24 September 2002Paul Dauncey1 Trigger issues for the CALICE beam test Paul Dauncey Imperial College London, UK.

Slides:



Advertisements
Similar presentations
6 Mar 2002Readout electronics1 Back to the drawing board Paul Dauncey Imperial College Outline: Real system New VFE chip A simple system Some questions.
Advertisements

17 Sep 2009Paul Dauncey1 US DHCAL integration with CALICE DAQ Paul Dauncey.
Measuring Cosmic Ray Flux with a trigger and CAMAC readout - Page 1 Connect the Fluke 415 HV supply output to the input of the voltage distribution box.
SPD commissioning Ricci, Míriam, Daniel, Edu, Hugo et al. from 1.
28 February 2003Paul Dauncey - HCAL Readout1 HCAL Readout and DAQ using the ECAL Readout Boards Paul Dauncey Imperial College London, UK.
31 May 2007LCWS R&D Review - Overview1 WWS Calorimetry R&D Review: Overview of CALICE Paul Dauncey, Imperial College London On behalf of the CALICE Collaboration.
29 June 2004Paul Dauncey1 ECAL Readout Tests Paul Dauncey For the CALICE-UK electronics group A. Baird, D. Bowerman, P. Dauncey, C. Fry, R. Halsall, M.
4 November 2002Paul Dauncey - CALICE News1 News from CALICE Paul Dauncey Imperial College London.
28 Feb 2006Digi - Paul Dauncey1 In principle change from simulation output to “raw” information equivalent to that seen in real data Not “reconstruction”,
20 Feb 2002Readout electronics1 Status of the readout design Paul Dauncey Imperial College Outline: Basic concept Features of proposal VFE interface issues.
10 Nov 2004Paul Dauncey1 MAPS for an ILC Si-W ECAL Paul Dauncey Imperial College London.
28 August 2002Paul Dauncey1 Readout electronics for the CALICE ECAL and tile HCAL Paul Dauncey Imperial College, University of London, UK For the CALICE-UK.
2 July 2003Paul Dauncey - DAQ1 Progress on CALICE DAQ Paul Dauncey Imperial College London, UK.
6 June 2002UK/HCAL common issues1 Paul Dauncey Imperial College Outline: UK commitments Trigger issues DAQ issues Readout electronics issues Many more.
MINER A NuMI MINER A DAQ Review 12 September 2005 D. Casper UC Irvine WBS7: Electronics and Data Acquisition  Overview (this talk): D. Casper  Front-end.
The first testing of the CERC and PCB Version II with cosmic rays Catherine Fry Imperial College London CALICE Meeting, CERN 28 th – 29 th June 2004 Prototype.
Veto Wall Test Hyupwoo Lee MINERvA/Jupiter Group Meeting July 18, 2007.
4 Dec 2001First ideas for readout/DAQ1 Paul Dauncey Imperial College Contributions from all of UK: result of brainstorming meeting in Birmingham on 13.
DAQ WS03 Sept 2006Jean-Sébastien GraulichSlide 1 DDAQ Trigger o Reminder: DAQ Trigger vs Particle Trigger o DAQ Trigger o Particle Trigger 1) Possible.
6 Mar 2002Readout electronics1 CALICE: Status report Paul Dauncey, Imperial College for Birmingham, Cambridge Manchester, UCL Outline: CALICE and the ECAL.
LCWS Apr 2004Paul Dauncey - CALICE Readout1 CALICE ECAL Readout Status Paul Dauncey For the CALICE-UK electronics group: A. Baird, D. Bowerman,
An offline look at TIF data David Stuart UC Santa Barbara May 2, 2007.
29 January 2004Paul Dauncey - CALICE DAQ1 UK ECAL Hardware Status David Ward (for Paul Dauncey)
2 April 2003Paul Dauncey - CALICE DAQ1 First Ideas For CALICE Beam Test DAQ Paul Dauncey Imperial College London, UK for IC, Manchester, RAL, UCL.
Status of Detector Prototype (for Hawaii meeting at Big Island) August 24, 2002 Yee Bob Hsiung For Koji Ueno, Yuri Velikzhanin Yanan Guo and Eddie Huang.
21 January 2003Paul Dauncey - UK Electronics1 UK Electronics Status and Issues Paul Dauncey Imperial College London.
MR (7/7/05) T2K electronics Beam structure ~ 8 (9?) bunches / spill bunch width ~ 60 nsec bunch separation ~ 600 nsec spill duration ~ 5  sec Time between.
David Cussans/Scott Mandry, NIKHEF, October 2008 TLU v0.2.
14 Sep 2005DAQ - Paul Dauncey1 Tech Board: DAQ/Online Status Paul Dauncey Imperial College London.
Level 3 Muon Software Paul Balm Muon Vertical Review May 22, 2000.
DAQ MICO Report Online Monitoring: –Status All histograms are now implemented Still not fully online –Only monitoring from data file (slightly offline,
