dutta Chowdhury 27 th April 2012.
IRSN STRATEGY TO ASSESS A NEW MAINTENANCE POLICY / Nesebar, Bulgaria Presented by Naoëlle MATAHRI, IRSN.
Common framework Guidelines for Pilot Actions Debrecen 2013 Municipality of Debrecen Department of Sociology University of Debrecen External expert.
Technologická platforma "Interoperabilita železniční infrastruktury" a zaměření její činnosti v dalším období Praha, Jozef Fazik, Chargé de Mission.
LCC and RAMS Based Track Work Technology for the Economical Benefit of High Speed Railways Girsch 1 Milano November 8, 2005 Presented by: Heinz OSSBERGER.
Vicenç Pedret Cuscó Economic Adviser European Commission – DG MOVE Future of the European Transport Policy and Green Corridors Presentation at: TransBaltic.
© 2006 Cisco Systems, Inc. All rights reserved.Cisco Public 1 Version 4.0 Gathering Network Requirements Designing and Supporting Computer Networks – Chapter.
1 Designing Effective Programs: –Introduction to Program Design Steps –Organizational Strategic Planning –Approaches and Models –Evaluation, scheduling,
AUTOMAIN Overview of the project Henri Olink Automain Dissemination session Paris, October 4 th 2012.
Life cycle services for automation products
Capacity and Service to Road Users Task 05: To optimise the capacity of the road network Mike Wilson, Bristol 27 January 2006.
European Railway Safety Strategy EIM Safety Group (PhGALLEY and J-Å HALLDEN) 29 september 2009.
Transport The new TEN-T guidelines Results of the legislative procedure Philippe Chantraine (MOVE B1), 24 June 2013.
Injury Prevention and Injury Management A system of processes that targets workplace physical injury reduction.
IC&IC eLearning solutions Bucarest, 2 September 2010.
TMALL 0141 Presentation v 1.0 Asset Management Bo Olsson Bucharest October 7th, 2015.
Athens, Conference Hall, Ministry of Infrastructure, Transport and Networks, 5&6 November 2015 INVESTIGATION OF THE DEGREE OF IMPLEMENTATION OF THE INTERNATIONAL.
Workplace injuries are at least a 50 Billion dollar problem in Australia. Work Safe Australia.
C4Freight. Freight Transport Corridors  Objective Demonstrate on key pan-European corridors innovative transport technologies, systems and strategies.
SCATS Congestion Improvement Program. The Scope of the SCATS Congestion Improvement Program.
DESTination RAIL Decision Support Tool for Rail Infrastructure EU Project No Railway Pro Investment Summit Building the New CEE Railway Economy.
Equipment Life Optimization Program (ELOP) Doug Hilleman February 10, 2011.
HIGH SPEED RAIL ASSESSMENT NORGE
JOB MODULE for FRONT COVER PROCONSTR IMPROVING VOCATIONAL EDUCATION IN THE CONSTRUCTION INDUSTRY SECTOR WITH THE AIM OF IDENTIFICATION AND RECOGNITION.
Freight Railway Integration Strategy For Inter-American Development Bank Transport Week 2009 by Transportation Technology Center, Inc. (TTCI) Subsidiary.
Low Impact Light Rail Update. Forward plan: All contracts to be signed up by end of August All feasibility to be completed by end of 2014/14 financial.
BUDAPEST DANUBE CONTACT POINT: an innovative tool to support the implementation of the Danube Strategy David Pelech Budapest Danube Contact Point 6 th.
Virtual Track Surveying Paul Furniss. An introduction to Omnicom Engineering A few words from Gary Sanford the UK Sponsor What is the OmniSurveyor3D System?
Road Investment Decision Framework
SIMONA MURRONI Bruxelles - June 27th 2013 Bridging lessons learned from the past with new planning and delivery approaches in the energy sector.
The achievements of Rail CRC
Today´s Challenges of the Rail Infrastructure Industry
Sustainable maintenance of high-speed lines with mixed traffic
Continuous Delivery- Complete Guide
European Rail Infrastructure Managers
Presented by Jon Pastuszynski, Lead M&D Engineer
Workshop on freight train derailments - Introduction -
Maintenance Strategies for Turnouts
Increasing Asset Lifecycle through the application of Innovative Technology
Gabriele Grea, Ines Österle, Carlo Vaghi Gruppo CLAS S.p.A.
Across the entire value chain
Closed Loop Wind Farm Control
Rob Cotterill & Helen Jones DNV Consulting, UK
Helene Skikos DG Education and Culture
The AEOLIX project & Living Lab 12
Presentation transcript:

