Environmental Working Group Presentation Part III: Selecting an LNG Hub Site in the Kimberley? Tim Nicol, Resources Liaison Officer, CCWA.

Slides:



Advertisements
Similar presentations
Gero Vella Offshore renewable energy: a business perspective On behalf of: Renewable Energy Systems Limited (RES) & Centrica Renewable Energy Limited.
Advertisements

The Natural Values of the Kimberley. Introduction This section of the eNGO presentation will talk briefly regarding the natural values of the Kimberley.
THE DIVERSITY OF INTERESTS IN ENVIRONMENTAL GOVERNANCE A CHALLENGE FOR THE RULE OF LAW By Professor D E Fisher.
Site Evaluation Workshop. Introduction to the Northern Development Taskforce The Northern Development Taskforce was established by Cabinet on the 15 June.
Lenape Lenape Energy sources: Geothermal- 4,000 MW Hydroelectric- 10,000 MW Nuclear- 6,000 MW Wind- 3,000 MW Tidal – 2,000 - MW (Import from Paradise)
Australia’s heritage system. This presentation covers Background to Australia’s Heritage system National Heritage listing process Kimberley heritage assessments.
Options for Mitigation and Adaptation Technologies for the Pacific Island Countries by Mahendra Kumar South Pacific Regional Environment Programme, Apia,
Geology Matters 2013 Presenter: Robert Federico, Principal November 14, 2013 Donkin Coal Mine Environmental Assessment Case Study.
Garma Festival of Traditional Culture Tom Calma Aboriginal and Torres Strait Islander Social Justice Commissioner 7 – 8 August 2008 Indigenous Climate.
Site Evaluation Workshop. 3 Key Points Objectives of the Workshop 1.Provide the Traditional Owners with information that will assist in their decision.
Toward a Sustainable Future Name of Conference, Event, or Audience Date Presenter’s Name | ©2011 Synapse Energy Economics Inc. All.
IAIA 2012 Portugal Australian EIA Practitioners views on addressing climate change Dr Garry Middle, Curtin University.
North Hoyle Offshore Wind Farm 17th April 2002 BONUS Energy A/S.
State Energy Office NC Department of Administration Energy and Environmental Initiatives in North Carolina – Accelerating Change Bob Leker.
Future Research NeedsWorld Heritage and Climate Change World Heritage and Climate Change - Future Research Needs Bastian Bomhard World Heritage Officer.
Spatial planning in the marine environment Gillian Glegg and Jonathan Richards.
Canadian International Council Managing the Environmental Challenge Pacific Northwest Gateway Conference October 28, 2014 Doug Caul Associate Deputy Minister.
MITIGATING CLIMATE CHANGE. WHAT WE KNOW The level of greenhouse gases in the atmosphere have increased, causing the Earth’s temperature to rise. One greenhouse.
Centrica – An Energy Utility Perspective Gearόid Lane Director, British Gas New Energy 29 th April 2009.
Severn Tidal Power – a proposal A Barrage of Issues.
Living with our changing climate Session: Adaptation and initiatives supporting adaptation CSIRO Climate Research and IOCI.
TIER1 Energy Security in PECC Region Dr. David Hong Taiwan Institute of Economic Research November 2001.
Severn Tidal Power Feasibility Study Background to the study Terms of reference announced in January 08 Aim of the study: To enable Government to decide.
Kimberley Marine Research Program Chris Simpson Marine Science Program, DEC KMRP Node Leader, WAMSI Kelly Waples KMRP Science Co-ordinator WAMSI.
3.3 Energy Resources Human Population, Carrying Capacity, and Resource Use.
Global Warming. Amount of CO2 – emissions in Germany.
LARGE DAMS AS A SOURCE OF RENEWABLE ENERGY Glen Singleton, Ph.D., P.Geo., B.C. Hydro Canada.
1 Washington Action on Climate Change Hedia Adelsman, Department of Ecology September 25, 2009.
Washington State Energy Facility Site Evaluation Council Region 10 Regional Response Team Northwest Area Committee Seattle, WA February 12, 2014 EFSEC.
Overview of Activities Freight and Logistics Council.
Partnership for Urban South Hampshire Sustainable Growth.
