21-12-0014-00-0000-IEEE802-EC_Interim_Teleconference_Report.ppt IEEE 802 EC Interim Teleconference Report from 802.21 on two Sponsor Ballot Completions.

Slides:



Advertisements
Similar presentations
Doc.: /04 Submission August 2010 D. Stanley (Aruba), B.Kraemer (Marvell) Slide 1 P802.11REVmb Report to EC on meeting the terms of Conditional.
Advertisements

802.16m Closing Report November 11, 2010 Dallas, Tx Session # IEEE m-10/0035.
P802.16q to Sponsor Ballot: Conditional Approval Request 17 July 2014 IEEE Gdoc.
EC Closing Slides and Motions November 2009 Atlanta, GA.
Doc.: IEEE /0677r0 Submission May 2015 Slide 1 IEEE ah Closing Report for May 2015 Date: Authors: Yongho Seok (NEWRACOM)
Page 1Version 2.1 Request for conditional approval Information required to support request for conditional approval to forward a draft standard IEEE 802.
WG_Session_42_Closing_Plenary_report January 2011 IEEE Session #42 Taipei, Taiwan Closing Plenary Subir Das
Session#64-Closing_Plenary_Notes.ppt Subir Das, Chair WG Subir Das sdas at appcomsci dot com IEEE Session #64, Athens,
Doc.: IEEE /011 Submission January 2000 Al Petrick, ParkerVision TGd IEEE – TGd Jan 10 –15, 2000 Tel Aviv, Israel.
Doc.: IEEE 802 EC-12/0004r1 Agenda February 2012 Jon Rosdahl, CSRSlide 1 IEEE 802 EC Interim Telecon – Feb Date: Authors:
Doc.: Submission1 IEEE Motions in July Plenary DCN: Title: Request for Sponsor Ballot Approval for IEEE a.
Doc.: IEEE /0144r01 Submission February 2015 Apurva N. Mody, BAE SystemsSlide 1 IEEE Motion at the February EC Telecon IEEE P Wireless.
Doc.: IEEE /0054r0 Submission March 2013 Mika Kasslin, NokiaSlide 1 TG1 Closing Report for March 2013 Notice: This document has been prepared.
Session#65-Closing_Plenary_Notes.ppt Subir Das, Chair WG Subir Das sdas at appcomsci dot com IEEE Session #65, San Antonio,
Doc.: IEEE /0792r0 Submission July 2008 Adrian Stephens, Intel CorporationSlide TGn Editor Report July 2008 Date: Authors:
Session#72-Closing_Plenary_Notes.ppt Subir Das, Chair WG Subir Das sdas at appcomsci dot com IEEE Session #72, Atlanta,
How to change a Sponsor ballot vote in myProject Sponsor Ballot – Vote Change Updated : 2 September 2011.
20 July 2007IEEE Closing EC Items1 Robert M. Grow Chair, IEEE Working Group
Doc.: IEEE /0023r00 SubmissionApurva N. Mody, BAE SystemsSlide 1 IEEE Motion at the July EC Closing Meeting IEEE P Wireless RANs.
Month Year IEEE Motions in July, 2016 Plenary
Month Year IEEE Motions in July, 2017 Plenary
November 2008 doc.: IEEE /1437r1 July 2011
IEEE 1914 NGFI IEEE RoE TF Opening Report
P802.11s Report to EC on Conditional Approval to go to Sponsor Ballot
P802.11s Report to EC on Conditional Approval to go to Sponsor Ballot
P b Status Sponsor balloting completed:
doc.: IEEE /xxxr0 Subir Das sdas at appcomsci dot com
P802.11z conditional approval report to ExCom
P802.16Rev4 to Sponsor Ballot: Conditional Approval Request
Steve Shellhammer Chair
IEEE Motions at the November Plenary EC Meeting
Motion IEEE Standards withdrawals to RevCom
IEEE Motions in July Plenary DCN:
November 2010 doc.: IEEE /0872r4 November 2010
<month year> doc.: IEEE < e> <September 2018>
Motion – P Rev/D2 to Sponsor Ballot
802.16m Opening (Final) Report
TGi Final Report for the March 2004 Session
TGs LA Closing Report Date: Author: January 2011
<month year> doc.: IEEE < e> <November 2018>
Closing IEEE 802 EC Friday 15th March 2019
IEEE Motion at the July EC Closing Meeting
Closing IEEE 802 EC Friday 15th March 2019
Closing IEEE 802 EC Friday 15th March 2019
November 2010 doc.: IEEE /0800r9 November 2010
IEEE P Working Group for Wireless Personal Area Networks
November 2008 doc.: IEEE /1437r1 August 2010
802.11e Vancouver Report January 16,2004 January 15, 2004
Motion #1: TGaq EC Report
TGn Closing Report Vancouver, BC, Canada 802 Plenary
TGak November Closing Report
March x D2 to RevCom Bob Heile, Decawave.
TGn Editor Report Sept 2008 Date: Authors:
Motion via Ballot IEEE motion Motion for Approval to Start the Sponsor Ballot for IEEE P Revision Draft 5.0 Motion via Ballot.
Motion via Ballot Motion for Approval to Start the Sponsor Ballot for IEEE P Revision Draft 5.0 Motion via Ballot Motion Start: May.
Motion – P Rev/D2 to Sponsor Ballot
November 2010 doc.: IEEE /0800r9 November 2011
<month year> doc.: IEEE < e> <November 2018>
P b to RevCom: Conditional Approval Request
November 11, 2010 Dallas, Tx Session #70
Sheung Li Task Group J Chairperson March 19, 2004
TGg Report to the IEEE Working Group
802.1 consent agenda items for LMSC Closing Plenary
November 8, 2010 Dallas, Tx Session #70
EC Closing Report on Rules
802.1 Motions for EC consent agenda, including supporting material
P802.16Rev4 to Sponsor Ballot: Conditional Approval Request
P802.11j Sponsor Ballot Procedure 10
802.1 Motions for EC consent agenda, including supporting material
802.1 consent agenda items for LMSC Closing Plenary
Presentation transcript:

IEEE802-EC_Interim_Teleconference_Report.ppt IEEE 802 EC Interim Teleconference Report from on two Sponsor Ballot Completions Subir Das Subir at appcomsci dot com Subir Das, Chair WG

IEEE802-EC_Interim_Teleconference_Report.ppt Background During the November 2011 closing plenary the IEEE 802 EC granted conditional approval for the IEEE802.21a and IEEE802.21b drafts to proceed to RevCom Full details of EC presentation are available at: details-and-motions a.pptx, and results-and-motions b.pptx details-and-motions a.pptx results-and-motions b.pptx Subir Das, Chair WGFeb 2012

IEEE802-EC_Interim_Teleconference_Report.ppt Sponsor Ballot Update The Ballot closed on December 08, 2011 The recirculation comments (editorial) are available at: 21a-comments.xls, and b-comments.xls 21a-comments.xlshttps://mentor.ieee.org/802.21/dcn/11/ sb-recirc b-comments.xls The comments associated with remaining disapproves and the WG responses are available at: – comments.xls and comments.xlshttps://mentor.ieee.org/802.21/dcn/11/ sec a-sb- comments.xlshttps://mentor.ieee.org/802.21/dcn/11/ bcst b-sb- comments.xls Feb 2012 Subir Das, Chair WG

IEEE802-EC_Interim_Teleconference_Report.ppt Conditional Terms and Results As per LMSC OM Clause 14: - The Ballot occurred, in accordance with the tentative schedule presented to the EC.The recirculation running at the time conditional approval was granted completed on schedule. The additional recirculation shown on the plan is not required –The approval percentage is 98% for IEEE a (63 Approve, 1 Disapprove). –The approval percentage is 96% for IEEE b (60 Approve, 2 Disapprove). - There are no new DISAPPROVE votes No new valid DISAPPROVE comments on new issues that are not resolved to the satisfaction of the submitter from existing DISAPPROVE voters - During the last recirculation of IEEE a, we received an APPROVE vote from one DISAPPROVE voter - No new DISAPPROVE comments were received for IEEE802.21a and IEEE802.21b Subir Das, Chair WGFeb 2012

IEEE802-EC_Interim_Teleconference_Report.ppt Conclusion Based upon the results of the WG recirculation ballots on P802.21a/D6.0 and P802.21b/D6.0, the terms of the conditional approval have been met An was sent to EC reflector on December 09, 2011 IEEE802.21a and IEEE802.21b drafts are in RevCom’s March meeting agenda Subir Das, Chair WGFeb 2012