KICKOFF AS PRESENTED 6/17/11, SEE THIS WEEKS SCHEDULE FOP THE LATEST UPDATE Shutdown Shutdown ‘11.

Slides:



Advertisements
Similar presentations
Maintenance and Accelerator Support RHIC Run 12. RHIC species change completed: Major works in RHIC: Major works in RHIC: Power supply reconfigure (DO.
Advertisements

4/11/20131 PHENIX WEEKLY PLANNING 4/11/2013 Don Lynch.
Outages During the Run Coping with the Power Company August 9, 2012.
Proton Source Workshop Booster Downtime Wednesday, December 8, 2010 T. Sullivan.
Muon g-2 Muon g-2 Experiment Quarterly Report Aria Soha All Experimenter’s Meeting March 2, 2015.
ODH Fans and Work Planning Protecting Against the Big Event 10 Questions Before Starting a Job at C-AD Photo of the Week Collider-Accelerator Department.
Accelerator Support and Maintenance Run 14. Maintenance/Changeover Day Major efforts RHIC: Major efforts RHIC: Access hrs. Access hrs.
Accelerator Support and Maintenance Run 14. Maintenance Tomorrow Major efforts RHIC: Major efforts RHIC: Access hrs. Access hrs. RA.
June 2-4, 2004 DOE HEP Program Review 1 M. Sullivan for the PEP-II Team DOE High Energy Physics Program Review June 2-4, 2004 PEP-II Status and Plans.
A. Bross MTA RF WS August 22, Welcome MTA RF Workshop.
1 Low-energy RHIC electron Cooler (LEReC) Update November 17, 2014.
RHIC shut-down work 2011 Wolfram Fischer 18 October 2011 RHIC Planning Meeting.
Scientific Goals: V. Litvinenko’s RHIC retreat talk Commissioning Goals: I. Pinayev presentation last week Run 14 Goals: Complete assembly of 112 MHz SCRF.
NOvA meeting PIP Update W. Pellico. PIP Goals and Scope (Provided in 2011 – Directorate S. H. / DOE Talk ) Goals: Specific to the issues surrounding the.
ANU Shutdown Status AEM meeting Cons Gattuso 6/3/2012.
ILCTA_NML Progress at Fermilab Jerry Leibfritz September 10, 2007.
Machine Advisory Committee Review APS Upgrade Installation Plan and Schedule John Noonan November 15, 2006.
PHENIX WEEKLY PLANNING 2/15/2007 Don Lynch. 2/15/207 Weekly Planning Meeting 2 Remaining Schedule StartComplete Cosmic Ray Run (Run 6.9)In Progress All.
1 LEReC Funded! From: Fedotov, Alexei Sent: Thursday, May 14, :04 PM Subject: LEReC project approved Dear All, FYI. The LEReC project is now formally.
Maintenance and Accelerator Support RHIC run10. Last Wednesday: Nice recovery Nice recovery Good work all especially: Good work all especially: HP, RF,
ANU Shutdown Status AEM meeting Cons Gattuso 7 May 2012.
August 05, Startup 2013 Machine Status:  Proton Source Commissioning and Studies RFQ Injector Line (RIL) Linac Booster  Main Injector Startup.
6/6/ PHENIX WEEKLY PLANNING 6/6/2013 Don Lynch Note: No PHENIX planning meeting this week due to end of run party. Feel free to discuss safety and.
5/9/ PHENIX WEEKLY PLANNING 5/9/2013 Don Lynch.
Injector PP Setup Plan and Status November 18, 2008 Haixin Huang.
Accelerator Support and Maintenance Run 14. Maintenance Tomorrow AGS hrs CA Specific Jobs only. AGS hrs CA Specific Jobs only. RHIC.
RHIC Run th Time Meeting Tuesday 5 June 2012 WELCOME ! Safety first SP's slide Experiments and Machines, status 1 06/05/2012 Time Meeting, Run 12.
Maintenance and Accelerator Support RHIC Start Up 12.
Accelerator and NuMI Upgrades Shutdown Update Cons Gattuso July 02, 2012 July 2, 2012 Cons Gattuso1.
12/5/ PHENIX WEEKLY PLANNING Dec. 5, 2013 Don Lynch.
3/14/20131 PHENIX WEEKLY PLANNING 3/14/2013 Don Lynch.
Maintenance and Accelerator Support RHIC StartUp10.
Maintenance and Accelerator Support RHIC Start Up 12.
1 MICE Hall and Infrastructure - Progress since CM18 Chris Nelson MICE CM19 Oct 2007.
Run 12: STAR Status and Schedule Update RHIC Coordination Meeting October 18, 2011 Bill Christie BNL Outline Status update Schedule update and issues Summary.
