BIM Management – A Strategic Approach

Slides:



Advertisements
Similar presentations
Project Quality Plans Gillian Sandilands Director of Quality
Advertisements

PRD Group Maturity Matrix 31/07/08. Maturity Matrix Guidance Notes Aims of the Matrix The Maturity Matrix is a tool aimed to support groups during their.
Amitava Mitra, Solution Architect, Oracle Primavera, TCS
Building Information Management (BIM)
best practice project management methodology ©Platinum Services Group Limited What is XPRODi ?
MR1 Consulting ltd Collaborating for Business Performance
The Future in BIM Integrated Project Delivery Where’s the engagement in BIM gone?? BIM Proprietary Design CAM Fabrication Perceived to be too complex.
Test Automation Success: Choosing the Right People & Process
CIC Scope of Services Frances Paterson & Tony Broomhead.
Vice President of Facilities
An Intro to Professionalizing Procurement & Strategic Sourcing
Chapter 7: Key Process Areas for Level 2: Repeatable - Arvind Kabir Yateesh.
Envision – Architect – Prove Scott Mauvais Technical Director Microsoft Technology Center.
WORK GROUP ORGANISATION WORK GROUP LEADER (NBF) Reporting to the Cross Sectoral Steering Committee LEGAL TASK TEAM ToR (± 4 KPA's) FINANCIAL TASK TEAM.
CPIS 357 Software Quality & Testing I.Rehab Bahaaddin Ashary Faculty of Computing and Information Technology Information Systems Department Fall 2010.
A framework for describing IT Project Management Processes and Tool Set Features Enterprise Project Management Framework.
Program Management Overview (An Introduction)
Viewpoint Consulting – Committed to your success.
Supply Chain Development A step-change in Supply Chain performance 08/08/2015 OFFICIAL 1 Supply Chain Focus Group – 17 th September 2014 Vic Carlill.
Centers for IBM e-Business Innovation :: Chicago © 2005 IBM Corporation IBM Project Management May 2006.
Igal Kaptsan Research Director Applied Research, Bentley Systems Change Management.
Enterprise Architecture
Basel Accord IITRANSITIONSERVICES Business Integration Support FCM Management Limited Paris New York Toronto.
Release & Deployment ITIL Version 3
The Integration Story: Rational Quality Manager / Team Foundation Server / Quality Center Introductions This presentation will provide an introduction.
The BIM Project Execution Planning Procedure
Project Human Resource Management
RSA – Accenture Insurance Solution
Complete and Integrated Lifecycle Management. Challenges 1.
Construction Category Management Planning Version 1.1 (May 2015)
“I am absolutely delighted that the Department for Work and Pensions has confirmed Shaw Trust as the preferred bidder for 16 CPAs. This has enabled the.
QAD's Customer Engagement Dan Blake Consultancy Development Director, QAD QAD Explore 2012.
S/W Project Management
The Microsoft Office 2007 Enterprise Project Management Solution:
Certificate IV in Project Management Introduction to Project Management Course Number Qualification Code BSB41507.
Chapter 5 : Initiating and Planning Systems Development Projects.
Managing Engineering Design - Infrastructure. Presentation Overview 1.Tools and Techniques 2.Design and Documentation 3.Estimating and Scheduling.
