29 November 2006 3rd ProActive and GCM User Group & ETSI TC GRID 1 ETSI TC GRID presented to 3rd ProActive and GCM User Group 29 November 2006 Sophia Antipolis.

Slides:



Advertisements
Similar presentations
Analysing and testing -
Advertisements

World Class Standards OGF20 OGF-ETSI MoU BoF and ETSI GRID STF 2007 call for expert Introduction to 11th May OGF-ETSI Grid testing workshop and ETSI TC.
World Class Standards IMS Interoperability Testing - from Standards to Practice Giulio Maggiore ETSI TC INT Chairman © ETSI All rights reserved.
Mike Fisher, ETSI TC CLOUD Chairman ETSI TC GRID / CLOUD.
1 Achieving Technical Interoperability - the ETSI Approach Hans van der Veer ETSI Board Interoperability Champion.
World Class Standards Recommended Improvements to The ETSI Standards Engineering Process Hans van der Veer Chair OCG-IOP & Steve Randall STF308 OCG#32,
TELECOM ITALIA GROUP ETSI Workshop on Standards & Interoperability in ICT ETPs Sophia Antipolis, France, October 2006 | Giovanni Romano | Technology.
1 Why ETSI is the place to bridge EU and LA initiatives on e-administration Francisco Da Silva Chairman of the Kick Off Meeting Sophia Antipolis,
GGF#17 - Tokyo - 12 May ETSI GRID BoF Friday 12 May – GGF#17 Tokyo
GRID-Workshop 24 May ETSI GRID-WORKSHOP 24 May 2006 Introduction Karl Heinz Rosenbrock ETSI Director General.
1 ETSI Plugtests The interoperability service Interop Events & Open Source Products 16 December Patrick GUILLEMIN ETSI Plugtests Technical Coordinator.
Issued by Iskratel; All rights reserved OBR70121a NGN Interoperability multi-site testbed infrastructure Info day – Call5, SO 2.5.6: Testbed infrastructure.
1 European Standardisation and the Identification of ICT Technical Specifications 13th XBRL Europe Day Rome, 6 May 2014 Antonio Conte, Project Manager.
Tetra WC_13 Dec TETRA World Congress 2001 Nice Acropolis, December ETSI & TETRA MoU: the Winning Combination for the PMR Market Karl Heinz.
Summary of ETSI/ESI activities Andrea Caccia ETSI/ESI TB member Note: This document expresses only the views of its author.
Halifax, 31 Oct – 3 Nov 2011ICT Accessibility For All ETSI Standardization Activities on M2M communications Joachim Koss, ETSI Board Member Document No:
ETSI/B61(07)19 RFID Strategic Topic Update What is new? Kirit Lathia Patrick Guillemin Board#61 Doc: ETSI/B61(07)19 Agenda item: 6.4 Document for: Discussion.
AIMS Workshop Heidelberg, 9-11 March /20 A Telecom and IP Project from ETSI Gerald Meyer
CCSA REPORT Zemin YANG, Secretary General GSC-18 Meeting, July 2014, Sophia Antipolis, France Document No: GSC(14)18_013 Source: China Communications.
1 ETSI Plugtests  The interoperability Kick-off Meeting The acid test: Testing Interoperability 31 March - Patrick GUILLEMIN ETSI Plugtests.
Geneva, Switzerland, 4 December 2014 ITU-T Study Group 17 activities in the context of digital financial services and inclusion: Security and Identity.
GLOBAL ICT STANDARDISATION FORUM FOR INDIA (GISFI) Prof. Dr. Ramjee Prasad, CTiF, Aalborg University Fellow IEEE, FIET, FIETE, FWWRF - Founding Chairman,
European Union Agency for Network and Information Security Follow ENISA: ENISA and standards Sławomir Górniak European Union Agency.
OneM2M Draft proposal for slide set. This is not intended to be a oneM2M presentation. It is a collection of source material slides which can be used.
World Class Standards © ETSI 2007 All rights reserved ETSI Tomorrow’s World Today.
European Regulatory Environment (just a part!) Mark Thomas, ECO Director CEPT Workshop on European Spectrum Management and Numbering 4 th June 2014.
27/08/2015 Intelligent Transport Services ETSI activities 1GSC-9, Seoul SOURCE:ETSI (ERM TG#37) TITLE:Intelligent Transport Services – ETSI activities.
DOCUMENT #:GSC15-GTSC-05 FOR:Presentation SOURCE:ITU-T AGENDA ITEM:4.1 NGN, Testing specification and Beyond Chaesub.
MTM’99 Workshop Heidelberg, 25 February 1999 The Status of UMTS Josef Noll, Telenor AS
DOCUMENT #:GSC15-PLEN-48 FOR:Presentation SOURCE: ATIS AGENDA ITEM: PLEN 6.10 CONTACT(S): James McEachern
ATIS & TISPAN JOINT MEETING ON NGN Washington D.C., 1 April 2005 MEETING SUMMARY Draft v2 (4 April 2005) Based on Notes from David Boswarthick (ETSI),
