Www.altecspace.it All rights reserved © 2014 - Altec ExoMars 2018 Rover Operations Control Centre Plans for rover operations training at ROCC M. Cinato.

Slides:



Advertisements
Similar presentations
1 Participation in the ResourceSync NISO Work Item Nettie Lagace NISO Associate Director for Programs March 6, 2012.
Advertisements

Mediaocean Training Options ONLINE LEARNING Best for: New-starters and Mediaocean systems beginners Benefits: Available on-demand, unlimited number of.
Completing your Production Log. Page no.ContentsCompleted by.... Page 1 Front sheet  Completed by candidate, signed by both candidate and supervisor.
All rights reserved © Altec ExoMars 2018 Rover Operations Control Centre Decision making process, Communications and Planning.
OHT 8.1 Galin, SQA from theory to implementation © Pearson Education Limited 2004 Review objectives Formal design reviews (FDRs) Participants Preparations.
The National Driver Education Standards and the ADTSEA 3.0 Curriculum
09 May 2014page 1 ROCC to PPL ICD Initial Definition ExoMars Rover Operations Control Center ROCC.
Development plan and quality plan for your Project
LSU 07/07/2004Communication1 Communication & Documentation Project Management Unit – Lecture 8.
Lee Rogers, Instructional Designer Presentation Date: July 30, 2012 Client Organization: ABC English School Project Management Plan For ABC English School.
DEFENCE LEARNING NETWORK PROJECT DLN Overview and Demonstration UMCC HR Sub-committee 6 December 2012 Susan Nutbrown DLTPD/DGWD DLN Project Leader (Civilian)
Update on the HadronPhysics projects NuPECC Meeting – Juelich, March 2013 Carlo Guaraldo.
Information Resources and Technology BY deya rejela Baha abbas Information Technology Planning and Management.101 BY deya rejela Baha.
Principals’ Council Meetings May  Given feedback from multiple stakeholders and after much deliberation, PDE has made the determination to classify.
Advance and the Electronic Packet Advance and the Electronic Packet April 5,
SQA Architecture Software Quality By: MSMZ.
LCG Milestones for Deployment, Fabric, & Grid Technology Ian Bird LCG Deployment Area Manager PEB 3-Dec-2002.
BUMP UP YOUR CAREER POTENTIAL WITH PROFESSIONAL CERTIFICATION!
All rights reserved © Altec ExoMars 2018 Rover Operations Control Centre Available Tools for planning and Data Processing I. Musso.
© L.A.C.E. Research Group, 2003 University of Cadiz Eudoxos Project Teaching Science with a Robotic Telescope EVALUATION OF THE EUDOXOS PROJECT The evaluation.
HND Social Services Sector Briefing Session 23rd March 2007.
All rights reserved © Altec ExoMars 2018 Rover Operations Control Centre ROCC to Pasteur Payload ICDs E. Ferrentino.
CCT Certification Process 2012 NCSLI Workshop and Symposium Shawn Mason.
Model-Netics® Instructor Training Program (ITP) – March 7-9, 2011
Certification and Accreditation CS Phase-1: Definition Atif Sultanuddin Raja Chawat Raja Chawat.
Institute of Food Technologists (IFT) myIFT.org Overview Paul D. Grassman Director, Information Services September 2003.
Managing TAA CCCT Grant 1 Today’s goal – The purpose of today’s training is to help you understand what the purpose of the grant is, how it came to KCTCS.
NET-SHARE Kick-off meeting Matosinhos, Portugal April 15 h 2008 ICT Policy Support Programme (ICT PSP) WPs and ACTION POINTS.
All rights reserved © Altec ExoMars 2018 Rover Operations Control Centre Planned Organization of ROCC Operations I. Musso.
Project Life Cycle.
INFSO-RI NA2 Status Update ETICS2 second AHM Isabel Matranga Engineering Ingegneria Informatica SpA Darmstadt, February 2009.
PDS Geosciences Node Page 1 Archiving Mars Mission Data Sets with the Planetary Data System Report to MEPAG Edward A. Guinness Dept. of Earth and Planetary.
Emergency Management Training and Education System Protection and National Preparedness National Preparedness Directorate National Training and Education.
Role of Account Management at ERCOT Nodal Training Project TPTF Debrief – December 5, 2006 Market Education.
Page 1 JUSTIFY define and validate REQUIRE- MENTS define initial management DOCUMENTS define INFRA- STRUCTURE allocated maintenance changes management.
All rights reserved © Altec ExoMars 2018 Rover Operations Control Centre Science instruments data pipeline G. Martucci.
BEGINNING EDUCATOR INDUCTION PROGRAM MEETING CCSD Professional Development Mrs. Jackie Miller Dr. Shannon Carroll August 6, 2014.
Orientation and Summer Institutes Implementer’s Forum October 2005 Susan Barrett PBIS Maryland.
WP2 – Strategy, co-operation and dissemination EuroVO-AIDA – First periodic review – 24 April 2009 Françoise Genova, Project Coordinator WP2 – NA2 Strategy,
International Speedway Boulevard Stakeholders Task Force (STF) Meeting 1 Wednesday, May 19, 2010.
…to integration Information and advice: A single point of access that filters enquiries using a single source of information (the ‘local offer’) as soon.
LORO (Language Open Resources Online): a languages repository for DoL Tita Beaven, Anna Comas-Quinn, Annie Eardley, Christine Pleines and Hélène Pulker.
State of Georgia Release Management Training
GEOSS Common Infrastructure Initial Operating Capability Directions and Discussion Presented to GEO ADC Geneva May
1 SUZAKU HUG 12-13April, 2006 Suzaku archive Lorella Angelini/HEASARC.
Objectives for the day: To: bring Local Authorities up to date with progress in key areas of development of the successor arrangements to CCGs and CLs.
Strategic Planning Deanna Herwald Vice President-Quality Management Systems.
February 23, 2006 MTAC Workgroup #87 Improving the Drop Shipment Process Update.
MOL The Mission Operations Laboratory MOL The Mission Operations Laboratory NASA MSFC Engineering Directorate Huntsville, Alabama PROCESS REVIEW Training.
6/6/ SOFTWARE LIFE CYCLE OVERVIEW Professor Ron Kenett Tel Aviv University School of Engineering.
The Care Certificate (Yes, it’s here!) What happens next? Why is the CareShield solution the best? How… When… Who… What… Why…
R8 Rx Burn Workshop 11/29-12/3/04 Task Book Evaluations and Critique TASK BOOK ASSIGNED TO: INDIVIDUAL’S NAME, DUTY STATION, AND PHONE NUMBER TASK BOOK.
Professional Growth and Effectiveness System Update Kentucky Board of Education August 8,
Metropolitan Planning Organization Advisory Council Florida Department of TRANSPORTATION Carmen Monroy Director, Office of Policy Planning April 28, 2016.
Quarterly Certification Automation Project
Learning Management System
ECE362 Principles of Design
IEEE Std 1074: Standard for Software Lifecycle
The RSP Archive System RSP Archive Concept Review 28 September 2017
TN: TEACH AACTE Grant TN TEACH: The TN EPP Assistive and Collaborative Help Network.
Exploitation of ISS Scientific data - sustainability
CCSP/SOURCE and EVV Update
HCS Elementary Education Department
The School Mentor 9/19/2018.
Quality Management Systems – Requirements
Aspiring Leaders Program
13-block rotation schedule
Aspiring School Leaders Information Session
Key Data on education: process for statistical indicators
Annual Professional Development Conference
Presentation transcript:

All rights reserved © Altec ExoMars 2018 Rover Operations Control Centre Plans for rover operations training at ROCC M. Cinato

All rights reserved © Altec Ref. Nr.  Inform you about ROCC training approach  Receive your comments and suggestions  Propose next steps and deadlines Objectives Dec 2014Page 2

All rights reserved © Altec Ref. Nr.  Positions considered for training:  Training Lead  Instructor  Payload or Rover Subsystem Training Responsible  Simulation Director  Simulation Operator  Trainee Training Positions Dec 2014Page 3

All rights reserved © Altec Ref. Nr.  It is a formal declaration that the operator successfully completed a training covering all his/her tasks during the mission  Certifications are tailored to each position, with common and specific areas  Due to the short duration of the ExoMars mission certifications expirations are not considered Certification Dec 2014Page 4

All rights reserved © Altec Ref. Nr.  A formal process will be set up  A Learning Management System will store all certification records  The Mission Director will sign the documents  The Training Responsible will help collecting, assembling and verifying all certification materials Certification Dec 2014Page 5

All rights reserved © Altec Ref. Nr.  It is defined by the ROCC Training Plan document  A first issue will be available on April 2015  Defines the approach, the lessons catalogue, the users and the certification requirements  It is prepared by the ROCC Training Lead Training Approach Dec 2014Page 6

