Detect and identify Radiometric Level Measurement in Coke Chambers.

Slides:



Advertisements
Similar presentations
Singapore Polytechnic Singapore Maritime Academy & Maritime Institute Of William Barentsz Bachelor Degree in Maritime Operations (BMO) Diesel Technology.
Advertisements

MEASURING THE MOVEMENT OF MOLECULES
CONTROLS OF SUPER CRITICAL BOILERS
CO2 CascadeComp_Studi Galileo  1 Semi-Hermetic Compressors for CO 2 Cascade Systems Hermann Renz Bitzer Kuehlmaschinenbau GmbH  Germany.
HEATING AIR © Commonwealth of Australia 2010 | Licensed under AEShareNet Share and Return licence.
Unit 206: Domestic hot water systems
Unit: Oxy-Acetylene- Welding, Brazing, Cutting and Heating
Objective of the session.
Jet Engine Design Idealized air-standard Brayton cycle
Department of Mechanical Engineering ME 322 – Mechanical Engineering Thermodynamics Lect 27b Jet Aircraft Propulsion.
Manifolds. Intake Manifolds Construction Cast iron Cast aluminum Plastic Composite aluminum.
IAPG Natural Gas Congress Molecular Sieves:is your regeneration procedure optimized? CECA – VETEK Author Peter Meyer Presenter Bob Davenport.
NTU-Earthlink Solar Innovations 2004 : Re.Fuse The Challenge: Design a mechanism that is able to separate waste into different categories (paper,metal,glass.
1B-1 Fire Engine Maintenance Unit 1B – Pump Inspections and Maintenance.
Engineer Presentation
WEDNESDAY’S WARM UP SPIRAL REVIEW December 4. Which of these is the best conductor of electricity? A Glass rod B Cotton string C Plastic tubing D Copper.
Catalytic cracking Catalytic cracking
Neutrino Factory Mercury Flow Loop V. Graves C. Caldwell IDS-NF Videoconference March 9, 2010.
Mercury Chamber Considerations V. Graves IDS-NF Target Studies July 2011.
COMMERCIAL REFRIGERATION
STEAM HEATING.
Hydronic Mechanical Controls
It’s a refrigerator... Your argument is invalid- James Yoo.
Gas Furnace Planned Maintenance
Welcome to KALLER International Distributors Meeting June 14-16, 2011 Workshop 7 • Delayed return units.
Plan 2 – Dead-end Seal Chamber Optional Jacket
                    P&ID: Tutorial 1
CXS490 Carbon Dioxide Systems
Refinery Processes Muhammad Fahad Ansari.
Understanding Thermal Energy and Heat Transfer
Fluid Dynamics of Combustion System for Diesel Engines P M V Subbarao Professor Mechanical Engineering Department Use of Fluid Dynamics to Design Matured.
Solubility.
KNUDSEN PUMP. WHAT IS IT? Vacuum pump Principal of thermal transpiration temperature gradient causing the gas molecules to move from one side of the tube.
Solids, Liquids and Gases Use of Graphic Organizers
One Minute Paper Statics; reply. Fluid dynamics  Fluids in motion Pumps Fans Compressors Turbines Heat exchangers.
Variable Speed Applied to Pumps. Life Cycle Costs - Courtesy of Hydraulic Institute and Europump Initial cost is not the only cost associated with a pump.
Unit 8 Gas-Burning Equipment. OBJECTIVES State the difference between a natural gas and an LP gas system. Describe several control sequences for gas heat.
Can be observed and measured without changing the kind of matter being studied.
1 ME444 ENGINEERING PIPING SYSTEM DESIGN CHAPTER 6 : PUMPS.
Boiling, Freezing, and Melting Water
Examples-Colligative Properties. Example Rubbing alcohol is a solution of 50% C 2 H 5 OH and water. Would you expect rubbing alcohol to conduct electricity?
ENGINEERING THERMODYNAMICS Dr. M.R.SWAMINATHAN Assistant Professor Internal Combustion Engineering Division Department of Mechanical Engineering ANNA UNIVERSITY.
Phase Changes Slide Show #2. Skip #1 & #2 We’ll get to these later.
Bernoulli Equation – Pitot tube  Horizontal  Velocity at stagnation point is 0  Incompressible fluid  Steady state  Velocity as function of pressure.
Physical Science Heat and Matter. Matter Anything that occupies space and has mass Ex. Air Law of Conservation of Matter Matter is neither created or.
“ The Solution to Future Fuel”. The Fischer Cats Ali Al Musabeh Auto-Thermal Reactor Specialist Faraj Almarri Auto-Thermal Reactor Specialist Mohammed.
ME444 ENGINEERING PIPING SYSTEM DESIGN CHAPTER 11: STEAM PIPING SYSTEM (1)
R E F I N I N G F U N D A M E N T A L S.
Boiler Safety Valve Regulations
TEMPERATURE. Background Galileo invented the first device for measuring temperature in Called thermometer because thermo means heat, and meter means.
Heat Transfer and Refrigeration Cycle
Unit 13 Oil-Burning Equipment
Heat Transfer and Refrigeration Cycle
ARAC/H/F Air-cooled water chillers, free-cooling chillers and heat pumps Range: kW.
Introduction to JUII⊕Series Machine.
Science STAAR Considerations
High Pressure Water Jetting
Boiling, Freezing, and Melting Water
DEMAND COOLING Copeland Discus Demand Cooling
Introduction to Crude Oil Distillation
Rajan Bhandari Senior Lecturer
Leak Detection Service Primarily Leak Detection is a method to find, repair and mould the leak of a pipeline. with present technology pipe.
Separation Techniques
Jet Aircraft Propulsion
FIRE SUPPRESSION SYSTEM.
Boiler Safety Valve Regulations
P2 25 mm (1") Metal Pump.
Boiling, Freezing, and Melting Water
Presentation transcript:

detect and identify Radiometric Level Measurement in Coke Chambers

Process Control 2 Conditions in the coke chamber  Diameter of Coker approx 7m, height approx 20m  Temperature up to 430 degrees Celsius  Pressure up to 22 bar during cracking process and up to 300 bar water jet during dicharging process  Critical product properties of residues  Extraordinary mechanical strain during discharging process

Process Control 3 Requirement on Level Measurement  Non contact measurement system  Reliable measurement system  Safe measurement system  Proven measurement system  Radiometric Level Measurement from Berthold Technologies is the solution

Process Control 4 Process in the Coke Chamber  Hot residual is filled from the bottom  Coker is heated up to 430 degrees Celsius  Pressure drops from 22 bar to 4 bar  Heavy fuels are separated into low and high boiling components  Light components are drained off via a nozzle on the top

Process Control 5 Process Requirement  Fast filling cycle of the Coker required for economical reasons  Filling process is restricted by foam formation  Optimization of filling and discharging process in coke chamber

Process Control 6 Process Optimization  Optimization of filling and discharging process by continuous level measurement  Control of foam level by controlled injection of anti-foam agent  Additional safety feature by max level switch

Process Control 7 Measuring Tasks  Continuous Level Measurement  Measurement of the total level coke/oil/foam-content with radiometric measurement system  Indirect measurement of the foam level by observing and analysing rising speed of the level  Detection of Maximum Level  Radiometric level switch below process gas stub pipe

Process Control 8 The Filling Process Start of continuous level measurement

Process Control 9 The Filling Process Foam level rises

Process Control 10 The Filling Process Anti foam agent is added

Process Control 11 The Filling Process Continuous level measurement

Process Control 12 The Filling Process Foam level rises

Process Control 13 The Filling Process Anti foam agent is added

Process Control 14 The Filling Process Continuous level measurement

Process Control 15 The Filling Process Foam level rises

Process Control 16 The Filling Process Anti foam agent is added

Process Control 17 The Filling Process Continuous level measurement

Process Control 18 The Filling Process Foam level rises

Process Control 19 The Filling Process Anti foam agent is added

Process Control 20 The Filling Process Continuous level measurement

Process Control 21 The Filling Process Foam level rises

Process Control 22 The Filling Process Anti foam agent is added

Process Control 23 The Filling Process Continuous level measurement

Process Control 24 The Filling Process Foam level rises

Process Control 25 The Filling Process Anti foam agent is added

Process Control 26 The Filling Process Continuous level measurement

Process Control 27 Measurement System for Level Measurement in Coke Chamber  Continuous level measurement  LB 440 control unit master and slave  Rod detectors LB4405 in cascade  Point source in shielding Typ 100/150/200  Level Switch  LB 441 control unit  Point source in shielding LB7440/7442/7444

Process Control 28 Benefits  Filling and discharging process can be optimized by continuous level measurement  Safes money and time  Indirect determination of foam level is possible  Injection of anti-foam agent can be controlled, safes money  Overflow detection by max level switch  Safety of process