DOCUMENT #:GSC15-CL-04 FOR:Presentation SOURCE:CCSA AGENDA ITEM:Closing Plenary, 2.3 GTSC-8 Summary Report Duo Liu GTSC-8.
DOCUMENT #:GSC15-PLEN-53 FOR:Presentation SOURCE:ETSI AGENDA ITEM:PLEN 6.11 CONTACT(S):Emmanuel Darmois, Board Member Marylin Arndt, TC M2M chair Smart.
World Class Standards CCIF New York - April Grids, Clouds and Service Infrastructures ETSI Strategy & New Initiatives.
Halifax, 31 Oct – 3 Nov 2011ICT Accessibility For All IPTV in ETSI Bruno Chatras, ETSI TC TISPAN Vice-Chairman Document No: GSC16-PLEN-09 Source: ETSI.
ITU Regional Standardization Forum for Americas (Washington D.C., United States, 21 September 2015) The CITEL Standards Coordination Role in Bridging the.
Interoperability gap analysis - ETSI initiatives on gap analysis for interoperability in Grids Julian Gallop ETSI Specialist Task Force 331 on ICT Grid.
TTA-ARIB/TTC-CCSA Meeting June 2002 How to study NGN? June 2002 The Telecommunication Technology Committee.
JOINING UP GOVERNMENTS EUROPEAN COMMISSION Establishing a European Union Location Framework.
ITU Regional Standardization Forum for Americas (Washington D.C., United States, 21 September 2015) Conformance and Interoperability Activities in CITEL.
Geneva, Switzerland, April 2012 Introduction to session 7 - “Advancing e-health standards: Roles and responsibilities of stakeholders” ​ Marco Carugi.
International Telecommunication Union Committed to connecting the world ITU/EBU Workshop Accessibility to Broadcasting and IPTV ACCESS for ALL, 23 – 24.
ITU Overview Empowering global ICT development Malcolm Johnson DOCUMENT #:GSC13-XXXX-nn FOR:Presentation SOURCE:ITU AGENDA ITEM:Opening Plenary, 4.6 CONTACT(S):Malcolm.
DOCUMENT #:GSC15-PLEN-58 FOR:Presentation SOURCE:ETSI AGENDA ITEM:PLEN 6.1 CONTACT(S): Marylin Arndt, TC M2M chair M2M and Internet of Services "When the.
25/11/2015 ITU-T NGN - Progress and Plans Brian Moore Lucent Technologies Chairman of ITU-T Study Group 13 1GSC-9, Seoul SOURCE:ITU-T TITLE:ITU-T NGN -
Nairobi, Kenya, 30 – 31 July 2010 Measuring Interoparability: From Theory to Practice Dr. Ulrich Sandl, Head of Division Federal Ministry of Economics.
ITU Workshop on “Voice and Video over LTE” Geneva, Switzerland, 1 December 2015 ACTIVITIES OF THE ITU-T SG11 TOWARDS IMS AND VoLTE/ViLTE INTEROPERABILITY.
ATIS: Work on Next Generation Networks (NGN) Presented by: Bill O’Shea Chair, ATIS NGN-FG President, Bell Laboratories & CTO & EVP, Corporate Strategy.
Colombo, Sri Lanka, 7-10 April 2009 Need of Interoperability “within” an NGN – An approach Rajeshwar Dayal, Director Dept. of Telecommunications, India.
ITU Workshop on Standards and Intellectual Property Rights (IPR) issues IPR in ICT standards View ’ s of the European Commission Anne Lehouck New Delhi,
Jeju, 13 – 16 May 2013Standards for Shared ICT Smart Grids activities in ETSI Presenter: Adrian Scrase ETSI Chief Technical Officer (CTO) Document No:
DG Enterprise and Industry European Commission Standardisation Aspects of ICT and e-Business Antonio Conte Unit D4 - ICT for Competitiveness and Innovation.
1 Global Standards, the Key Enabler for the Next Generation Network David Boswarthick Technical Officer TISPAN
New initiatives at ETSI Ultan Mulligan Director, Strategy & New Initiatives, ETSI © ETSI All rights reserved The infinity Initiative Fusing Research.
World Class Standards 44TD21 The ETSI Standards Engineering Process STF308 DTR/MTS Steve Randall STF308 © ETSI All rights reserved MTS#44 March.
Exploiting Research via Standards
ETSI Test Specifications for IP-Based Protocols TTCN-3 User Conference May , Sophia Antipolis Anthony Wiles.
ETSI–3GPP NGN ACTIVITIES
ETSI–3GPP NGN ACTIVITIES
Keith Dickerson Chairman, ICTSB
ETSI Standardization Activities on M2M communications
Welcome to the world of etsi
CEPMC Executive Board and General Assembly EC standardisation package
Intelligent Transport Systems
Smart Grids activities in ETSI
Centre for Testing and Interoperability (CTI)
Good Morning 1/17/2019.
THE WIRELESS WORLD RESEARCH FORUM -
ETSI Standardization Activities on Smart Grids
ESO response to EU RFID Mandate M/436
Presentation transcript:

29 November rd ProActive and GCM User Group & ETSI TC GRID 1 ETSI TC GRID presented to 3rd ProActive and GCM User Group 29 November 2006 Sophia Antipolis Patrick GUILLEMIN ETSI TC GRID Technical Officer

29 November rd ProActive and GCM User Group & ETSI TC GRID 2 ETSI is…  Recognized as Standards Development Organization  Created in 1988 as an independent, not-for-profit entity  Based in Sophia Antipolis, south of France, the technology park  654 members from 61 countries  Download ETSI standards for free ! ETSI member companies…  manufacturers, network operators, service providers, administrations, research bodies and users  providing a forum in which all key players can contribute: GSM, UMTS, DECT, TETRA, SAT COM, DVB, NGN, VoIP, Wireless Access, Powerline, IP Cablecom, … and GRID!

29 November rd ProActive and GCM User Group & ETSI TC GRID 3 GRID Potential for ETSI  ETSI already has:  Clear Intellectual Property Rights IPR policy  Many ETSI members are already active GRID stakeholders  ETSI organized now 3 GRID Plugtests TM events  ETSI (PTCC) owns high GRID testing potential  A neutral position to work and produce consensus based GRID interoperability Gap Analysis and its evaluation.  Existing Technical Bodies already involved in related areas:  TISPAN architecture, security and QoS control can be extended to link GRID with telecom networks  ETSI has the « Know How » in Telecom required by GRID utility  +60 cooperation agreements worldwide with SDOs and Foras

29 November rd ProActive and GCM User Group & ETSI TC GRID 4 TC GRID – Current Members  TC GRID List –  228 members as of 24 th November 2006  Includes early stakeholders:  Alcatel, CETECOM, BT, EADS, Ericsson, France Telecom, Fraunhofer, Fujitsu, IBM, INRIA, Intel, MINEFI, NEC, OFCOM, Philips, Siemens, FSCOM, Sun, Telefonica, Hitachi, Telecom Italia, Nortel, HP, Ascom, Cisco, Microsoft, SUN, Telenor, Thales, Oracle, Huawei…  Also:  European Commission DG INFSO Units F2+F3, NESSI ETP, OGF, ITU-T links and ETSI Secretariat Staff 

29 November rd ProActive and GCM User Group & ETSI TC GRID 5 TC GRID – work  GRID#1: 18 Sep 2006 (EGTD 2006, NESSI-GRID, GSCG)  GRID#2: 1 Dec 2006 here on Friday  3 work items approved that will become ETSI GRID standards  Inventory of ICT GRID Stakeholders  Identification of GRID Interoperability Gaps  ICT GRID Interoperability Testing Framework  Discussion of additional work items at GRID#2  N-Queens GRID Plugtests technical report  GCM (CoreGRID and GridCOMP)  (G)GMPLS (Fiber Optic)