Technical implementation, acceptance issues and the role of human factors in rail freight innovation Carlo Vaghi, Ines Österle, Alberto Milotti Gruppo CLAS Milano XV Conference of the Italian Association of Transport Economics and Logistics (SIET) Venice - September 18-20, 2013

Legal information SUSTRAIL

Legal information SUSTRAIL at a glance Title: The sustainable freight railway: Designing the freight vehicle – track system for higher delivered tonnage with improved availability at reduced cost Aim: To improve sustainability, competiveness and availability of railway freight, taking a whole system approach to vehicle and track degradation to allow freight to run at near line speed, with less impact on the infrastructure. Référence / date 3

Legal information Partnership Geographic distribution 29 partners from 13 countries

Legal information Approach and objectives SUSTRAIL provides the approach, structure, and technical content to improve Sustainability Competiveness Availability of European railway networks in order to regain market. This will be achieved by: Integrated and holistic approach: innovations of vehicles + infrastructure Demonstration on three real routes (UK, Spain, Bulgaria) Référence / date 5

Legal information Duty requirements for SUSTRAIL innovations Référence / date 6 Priority Level Duty Requirements for Improvement System High Modest increase in freight speed (e.g kph UK; kph ES, BG) whole Optimise axle load limits (22.5 t/25 t / t) whole (20%) reduction in energy used by rail vehicles - Vehicle Green Label vehicle Improve bogie design to reduce lateral forces (by 50%) vehicle

Legal information Key vehicle innovations 39 vehicle innovations have been selected and will be developed, covering the principle components of the vehicle, namely: Suspension and running gear: optimised bogie design to reduce damage to track and vehicle. Traction and breaking: for high speed train operations Body and bogie structures: novel designs and materials (focus on novel steels applications) to provide lightweight vehicles with improved aerodynamics, flexible payload handling and low maintenance requirements. Condition monitoring focused on axle monitoring and energy harvesting for to detect cracks in their early stage and prevent crack propagation. Référence / date 7

Legal information Key vehicle innovations The Y25 freight bogie Référence / date 8

Legal information Key track innovations Aims to reduce deterioration of track and wheels through increasing the resistance of the track to the loads imposed on it by vehicles, to optimize maintenance activities to increase performance over the life-cycle of the railway Research activities draw on results achieved by EC projects Innotrack and Sustainable Bridges Process of selecting innovations terminates in October 2013 Référence / date 9

Legal information Key track innovations Track innovations in the areas of Switches and crossings, rail material, track stiffness, track forces and degradation, possession planning, and inspection and prediction Track innovations include (1) Premium rail steels: to increase rail life; to reduce wear and damage and maintain better profiles to reduce the risk of derailment Track stiffness monitoring: modification of existing (falling weight deflectometer) equipment to increase productivity of track stiffness measurements; automated track stiffness measurement New fastenings: to increase resistance to track geometry deterioration New measurement technologies: different automated inspection technologies placed in trains and wayside Référence / date 10

Legal information Key track innovations Selected vehicle and track innovations will be evaluated according to Life Cycle Costs RAMS (Reliability, Availability, Maintainability, Safety) Environmental benefits User benefits Human factors issues to identify the most promising ones and guide the research activities of technology development. Référence / date 11

Legal information Human factors implications from SUSTRAIL innovations

Legal information Human factors implications from SUSTRAIL innovations Motivation Railway system is a socio-technical system with people central to all rail activities Engineering and operations improvements can only be achieved through the understanding and integration of the key rail human factors (Wilson et al., 2007) Definition of rail human factors Scientific discipline concerned with the understanding of interactions between humans and the railway system and among humans within the system with the objective to optimize safety and overall performance of the rail system and human well-being. (Hammerl et al., 2008) Référence / date 13

Legal information Human factors implications from SUSTRAIL innovations Objectives in the context of SUSTRAIL include the identification of maintenance tasks affected, implications for maintenance activity planning, changes in (staff and system) safety, changes in workload (accessibility and working conditions), new skills required, training activities required, opportunities for automation of activities which should reduce Life Cycle Costs, phasing issues. 14