7 Nov 2007Paul Dauncey1 Test results from Imperial Basic tests Source tests Firmware status Jamie Ballin, Paul Dauncey, Anne-Marie Magnan, Matt Noy Imperial.
26 Jan 2010Paul Dauncey1 DESY beam test preparations Paul Dauncey.
18 Jan 2006DAQ - Paul Dauncey1 DAQ/Online: readiness for DESY and CERN beam tests Paul Dauncey Imperial College London.
ECFA Sep 2004Paul Dauncey - CALICE Readout1 CALICE ECAL Readout Status Paul Dauncey For the CALICE-UK electronics group A. Baird, D. Bowerman, P.
11 Sep 2009Paul Dauncey1 TPAC test beam analysis tasks Paul Dauncey.
NA62 Trigger Algorithm Trigger and DAQ meeting, 8th September 2011 Cristiano Santoni Mauro Piccini (INFN – Sezione di Perugia) NA62 collaboration meeting,
16 Sep 2009Paul Dauncey1 DECAL beam test at CERN Paul Dauncey for the CALICE-UK/SPiDeR groups: Birmingham, Bristol, Imperial, Oxford, RAL.
26 Apr 2009Paul Dauncey1 Digital ECAL: Lecture 1 Paul Dauncey Imperial College London.
25 Feb 2005Paul Dauncey1 TB Review: DAQ Paul Dauncey Imperial College London For Imperial, RAL, UCL.
6 Mar 2006DAQ - Paul Dauncey1 DAQ/Online: readiness for DESY and CERN beam tests Paul Dauncey Imperial College London Update of Orsay talk; concentrate.
1 October 2003Paul Dauncey1 Mechanics components will be complete by end of year To assemble ECAL, they need the VFE boards VFE boards require VFE chips.
5 February 2003Paul Dauncey - Calice Status1 CALICE Status Paul Dauncey Imperial College London For the CALICE-UK groups: Birmingham, Cambridge, Imperial,
26 September 2003Paul Dauncey - DAQ1 System-wide triggering and DAQ issues Paul Dauncey Imperial College London, UK.
L.Royer– Calice LLR – Feb Laurent Royer, J. Bonnard, S. Manen, P. Gay LPC Clermont-Ferrand R&D pole MicRhAu dedicated to High.
Trigger Commissioning Workshop, Fermilab Monica Tecchio Aug. 17, 2000 Level 2 Calorimeter and Level 2 Isolation Trigger Status Report Monica Tecchio University.
Update on the project - selected topics - Valeria Bartsch, Martin Postranecky, Matthew Warren, Matthew Wing University College London CALICE a calorimeter.
LCWS Apr 2004Paul Dauncey - CALICE Readout1 CALICE ECAL Readout Status Paul Dauncey For CALICE-UK electronics group: A. Baird, D. Bowerman, P. Dauncey,
1 Calorimeters LED control LHCb CALO meeting Anatoli Konoplyannikov /ITEP/ Status of the calorimeters LV power supply and ECS control Status of.
1 Plans for first beams - - triggers from the BRM group (BSC, BPTX) Gábor Veres for the BRM group CMS Trigger Technical Coordination Meeting 8 October,
Custom mechanical sensor support (left and below) allows up to six sensors to be stacked at precise positions relative to each other in beam The e+e- international.
11 October 2002Paul Dauncey - CDR Introduction1 CDR Introduction and Overview Paul Dauncey Imperial College London.
October Test Beam DAQ. Framework sketch Only DAQs subprograms works during spills Each subprogram produces an output each spill Each dependant subprogram.
1 Tracker Software Status M. Ellis MICE Collaboration Meeting 27 th June 2005.
May E906 Work and Status TDC readout – One full TDC board, 4 ECL cables/modules KTEV UCLA LV PS – Thanks Dave N.! – +/- 5V, 18A each – Spade /10-12AWG.
ECFA Workshop, Warsaw, June G. Eckerlin Data Acquisition for the ILD G. Eckerlin ILD Meeting ILC ECFA Workshop, Warsaw, June 11 th 2008 DAQ Concept.
5 May 2006Paul Dauncey1 The ILC, CALICE and the ECAL Paul Dauncey Imperial College London.
18 Sep 2008Paul Dauncey 1 DECAL: Motivation Hence, number of charged particles is an intrinsically better measure than the energy deposited Clearest with.
Plans for the 2015 Run Michal Koval, Peter Lichard and Vito Palladino TDAQ Working Group 25/3/2015.
Backplanes for Analog Modular Cameras EVO meeting. March 14 th,
Jean-Sebastien Graulich, Geneva
PADME L0 Trigger Processor
CMS EMU TRIGGER ELECTRONICS
SEABAS/EUTelescope Integration Idea
CDR Project Summary and Issues
Example of DAQ Trigger issues for the SoLID experiment
UK ECAL Hardware Status
CALICE Readout Front End FPGA Development
Post CALICE thoughts Paul Dauncey 28 Apr 2004 Paul Dauncey.
Trigger issues for the CALICE beam test
Presentation transcript:

24 September 2002Paul Dauncey1 Trigger issues for the CALICE beam test Paul Dauncey Imperial College London, UK

24 September 2002Paul Dauncey2 Obvious: no trigger if previous particle within ~1  s Less obvious: no trigger if following particle with ~150ns, i.e. before VFE sample-and-hold time CR-RC shaping in units of shaping time  S ~ 180ns Need clean data to compare carefully with simulation No double particle events, beam halo, cosmics, etc. Must veto any events with more than one particle Trigger requirements

24 September 2002Paul Dauncey3 Want to discuss the issues for triggering here No commitment for providing trigger yet (certainly not from the UK!) I hope this starts a discussion of what will be needed UK interest here as we are building readout electronics and DAQ which uses the output of the trigger logic Soon need to decide what logic goes where I will describe a possible system “Straw man” proposal to get people thinking How much we actually use is still to be decided Trigger issues

24 September 2002Paul Dauncey4 Assume for now a simple scintillator trigger Concept works fine for scintillating fibre hodoscope also Define two levels of scintillator logic condition “Activity” and “Trigger” “Activity”; OR of hits in the scintillators, i.e. any activity “Trigger”; AND of hits in the scintillators, i.e. good central beam particle

24 September 2002Paul Dauncey5 Use Activity to veto Trigger if too close in time If Trigger within ~1  s of last Activity, then prevent Trigger from being issued If Activity within ~150ns of Trigger, then abort Trigger Cannot hold Trigger during the ~150ns as it must reach the VFE chip in time to produce sample-and-hold (~180ns) Electronics must allow Trigger without subsequent readout Only other possibility is to read out state of Activity and not use events with it set when reading offline Need to be aware of “race condition”! Trigger clearly also produces Activity so must be sure it does not kill itself Requires careful signal shaping/timing “Activity” and “Trigger” (cont)

24 September 2002Paul Dauncey6 Do we need to include “cosmics” top-bottom scintillators in the Activity logic OR so as to veto events with a cosmic as well? Will lower scintillator fit under support table for calorimeters? Risk of bias by vetoing events with large showers leaking out of sides? What is the cosmics probability to be in time with our few  s sensitive time? If low, then can be neglected Cosmic pollution?

24 September 2002Paul Dauncey7 BaBar ECAL beam test trigger logic Example of trigger including some of the elements suggested here

24 September 2002Paul Dauncey8 Do we want other trigger conditions besides beam? Cosmics? (Now selecting them!) Anti-beam (i.e. noise events)? Clock trigger? Any others? Should these be parasitic between beam bunch trains? Exactly equivalent conditions as data taking Makes control more complex Need VME control of trigger type From where? UK electronics??? Different Triggers

24 September 2002Paul Dauncey9 Where will the vetos and aborts be done? Activity preventing Trigger needs Logic to generate veto Trigger aborted by Activity needs Logic to generate abort or VME interface to read out Activity status What are the signal levels to be used? NIM? LVDS? TTL? We need to be able to plug the cables into the UK crate How much of this logic should be in the UK electronics? Logic implementation

24 September 2002Paul Dauncey10 Single board which handles trigger input to UK electronics Distribution to readout boards within crate (and elsewhere?) Holds off further triggers until readout complete Hold off is reset via VME at end of event read Minimum functionality needed Inputs: Trigger, Abort; from trigger logic. All other timing, veto, abort etc. done in NIM Output: Reset; to trigger NIM latch to allow further triggers Maximum extra functionality we might add Input: Trigger, Activity; all veto, abort, etc. done in logic on trigger board Also need to decide how to select different types of trigger More VME-controlled output levels? How many? Hard to build a general trigger board to cover both extremes… …and even harder to cover all possibilities between them UK trigger board

24 September 2002Paul Dauncey11 What are the requirements for the trigger? Different types? Different veto conditions? Who will supply the hardware? Scintillators, PMT’s, HV power supplies, NIM (or similar) trigger logic units, etc? How much will be common to the beam position system? Do we want post-trigger abort in hardware or software? Timescale to decide must be soon! UK should be building trigger board (one off) in ~7 months Needed to test prototype readout boards Must know functionality of trigger board with ~2 months Main questions