29 November rd ProActive and GCM User Group & ETSI TC GRID 6 QUESTIONS / ANSWERS

29 November rd ProActive and GCM User Group & ETSI TC GRID 7 Background Slides

29 November rd ProActive and GCM User Group & ETSI TC GRID 8 TC GRID Terms of Reference (1)  Approved during Board #57 ( )  Address IT and Telecommunications convergence  Note lack of interoperable GRID solutions  Focus on GRID applications and services based on global standards and associated validation tools  Actively involve and support GRID stakeholders  Complement existing activities  Interoperability in end-to-end applications  Formal test specifications  Develop consensus-based technical specifications and reports  Networking widely with relevant standardisation bodies  Roadmap to interoperable ICT GRID standards

29 November rd ProActive and GCM User Group & ETSI TC GRID 9 TC GRID Terms of Reference (2)  Broad technical scope  Resource and service access  Protocols, middleware  Security  Broad view of convergence  GRID and Web Services  IT and Telecommunications  Fixed and mobile communications  Ubiquitous services  Broad range of stakeholders  Standardisation bodies, fora, organisations  Industry (software vendors, manufacturers, network operators, service providers, …)  Research and innovation

29 November rd ProActive and GCM User Group & ETSI TC GRID 10 Focus of ETSI TC GRID  NOT trying to duplicate standards development already underway in other bodies  Aim is to complement progress being made with more formal standards and test specifications so we can achieve levels of interoperability needed in next generation networks and GRIDs  ETSI uniquely placed to do this:  Focus on “the big picture”  Ability to address IT and networking convergence  Experience in interoperability specification, testing and certification (e.g. GSM/UMTS, DVB, WiMAX, IPv6, Parlay)  Global organisation with extensive cooperation agreements  Clear IPR policies  Formal recognition by the EC One of 3 ESOs

29 November rd ProActive and GCM User Group & ETSI TC GRID 11 Work Item: Inventory of ICT stakeholders (DTR/GRID )  Inventory and analysis of existing and emerging international GRID standards  Across range of standards-making bodies current, proposed and de facto GRID standards  Determine shortcomings overlaps, loopholes, inconsistencies all levels: network to application interfaces  Supporting organisations  BT, Alcatel, Siemens, Minefi, INRIA, EADS, FSCOM

29 November rd ProActive and GCM User Group & ETSI TC GRID 12 Work Item: Identification of interoperability gaps (DTR/GRID )  Select and propose solutions for identified interoperability gaps  Series of practical recommendations to address them  For example: compilation of application best practice definition of profiles, guidelines for operational use (open source) reference implementations conformity, compliance test suite specifications development of test tools recommendations for additional standards  Supporting organisations  BT, Alcatel, Siemens, Minefi, INRIA, EADS, FSCOM

29 November rd ProActive and GCM User Group & ETSI TC GRID 13 Work Item: ICT GRID Interoperability Testing Framework (DTR/GRID )  Define a GRID testing framework  Test and validation methodology, approach and tools  Propose reuse of tools developed by MTS-IPT (IP testing) generate “Requirements Catalogue” transform existing specifications into formal test scenarios corresponding to selected interoperability case studies  Best practice recommendations in both IT and Telecom  Use and complement existing interoperability activities events (e.g. Plugtests), profiles, testbeds, test suites, … GRID but also consider NGN, IPv6 etc  Supporting organisations  BT, Alcatel, Siemens, Minefi, INRIA, EADS, FSCOM

29 November rd ProActive and GCM User Group & ETSI TC GRID 14 TC GRID Cooperation and Liaison  Intention is to identify/foster consensus and move to interoperable solutions supported by conformance tests  Initial positive contact with a number of organisations  OGF, NESSI, ITU, Parlay Group, …  European Commission DG ENTR DG INFSO Unit F2 and F3  EC Research Programme GSCG, UniGrids, CoreGRID, NextGRID, GridCoord, COPRAS etc)  ETSI TISPAN/NGN TC, TC MTS (PTCC)  Need to formalise and develop cooperation