Unit 4 Sustainable outdoor Relationships In this unit we will explore key characteristics of healthy environment and explore some of the threats to maintaining.
Washington State Energy Facility Site Evaluation Council Jim Luce, EFSEC Chair Port Of Vancouver Presentation Vancouver, WA June 27, 2013 EFSEC These Slides.
1 Bureau of Ocean Energy Management Assessing Historic Properties and Cultural Resources in the Main Hawaiian Islands Dave Ball, MA, RPA Pacific Region.
EU Legislation in the field of environment – key developments in 2007 and rd ECENA Plenary Meeting 18 September 2008.
MSFD Programme of Measures Consultation Event Anna Donald Head of Marine Planning & Strategy.
INTERNATIONAL UNION FOR CONSERVATION OF NATURE World Heritage renomination Presentation to the first leadership committee of the Ha Long Bay-Cat Ba Alliance.
AUSTRALIA’S NATURAL RESOURCES. Natural resources are things supplied by nature that can be used by humans They include water, soil, forests, fish, energy,
Reform of Environmental Impact Assessment in Western Australia ‘Environmental Assessment in Federations: Current Dynamics and Emerging Issues’ Ottawa,
NORTHERN DEVELOPMENT TASKFORCE Site Evaluation Workshop BROOME Duncan Ord – NDT secretariat
STRATEGIC ENVIRONMENTAL ASSESSMENT METHODOLOGY AND TECHNIQUES.
Marine Renewables Marine Renewables and integrated planning Mike Neilson Director, Marine Scotland Scottish Government.
Conservation management for an uncertain future Mike Morecroft.
The Hayward Building Systems Plant LEED 2.1 Gold.
2006 Cumulative Effects Assessment CEA Definition  Potential for residual project-specific effects associated with Meadowbank project in combination.
HazMat Response Arrangements Western Australia Ken Raine Manager Environmental Hazards Department of Environment and Conservation.
Purpose of the report Respond to a major gap in awareness and knowledge Overview of a range of best practices Highlight the interrelationships Not a policy.
Overview of San Diego Climate Action Plan Nicole Capretz Director of Environmental Policy iMayor’s Office.
NS4054 Fall Term 2015 North America Energy Trilemma.
Environment and Disaster Planning Hari Srinivas, GDRC Rajib Shaw, Kyoto University Contents of the presentation: -What is the problem? -Precautionary Principles.
The Kimberley Almost twice the size of Victoria, larger than Italy or Germany One of 15 Australian national diversity Hotspots - unique vegetation, home.
Sustainability and Facilities Management John Sullivan Energy & Sustainability Office Facilities & Services Division.
Educational Center for promotion of Renewable Energy, Ecotourism and Heritage Preservation.
Planning the New Rural Economy Fergus Murray Argyll and Bute Council Development Policy Manager.
Lesson 9: Renewable Energy Sources.  MUST understand that some renewable sources of energy drive a turbine directly  SHOULD understand that while technology.
1 Scenario formulation Scenario-based planning is a structured way of thinking about what might happen in the future Scenarios are descriptions of possible.
Planning Scotland’s Seas consultation Seas Consultation 2013.
Climate Change and the Three R’s LGA Climate Change Summit Anita Crisp June 2008.
CNG/LNG and Diesel Displacement in the Pilbara
Marine Planning since 2011 Linda Rosborough – Director of Marine Scotland.
European Environmental Liability Safety of offshore oil & gas activities Harko Kremers, sr specialist insurance techniques.
Regional Economic Development and Diversification Paul Rosair, Director General Department of Regional Development 25 September 2013.
Mitigation The potential to use protected areas in carbon storage and capture.
THE MURUJUGA TOURISM CONCEPT PILBARA WA
OPPORTUNITIES IN WESTERN AUSTRALIA APPEX London 2011
The EU strategy on adaptation to climate change
Hydrographic awareness and the benefits of hydrography
DG Environment, Nature Protection Unit (D3)
Chapter 5: Water management and adaptation
Wind energy & EU legislation for Nature conservation
Presentation transcript:

Environmental Working Group Presentation Part III: Selecting an LNG Hub Site in the Kimberley? Tim Nicol, Resources Liaison Officer, CCWA

Ranking Sites is Premature Kimberley is world class environment deserving of world class decision: –Scientific knowledge is lacking –Heritage assessment is incomplete –TO consultation rushed for such a complex issue (informed consent) Inadequate information to make a decision on any site Default position should be no decision until information provided (Precautionary Principle)

Which Site Can Be Sacrificed? Kimberley has outstanding natural and cultural values The case has not yet been made that any site can be sacrificed for development Considered unlikely that environmental impacts will be acceptable for any Kimberley site

Alternatives need to be Considered… With appropriate assessment consider: –Offshore FLNG –Pilbara (not Barrow or Burrup) –No development option

Browse Basin LNG Development and GHG Emissions Processing Browse LNG will result in significant CO2 emissions for WA –WA Government target ~26mtpa by 2050 –No policy on CO2 Emissions for major projects like Browse Basin Source: Premier of Western Australia (2007) Inpex + Woodside approx 18mtpa

Browse LNG Developments and Greenhouse Gas Emissions No robust sequestration options identified Biosequestration unacceptable for this magnitude of emissions No GHG plan = No Development

What about Renewable Energy? WA far behind on renewable energy opportunities: –California: Ausra 175MW, BrightSource 200MW baseload solar thermal –Massive wind capacity –Geothermal underinvestment –LEED fund 35m over 5 years, adequate??? –CETO wave project, where is it now? Where is the R.E.D.T.?

Key Impacts: Dredging Gorgon: Largest dredging project in WA EPA recommendations: One of 5 key reasons Gorgon rejected by EPA Dampier Port lost 23-35% coral cover – EPA limit 10% Geraldton Port – Investigated by then DEP after dredge plume damaged extensive sea grass

Key Impacts: Shipping Gorgon – EPA quarantine concerns Increased shipping Turbulence Spills? Interference with wildlife Loss of remote and natural amenity value Introduced marine pests

Key Impacts: Water Gorgon project (from ERMP) uses 1.9 GL/year –Cape Leveque Coast: 8.3GL/year –Isdell River SWMA: 4.3GL/year –Prince Regent River SWMA: 4.2GL/year –King Edward River SWMA: 4.2GL/year –Drysdale River SWMA: 4.2GL/year No water management plans for these areas

Key Impacts: More People More fishing, cars, towns, boats, marinas, roads etc Busselton Experience

Key Impacts: Remote, Natural Experience This experience increasingly rare in the world Kimberley place of exceptional natural beauty and remote: irreplaceable Valued by many people around the world

The Environmental NGO Experience of Environmental Impact Assessment Esperance Lead Pollution Dredging at Geraldton Predictions and commitments in EIA do not always translate to reality Any development is a risk

The Environmental NGO Experience of “the Boom” Environment and Aboriginal heritage comes second to industry: –Eg. Hope Downs and Weeli Wolli Creek in Pilbara –Eg. Windarling Range in Goldfields –Eg. Pluto LNG Plant on Burrup –Eg. … As development increases, more exploration, more mining, more problems for the environment Difficult to stop: Thin edge of the wedge Martu Idja Banyjima Traditional Owner Slim Parker speaking in front of flooded Weeli Wolli creek on YouTube and at Conservation Council event in Perth.

Ranking Sites is Premature Commend the commitment to process thus far, but only a start Complex decision in a complex time No need to rush