All rights reserved © Altec Ref. Nr.  Columbus ESA training for ground operators is organized with classroom lessons at Cologne and Munich  This provides a possibility for setting up contacts with other sites’ operators  Arranging suitable dates for many operators is not easy and sometimes long waiting lists are required  Columbus did not require to build up the whole team in a short time as ExoMars Columbus Training Approach Dec 2014Page 7

All rights reserved © Altec Ref. Nr.  ExoMars training should be efficient to assemble a full team in time for a condensed mission  First training phases may overlap with last payload development stages  Operators may have limited booking time for training during this period  Lessons should then be remotely available as an option ExoMars Training Approach Dec 2014Page 8

All rights reserved © Altec Ref. Nr.  Many theoretical lessons may be delivered using an e-learning infrastructure  This allows on-demand delivery removing location and timing contraints  Operators can recall lessons at any time to refresh knowledge  Some common lessons will be delivered on-site to allow direct interaction with instructors and other operators ExoMars Training Approach Dec 2014Page 9

All rights reserved © Altec Ref. Nr.  The Learning Management System (LMS) will be available soon  Lessons description, Operators certification information and training catalogues will be available  Sensible and private information will be protected LMS and Collaboration (1 / 2) Dec 2014Page 10

All rights reserved © Altec Ref. Nr.  The LMS will act as a common repository where operators are invited to share material useful for training  Payload training responsibles will coordinate this data collection  Wikis and forums will be available for discussions  News about ExoMars training will be available on the LMS as prime distribution medium LMS and Collaboration (2 / 2) Dec 2014Page 11

All rights reserved © Altec Ref. Nr.  The amount of lessons required for certification is related to mission tasks assigned to the position  Lessons are implemented with increasing specialization  Material will be available for refresh at any time using the LMS, with cue cards and quizzes Lessons Allocation Dec 2014Page 12

All rights reserved © Altec Ref. Nr.  Simulations are organized for operators certification  Operators are declared mission ready after completion of theoretical lessons as well as simulation sessions  Effort on simulations is maximized, focusing on operational and troubleshooting skills Simulations Dec 2014Page 13

All rights reserved © Altec Ref. Nr.  Simulations will be organized to deliver multiple products:  Certification of ExoMars operators  Validation of ground infrastructure  Development of a planning library that will be the input for strategic plans  Development of a knowledge base of failures and replannings Simulations Products Dec 2014Page 14

All rights reserved © Altec Ref. Nr.  Organizes the ROCC training catalogue to define the certification process  Defines the training requirements for each ROCC operator  Prepares the high level definition of lessons and simulations  Verifies fulfillment of certification requirements  Manages lessons evaluations and updates Training Lead Dec 2014Page 15

All rights reserved © Altec Ref. Nr.  The Columbus project defined a training point of contact in each scientific group  It was very useful and should be defined for ExoMars as well  The position should support the ROCC Training Lead in training preparation and certification activities Payload or Rover Training Responsible (1 / 2) Dec 2014Page 16

All rights reserved © Altec Ref. Nr.  Provides support for:  Information management about operators and payloads  Documents retrieval to assemble specialistic lessons about payloads and experiments  Information retrieval to set up simulations and certifications  News distribution and delivery verifications Payload or Rover Training Responsible (2 / 2) Dec 2014Page 17

All rights reserved © Altec Ref. Nr.  We are not going to teach you about your instrument  However, we are teaching you something about the other experiments  We would like you to support us to prepare the instructional material about your experiment Final Considerations Dec 2014Page 18

All rights reserved © Altec Ref. Nr.  Short term (March 2015):  Appoint a training responsible in each payload team  Estimate the number of operators to certify (placeholders are ok, names are not mandatory)  Provide any material considered useful for training preparation (draft information and notes are ok) Proposed Schedule (1 / 3) Dec 2014Page 19

All rights reserved © Altec Ref. Nr.  Medium-term (End 2015 – Jan 2016):  Provide a first set of operators candidates and references  Provide a first batch of payload material for training development  Receive first training sessions for training responsibles  Inform future candidates about lessons availability and Learning Management System use Proposed Schedule (2 / 3) Dec 2014Page 20

All rights reserved © Altec Ref. Nr.  Simulations and Final Training with launch scheduled on May 2018  Anticipated Training: July to December 2017  Pre-launch Training: January to May 2018  Post-launch Training: June to December 2018  Facilities Availability  ROCS software V2 October 2016, V3 March 2017  Rover Operational Simulator ROSEX TAPS V3 February 2017, V4 June 2017  Terrain Simulator: May 2017 Proposed Schedule (3 / 3) Dec 2014Page 21