RHIC Run14 Time Meeting. Run14 Status – Apr. 15 Operations running well, 12 stores over the past 7 days with 1 lost to another “super quench”. Testing.
RHIC Run14 Time Meeting. Run14 Status – Apr. 22 Operations running well, 12 stores over the past 7 days with 1 “super store” of 17 hours. Repositioned.
Work Effort in the LHC Injector Complex for the Upgrade Scenarios B. Mikulec Thanks to all the valuable input from the LIU project leaders and LIU work-
1 PHENIX WEEKLY PLANNING December 3, 2015 Carter Biggs.
PHENIX WEEKLY PLANNING 6/29/06 Don Lynch. 6/29/2006 Weekly Planning Meeting 2 This Week TOF W tests continue, modification decisions made? New HV connector.
PHENIX WEEKLY PLANNING 3/22/2007 Don Lynch. 3/22/2007 Weekly Planning Meeting 2 Schedule Re-Start 5 man shifts 3/20/07 Beam: blue ring 3/8/07, in yellow.
Proton Improvement Plan Bill Pellico April 19, 2013 NOvA collaboration Meeting Bill Pellico NOvA.
PHENIX WEEKLY PLANNING 2/9/06 Don Lynch. Prep Schedule for Run 6 BBC N&S dried, tested re-installed, final tested [DONE] MuTr FEE and anode purge lines.
PHENIX WEEKLY PLANNING 9/14/06 Don Lynch. 9/14/06 Weekly Planning Meeting 2 PHENIX Shutdown Overview Task_NameStart_DateFinish_Date PHENIX Shutdown '065/1/200612/8/2006.
Maintenance Nov 28, Accelerator Access LINAC will remain on RA. It is not yet running. LINAC will remain on RA. It is not yet running. Booster-
1 PHENIX WEEKLY PLANNING January 21, 2016 Carter Biggs.
2/14/20131 PHENIX WEEKLY PLANNING 2/14/2013 Don Lynch.
PIP Update June 18 th Agenda Summary Update – Current Activities/Updates – Reid, Slabaugh.
12/6/20121 PHENIX WEEKLY PLANNING 12/6/12 Don Lynch.
PHENIX WEEKLY PLANNING 3/02/06 Don Lynch. BLM Test.
Booster Shutdown Work - Week 4 Dump and Shielding installation completed Q805/Q806 re-installed, Septum in place Need to align quads and septum before.
12/20/20121 PHENIX WEEKLY PLANNING 12/20/12 Don Lynch.
August 12, Machine Status: 2013  Proton Source Commissioning and Studies RFQ Injector Line (RIL) Linac : Roof hatch installed Booster : Magnet.
5/30/20131 PHENIX WEEKLY PLANNING 5/30/2013 Don Lynch.
3/7/20131 PHENIX WEEKLY PLANNING 3/7/2013 Don Lynch.
PHENIX WEEKLY PLANNING 3/1/2007 Don Lynch March: in like a lion Out like a lamb.
SPHENIX MECHANICAL D. Lynch August 21, /15/2014sPHENIX Mechanical Design.
July 29, Startup 2013 Machine Status:  Proton Source Commissioning and Studies RFQ Injector Line (RIL) Linac Booster  Main Injector Trying to.
Accelerator Support and Maintenance Startup for Run 13.
Time Meeting March 29, W. Christie Blue Ring Magnet String issue: -on Friday morning 7am (18 March 2016) a problem developed in the RHIC Blue ring.
PHENIX WEEKLY PLANNING 6/8/06 Don Lynch. 6/8/2006 Weekly Planning Meeting 2 This Week Rec’d TOF West Access: move HBD to Dead Turtle Position Sec’y of.
Booster Status, September 4, 2003 – E. Prebys 1 Frantic Shutdown Preparations Continue…
Accelerator Support and Maintenance Startup13. Access LIPA work Friday LIPA taking feed for Booster MMPS down for emergency repair. LIPA taking feed for.
PIP Shutdown Status 9/17/2014. RIL/Linac Jobs L1 Transformer ◦Rigging complete ◦Electrical work started ◦Turn on this coming weekend Laser notcher flange.
Proton PMG September 3 rd 2015 Cons Gattuso AD Shutdown Manager.
ILCTA_NML Progress at Fermilab Jerry Leibfritz August 16, 2007.
LEReC System 1. Project Schedule 2015 shutdown COMPETE! Move beam line equipment from IP 01:00 Install cooling section beam line 2016 shutdown Install.
Schedule and Milestones Roy Preece STFC RAL FAC 17 th April 2015.
10/3/2014 Proton Source Update. RIL Update Source B is back in place and under vacuum It will be baked over the weekend It will be started early next.
Maintenance and Efficiency
Presentation transcript:

KICKOFF AS PRESENTED 6/17/11, SEE THIS WEEKS SCHEDULE FOP THE LATEST UPDATE Shutdown Shutdown ‘11

Why this meeting? Discuss any last minute issues that may impact the shutdown schedule. Show schedule for the beginning of the shutdown.  Ensure critical access are made on time.  Ensure areas opened in accordance with the work scheduled. Begin Critical and very long jobs ASAP.

General Schedule The 27 GeV/n CM run will end 0600hrs June 29 th. Power supply work June 29 th hrs. The RHIC and AGS cold snake warm up will begin immediately after PS work. AGS will run proton studies until June 30 th. NSRL will un until the end June 30 th. ODH 1 postings remain in place until July 6 th. Obey all postings, they will be modified ASAP

General schedule continued Booster, AGS and RHIC Berms and MDs will be opened sequentially unless given higher priority…  Week of July 6 th has rigging scheduled to remove blocks from access gates (MD). They will be left opened as blocks are removed. Radiation area postings at RHIC will be removed on July 1 st. AGS will remain locked until July 7 th.  Friday, July 1 st : AMMPS personnel to connect Westinghouse to AGS ring.  Wednesday, July 6 th : Pulse tests with Westinghouse into AGS. Booster will be opened following LOTO and RA surveys. Other locked areas (fan houses etc.) will be opened starting July 1 st.

Major RHIC systems shutdown: June 29 th. July 1 st : STAR and PHENIX systems to idle, magnets off. CAS to rack out supplies as necessary. RMMPS LOTO for the shutdown. IR and corrector supplies secured. Begin service building summer mode settings.  Temperature set-points will be somewhat higher, Begin power saving measures for all RHIC systems Secure/LOTO AtR supplies

June 29 th RHIC:  Address any last minute cold issues (10am June 29 at the latest).  RHIC warm up begins June 29 th 10am.  HP surveys in dump areas.  RHIC RA access begins.  Secure/LOTO RHIC equipment.  Perform HP surveys, open AtR. MD and escape tunnel accesses will be opened during the week of July 6 th.  Riggers will remove PHENIX shielding first, then blocks around the ring.

Pre Injectors End game: Booster run for NSRL ends June 30 th. Booster Vacuum will be isolated from EBIS to allow for continued commissioning. ETB “Big Red Bend” will remain energized with postings. EBIS commissioning schedule still developing.  Will continue for some time TBD. LINAC run protons for BLIP and AGS studies until June 30 th.  BLIP and NSRL off in afternoon or early evening.  AGS studies most likely run until midnight.

Tunnel Access and Timing On June 29 th access will similar to a maintenance day:  Following Power supply work, Areas except for the dumps will be opened to RA.  After HP surveys, all dump areas will be opened For all access, assume running ODH levels until otherwise posted Normally locked areas should be opened by the end of the week For access status consult the web or TV displays

LINAC and Booster Running until June 30 th. EBIS work will continue (beam to but not injected in the Booster). July 1 st, Booster berms will be opened after de- posting. NSRL tunnel areas will be opened in the evening of June 30 th after the last user and final work and documentation is completed. LINAC tunnel will be opened after a cool down period TBD based on HP surveys.

Power outages: Electrical outages for maintenance or other reasons will be scheduled around critical path work. Weekly outage lists will be displayed on CCTV and on the web. Full outage schedules will be available on the web.

Full schedules and timelines: Will be available on the web “This Week” Discussed at meetings  Supervisors meeting (weekly) Shutdown Meetings  Bi-weekly, in format similar to time meeting. Start Up meetings (daily)  Will begin as the run approaches  Defines access and activity for the day

Tracking tools…

Shutdown work Presently Reviewing Submitted Jobs. Major project work schedules are being determined Some work and priorities and schedules will be revisited at the RHIC retreat July The following slides are an outline of some of the major efforts planned. A complete list will be generated and posted on line. LIST OF JOBS

Major work at a glance: Injectors Tandem will conduct a general maintenance period and run for outside users as necessary. LINAC  Maintenance to LINAC tanks and systems.  New beryllium windows for BLIP. Booster  Foil replacement at C3 and in BtA with bake-outs  EBIS work continues… AGS:  Sextupole refurbish continues.  G17 gamma quad replace (roof off of AGS?).  I5 quad vacuum repair and reinstall.  Main Magnet coil replacement?  Access controls…

RHIC e-lens Installation of infrastructure:  Tunnel penetrations.  Cable installation.  Buss installation.  Initial stand installation.  Modifications to 1010A and 1010 trailer.  Cooling system install in 1010 buildings.  Install cryogenic tap.

RHIC Projects: Major re-work in RF area:  Prep for 56MHz system:  Cryogenic tap, compressor, trays, power supply racks  Redesign of 9 MHz,  Bouncer modification  Install new landau cavities, modify systems and commission.  28 MHz system and cavity modifications.  197 MHz system and cavity modifications.

Stochastic cooling Fabrication and rebuilds: Blue and Yellow horizontal kickers, Blue longitudinal kicker. Repairs: yellow longitudinal. Installations: Blue & Yellow pickups and H kickers, Blue Longitudinal kicker, water systems for all tanks. Upgrades: Drives, low level, hardware and cabling. Other work…

2 o’clock AnDY work:  Install PHOBOS magnet in IR.  Modify HCAL detectors.  Install ECAL detectors.  Move existing e-cal detectors.  Beryllium pipe remove and re-install. Cryogenic installation tap for CeC. Bake outs…

STAR Shutdown dependant on GEM tracker installation. In that case STAR would be rolled out for the shutdown. Possible impact on RHIC schedule. A new or modified vacuum pipe for the IR would be needed. Otherwise, STAR work would be minimal.

PHENIX Installation of the FVTX Re-design and installation of the shielding for the PRC north and South tunnels. Other work….

Questions? Thank you