Legal information Human factors implications from SUSTRAIL innovations Scope High-level assessment: innovations in course of selection and development; at the time of the research the implications of innovations have not been known (e.g. how they affect possessions, speed of trains, ability to run uninterrupted). Human factors analysis will continue until August 2014 Référence / date 15

Legal information Human factors implications from SUSTRAIL innovations Methodology Consultation of representatives of major rail freight stakeholders: Network Rail (UK), National Railway Infrastructure Company (BG), UNIFE, Societatea Comerciala de intretinere si reparatii vagoane de calatori (RO). Telephone interviews (in one case via ): questionnaire containing 11 main questions. Questionnaire captures implications from single innovations as well as whole package of SUSTRAIL innovations. Référence / date 16

Legal information Human factors implications from SUSTRAIL innovations Results Introductory remarks some experts found themselves not in the position to express a definite judgement provide basis for in-depth human factors analysis, scheduled for February 2014 provide useful insights regarding main implications of SUSTRAIL innovations Référence / date 17

Legal information Human factors implications from SUSTRAIL innovations Maintenance Référence / date 18 Terms of change Maintenance tasks identified (track) Frequency AutomationCosts Rail replacement-=- Ballast screening (cleaning)-=- Tamping-=- Grinding-- Sleepers and fastenings repairs and replacement -=- Switches and crossings repair-+- Stress neutralization of continued welded track =+-

Legal information Human factors implications from SUSTRAIL innovations Inspection Référence / date 19 Identified terms of changes (track inspections) SUSTRAIL innovations (overall) Premium rail steels Rail track recognition Track stiffness monitoring Quality and automation + ++ Frequency--+ Manual labour- -- Costs per inspection- -- Maintenance strategy From reactive to predictive maintenance Terms of changes (vehicle inspections) Time per inspection (SIRV) - Personnel need (SIRV)-

Legal information Human factors implications from SUSTRAIL innovations Effects on staff working conditions Changes mainly triggered by automated inspection systems Improvement of overall working conditions for track maintenance staff. Improvement in terms of a decrease in heavy manual labour, reduced use of vibrating tools, decreased hot/cold conditions and dangerous locations Référence / date 20

Legal information Human factors implications from SUSTRAIL innovations New skills and training required Référence / date 21 SUSTRAIL innovations (overall) Increase in engineer, IT and technical skills; decrease in low-qualified personnel Premium railNew grinding machine is needed or old one needs to be adapted to take into account the stronger and harder rail to be worked Rail track recognitionReduction in handling of maintenance tools and machinery; Need of new skills to use software that elaborates data from the track sensor innovation. Need for understanding and interpreting these data to organise maintenance team. Track stiffness monitoring Reduction in handling of maintenance tools and machinery New fasteningsRequire the use of new tools and machinery and also new handling New measurement technologies Require new tools and machinery Use of Linear Asset Display System (LADS) Implicates implementation of new GPS and interface system on track maintenance and inspection machinery and hence new skills

Legal information Human factors implications from SUSTRAIL innovations Operations planning Triggered by the innovations, operations are affected due to several changes, including: increased operational speed increased traffic capacity decreased traffic breaks due to maintenance works But, detailed implications still not quantified Référence / date 22

Legal information Human factors implications from SUSTRAIL innovations Safety System safety: improved Maintenance staff safety: improved Référence / date 23

Legal information Human factors implications from SUSTRAIL innovations Phasing issues Higher initial investment costs, but lower LCC. Not in line with short-term investment planning strategy. Social conflicts because of decreasing need of low qualified staff. Environmental issues linked to the problem of recycling novel railway materials. Référence / date 24

Legal information Human factors implications from SUSTRAIL innovations Main results and conclusions: Human factors implications are numerous Successful implementation of rail and track innovations require the consideration of human factors New skills required increase of personnel with engineering, IT and technical skills decrease of low qualified staff Maintenance tasks changed Automation due to introduction of sensor-based monitoring Change from reactive to predictive maintenance regime Maintenance and inspection costs decrease (trigger lower Life Cycle Cost of SUSTRAIL innovations) Increase of system and staff safety become evident Référence / date 25

Legal information Thank you for your attention! Contact details Ines Österle Carlo Vaghi Alberto Milotti Référence / date 26