Peter Spiller, IHEP, Protvino GSI, 15.1.08 Peter Spiller 15.1.2008 IHEP FAIR in kind Contributions.

Slides:



Advertisements
Similar presentations
JINRs PARTICIPATION IN SIS100 & SIS300 JINRs PARTICIPATION IN SIS100 & SIS300 5 th WORKSHOP on the SCIENTIFIC COOPERATION between GERMAN RESEARCH CENTERS.
Advertisements

FAIR Synchrotrons SIS100/300
PLANS JINR PARTICIPATION for JINR PARTICIPATION FAIR PROJECT: in the FAIR PROJECT: - ACCELERATOR TECHNOLOGY A.Kovalenko 103 session of the JINR Scientific.
UNILAC SIS 18 SIS 100/300 HESR Super FRS NESR CR RESR Sergey Kozub Institute for High Energy Physics Protvino, Russia SIS300 meeting 19 March, 2009 Sergey.
Trip Report on the visit to ICST of HIT, Harbin, China Derun Li Mike Green Steve Virostek Mike Zisman Lawrence Berkeley National Laboratory (from December.
FAIR March 20, 2007 D. Krämer GSI/FAIR Division Technical Status: status of layout status of civil engineering items under current discussions status of.
FAIR GmbH and FAIR Project History, Status and Outlook
1 Low-energy RHIC electron Cooler (LEReC) Update November 17, 2014.
Introduction 1 Proposal for the structure of FAIR GmbH construction phase 2 Relationship between FAIR GmbH and GSI mbH construction phase Contract Site.
The ESS vacuum team has overall responsibility for all technical vacuum systems used on the: Accelerator, Target and Neutron Scattering Instruments and.
Prospects of SC Quadrupole Production at IHEP-Protvino The 2nd Institutes Meeting on International Construction of the FAIR Accelerator Complex Protvino,
Helmholtz Centre for Ion Research D. Krämer, 2nd Lab Directors Meeting, Protvino, January 15-16, 2008 Design and Engineering Issues; Standardization and.
CCC Meeting Cryogenic Current Comparator in the FAIR Project Overview of FAIR / current status Beam diagnostics work package Tasks and installation locations.
Large-capacity Helium refrigeration : from state-of-the-art towards FCC reference solutions Francois Millet – March 2015.
BINP for FAIR Yu.Shatunov Moscow May Research and Development Contract between GSI and BINP 1. Kickers for synchrotrons and storage rings.
Status of FAIR Yuri Zaitsev (ITEP) Physics of Compressed Baryonic Matter 1-st CBM-Russia-JINR Collaboration Matter May 19-22, 2009, Dubna, Russia.
Progress Report Günther RosnerNuPECC, Copenhagen, 15/6/121.
Proton Linac, Workshop, December 3 rd - 4 th, 2007 The FAIR Proton Linac Outline Requirements to Proton Linac Source, RFQ, DTL, RF Beam Dynamics.
FAIR – Facility for Antiproton and Ion Research Austria China Finnland France Germany Greece India Italy Poland Slovenia Spain Sweden Romania Russia UK.
IHEP participation in SIS300 production UNILAC SIS 18 SIS 100/300 HESR Super FRS NESR CR RESR Institute for High Energy Physics Protvino, Russia FAIR meeting.
1 Low-energy RHIC electron Cooler (LEReC) cost estimate December 2, 2014.
International Accelerator Facility for Beams of Ions and Antiprotons at Darmstadt Status of the FAIR project Visit in Wuhan,China November 23, 2006 J.
P. Spiller, SIS18upgrade, Peter Spiller GSI, Darmstadt Kick off Meeting - EU Construction DIRAC Phase SIS18 upgrade.
Cryogenic Experts Meeting (19 ~ ) Cooling scheme discussion for 300 Tm High Energy Beam Transfer line (HEBT) with large inclination MT/FAIR –
WP3 Required interfaces for cryostat design / integration Patxi DUTHIL SPL 3 rd Collaboration Meeting, CERN, Geneva November 12 th 2009.
HLRF DRAFT Global Design Effort 1 Defining EDR* Work Packages [Engineering Design Report] Ray Larsen SLAC ILC Division for HLRF Team DRAFT April.
Introduction Riko Wichmann, XFEL Project Office (XPO) XFEL Technical Reviews.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
Peter Spiller, DIRAC Kick-off meeting Peter Spiller Design Study Group DIRAC kick-off meeting SIS100.
Welcome to FAIR RF Review for TAC Meeting in June 2007.
CLIC Implementation Studies Ph. Lebrun & J. Osborne CERN CLIC Collaboration Meeting addressing the Work Packages CERN, 3-4 November 2011.
Peter Spiller, COLMAT-Kick off meeting, Cryo-Collimator, CERN, COLMAT Kick-off meeting CERN Peter Spiller Cryo-Collimator (Catcher) for.
Low Energy RHIC e - Cooling Meeting Minutes – 11/19/14 1. Cooling Section Magnets and Power Supplies –Most of power supplies will be from ERL (R. Lambiase).
Status of GSI-FAIR Project magnets - open issues - G. Moritz GSI CARE HHH AMT November
GSI Helmholtzzentrum für Schwerionenforschung GmbH LINK EXISTING FACILITY I n order to prepare the existing GSI accelerator facility (mainly the SIS18)
International Accelerator Facility for Beams of Ions and Antiprotons at Darmstadt Introduction and Status EU CNI contract Kick-off meeting, December 1-2,
International Accelerator Facility for Beams of Ions and Antiprotons at Darmstadt Construction of FAIR Phase-1 December 2005 J. Eschke, GSI Construction.
BDS: 1 October 13, 2007 BDS KOM EDR planning discussion Andrei Seryi October 13, 2007.
Date 2007/Oct./23 FNAL-GDE-Meeting Global Design Effort 1 Cryomodule Interface Definition (FNAL-GDE-Meeting) N. Ohuchi.
ESS WP 12 Project Management & Capabilities Overview Neil Bliss Projects & Mechanical Engineering Group Leader ESS PDR, Lund, 10 th November 2015.
13 September 2006 Global Design Effort 1 ML (x.7) Goals and Scope of Work to end FY09 Nikolay Solyak Fermilab Peter Tenenbaum SLAC.
October 25, 2007 A. Brachmann Slide 1 ILC polarized Electron Source EDR Work Packages ALCPG/GDE Meeting Fermilab, October 25, 2007 Axel Brachmann.
D&D Review 6 August PEP-II Minimal Maintenance State Upkeep Stan Ecklund (J. Seeman, S. DeBarger, D. Kharakh, M. Zurawel)
NA62 Organisation of the work - proposal 2/24/20161PD/DT/PO-MH.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
Date 2007/Sept./12-14 EDR kick-off-meeting Global Design Effort 1 Cryomodule Interface definition N. Ohuchi.
ESS | title of presentation | 2012-xx-xx | name of presenter Roles and Responsibilities sub title.
Plant Maintenance Experts CPM Engineering offers diagnosis and repair of electrical and mechanical equipment. From pump, gearbox & motor repairs, machining.
LHC Beampipes Ray Veness / AT-VAC FP XII 08Beam Vacuum- R.Veness.
Udo Blell - Synchrotrons 1 Udo Blell GSI, Darmstadt MAC – 7 April 2 th - 3 th, 2012 FZ - Jülich SIS 100 Injection / Extraction systems.
O. Kester, NuSTAR annual meeting, 27/02/2013
Contents: -GSI organization structures -Tasks of GSI (accelerator) -Status of evaluations / technical developments -Overview -Note : (only) accelerator.
Machine Protection Systems (MPS) Arden Warner, and Jim Steimel Project X Machine Advisory Committee March 18-19, 2013.
Introduction to the effort on C-ADS accelerator physics and review charges Jingyu Tang For the Joint IHEP-IMP group on the C-ADS Accelerator Physics International.
ILCTA_NML Progress at Fermilab Jerry Leibfritz August 16, 2007.
Peter Spiller MAC meeting Time Schedule SIS100 1.
Progress Report Günther RosnerNuSTAR Annual Meeting, Darmstadt, 29/2/121.
Peter Spiller, November 2012, Structure and Tasks of the Project Division Primary Beams Peter Spiller Machine Advisory Committee Meeting.
O. Kester, 6 th MAC meeting, Darmstadt, 10/10/2011 FAIR ACC planning and schedule O. Kester 6th FAIR - Machine Advisory Committee Meeting
Status of the FAIR Project
High energy beam transport.
Oleksiy Dolinskyy December 1st, 2014
Status of HESR 18th March Gießen Dieter Prasuhn.
Testing of SC Magnets Status - November 2010
FAIR ACCELERATORS Peter Spiller EMMI workshop
Joint Meeting SPS Upgrade Study Group and SPS Task Force
SIS100 quadrupole status S. Kostromin, H. Khodzhibagiyan, G. Trubnikov, FAIR 11th MAC, GSI, May,
XFEL Vacuum System Commissioning
TTC Hot Topic Common Questions
Summary of Washington DOE Review
Presentation transcript:

Peter Spiller, IHEP, Protvino GSI, Peter Spiller IHEP FAIR in kind Contributions

Peter Spiller, IHEP, Protvino GSI,  The overall general machine layout has been completed and is fixed  The detailled technical design (production readiness) of the components has not been completed (specifications: partly functional and partly detailled)  In a cold machine all components have to be planned as a whole (in contrary to a warm machine) > The cryomagnetic system (85 % of the circumference)  Next step is to finalize the technical design in detail by a consortium, joint venture or similar of those who expressed their interest

Peter Spiller, IHEP, Protvino GSI,  The present work package structure of the cryomagnetic system (dipoles, quadruples, etc.) may be one option but may not be the most appropriate to the technical capabilities and wishes of all partners  An alternative work sharing structure of the cryomagnetic system should be considered among the potential partners, those who have expressed an interest in the components

Peter Spiller, IHEP, Protvino GSI, There are many components identical and used in several machines (number of components to be produced): e.g. Rf acceleration cavities : SIS100, SIS300, NESR Cold BPMs: SIS100, SIS300 S.C. Magnets: SIS300, HEBT Beam diagnostics: e.g. Residual Gas Profile Monitor: SIS100.SIS300. CR, RESR, NESR

Peter Spiller, IHEP, Protvino GSI,  Global machine drawings at GSI (Mutual interactions of machines, Interface to civil construction, Integration of components etc.)  Integration of each component design continously needs to be checked during the design process and especially before production start  The active partners in consortia in the pre-production (component design finalization) phase may be different to the production phase

Peter Spiller, IHEP, Protvino GSI, In order to assure maintenance, service and reliability (fast repair in case of fail funtcions) a number of parts for technical components must be purchased centrally for the inkind responsibles e.g. interfaces to a common control system, cryogenic valves, UHV pumps, interfaces to media supply Table has to be generated and approved

Peter Spiller, IHEP, Protvino GSI, SIS100 EOI

Peter Spiller, IHEP, Protvino GSI, SIS300 EOI

Peter Spiller, IHEP, Protvino GSI, HEBT EOI