MD Digital Government Summit, June 26, Maryland Project Management Oversight & System Development Life Cycle (SDLC) Robert Krauss MD Digital Government.
W. e. t INTERSERVE PRESENTATION 22/01/2015 Company Overview.
© The Delos Partnership 2005 Dairygold Workshop Supplier Relationship Management.
How eNet4S can benefit your project? eNet4S Software Solution Business Team Chief Technology Officer July 11, 2006.
Applying Business Process Re-engineering
Georgia Institute of Technology CS 4320 Fall 2003.
Bank Audit. Internal Audit Internal audit is an independent, objective assurance activity and can give valuable insight in providing assurance that major.
Paul Hardiman and Rob Brown SMMT IF Planning and organising an audit.
IT 499 Bachelor Capstone Week 4. Adgenda Administrative Review UNIT Four UNIT Five Project UNIT Six Preview Project Status Summary.
BSBPMG501A Manage Project Integrative Processes Manage Project Integrative Processes Project Integration Processes – Part 1 Diploma of Project Management.
Unit 18: CADD in Construction Lesson Objective Be able to explain the use of Building Information Modelling in buildings.
Lesson 1: Examining Professional Project Management Topic 1A: Identify Project Management Processes.
© Nano Time Limited – October 2008 Source Planning What –Analytical process that for creating procurement and supply strategies for key categories Wh y.
1A FAST EXCELLENCE THROUGH FACILITATION Gary Rush The FAST Process MGR Consulting
Illuminating Britelite’s Internal Services for Success Strategy for Process Improvement.
Info-Tech Research Group1 Manage the IT Portfolio World Class Operations - Impact Workshop.
Illuminating Britelite’s Internal Services for Success Strategy for Process Improvement.
Design Visualization Visualize building early in the process to support and accelerate the decision making process. Schedule Visualization Visualize construction.
Info-Tech Research Group1 Manage IT Budgets & Cost World Class Operations - Impact Workshop.
CHANGE READINESS ASSESSMENT Measuring stakeholder engagement and attitude to change.
Managing Multiple Projects Steve Westerman California Department of Motor Vehicles Steve Young Mathtech, Inc.
Introduction to SPA Trade Services PDA Work Flow Management Systems The Era of Change.
MIS Project Management Instructor: Sihem Smida Project Man agent 3Future Managers1.
Phase-1: Prepare for the Change Why stepping back and preparing for the change is so important to successful adoption: Uniform and effective change adoption.
Procurement Development Programs
Identify the Risk of Not Doing BA
MEP CoordinationMEP Coordination and Clash Detection is Extremely Significant for BIM-Know Why.
Guidance notes for Project Manager
Top Benefits of a BIM Consulting Firm for BIM Construction and the AEC industry Building Information ModelingBuilding Information Modeling or BIM Construction.
Add Engineering Value to your Project through BIM Preconstruction Services Preconstruction Services BIM Engineering U.S., L.L.C. – Best Preconstruction.
#BIM TOP BENEFITS OF IMPRESSIVE BIM CONSTRUCTION MANAGEMENT FIRMS & BIM PRECONSTRUCTION SERVICES #BUILDINGINFORMATIONMODELING BIM Engineering U.S.,L.L.C.
Portfolio, Programme and Project
CEng progression through the IOM3
Presentation transcript:

BIM Management – A Strategic Approach Rodd Perey

The Issue BIM has proven value in: Lowering costs Lowering risks Improving quality Reducing time to design and construct Providing a platform for facilities management Yet few projects are realising the benefits to the degree possible

BIM Can Deliver More! Commitment is lacking at all levels BIM deliverables are not identified Roles and Responsibilities are not defined and referenced in contracts The approach to delivery is ad hoc Various ‘BIM’ roles, often at cross-purposes Few of the known benefits of BIM are actually delivered No performance metrics for BIM: The benefits of BIM are hidden and BIM as a valuable process is undermined

Some Guidance

The Strategic Approach Set Goals and Objectives for BIM delivery Identify potential problems and limitations Create a Strategy for Success (that will deliver the BIM objectives and deal with problems and limitations) Enjoy the time, cost, quality and risk benefits of BIM!

Goals and Objectives Know your Client and their needs and capacity Understand the breadth of what is possible with BIM Workshop with the Project Team for their insight into opportunities and issues Document the agreed Goals (broad) and Objectives (specific) for the Project Identify priorities amongst the Goals and Objectives Establish team-wide commitment to goals and methods

Goals and Objectives Design Phase Goals and Objectives Optimise performance: Brief verification Performance simulation and analysis Design optimisation Code compliance checking BCA Accessibility Streamline approvals

Goals and Objectives Cost Estimation Direct from BIM Progressive managed move from area to elemental analysis Optioneering Bill of Quantities Reliable Documentation Specification tied to BIM Documentation integrity

Goals and Objectives Construction Phase Goals and Objectives IPD like collaborative process Early subcontractor engagement and design optimisation Adopt and Build Strategy Early subcontractor engagement Avoid double-up of effort between consultants and subcontractors

Goals and Objectives Construction Phase Goals and Objectives Construction Optimisation Construction logistics & Sequencing Fabrication models and the ‘shop model’ Design for off-site fabrication and assembly Site set‐out from BIM, by all subcontractors

Goals and Objectives Cut, thread and tag off-site Just-in-time delivery Demolition and waste management RFI reduction Re-work reduction CSA reduction Measuring the value of BIM OH&S improvement flow-on effects Cranage, hoardings and temporary structures

Goals and Objectives Coordination and Optimisation Clash detection Coordination with an automated agenda Tracking coordination issues

Goals and Objectives Cost Management Value Management Cash flow and progress payment management Manage cost as an integral part of the design process Improvement in costing precision with managed progression from zonal and area rates-based analysis to elemental analysis

Goals and Objectives Facilities Management As-built model   Facilities Management As-built model Asset management model combining information from BIM and non‐BIM sources Operations and Maintenance manual integration with BIM Integration with BMS database Compliance reporting BMS operation through BIM based ‘dashboard’ Integrated portfolio management Performance Verification

Tasks and Information Identify tasks related to delivery of each objective Identify the information requirements to deliver objectives Identify roles and responsibilities related to delivery of each objective Understand the project timeline Determine project team capabilities Establish team commitment to the identified deliverables

Solutions to Problems & Limitations Scope and Contractual Issues Workflow Issues Change Management Issues Technological Issues

Scope and Contractual Issues BIM to be included in scope from the start of the project Tasks necessary to delivery of goals and objectives must be included BIM to be included in the contractual relationships IP & PI issues IPD, co-location and other methods of delivery Legal advancements are required

Workflow Issues Different uses for the BIM Workflow synchronisation Process optimisation throughout the project team

Change Management Issues Ability of organisations to absorb change to processes Skills acquisition Attitudinal change

Technological Issues Software limitations Interoperability issues Structuring of BIM information Standards & protocols Information exchange

Strategy for Success Developed with consultation and expertise, and from experience BIM Execution Plan BIM Manual Bring the Team Together Publication Cycle Coordination Meetings Training, Secondments

BIM Execution Plan “The BIM Execution Plan is the key, from the contractors point of view, to getting value from the BIM: Systems and processes implemented at design commencement determine success on site.” Paul Nunn, National BIM Leader, Theiss Constructions

BIM Execution Plan Captures the Strategy Agreed goals and objectives Tasks and information requirements

BIM Execution Plan Captures the Strategy Agreed goals and objectives Tasks and information requirements Roles and responsibilities Methods for dealing with problems and limitations Aligns BIM tasks with the project programme Aligns BIM Strategy with industry initiatives such as AMCA’s BIM-MEPAUS, or developing BIM standards Create a structure for the use of BIM, with standards and protocols

BIM Manual Detailed information for use by modellers and those using the technology hands-on Product specific and detailed procedures Information Exchange process Structure for the model database information Detailed model usage guidelines Team communication workflow structure Protocols for consultant / subcontractor submissions Interoperability exchanges Advice on IT hardware and software requirements

Bring the Team Together Workshops keep the team focussed on the goals and objectives Introduce new players such as subcontractors to the BIM environment Provide feedback on new issues and possible improved processes Communication Channels Skills development and training methods

Execution Model publication cycle coordinated with project programme

Publication Cycle

Publication Cycle Keeps BIM aligned with the project program Provides a rigor to the delivery and quality of information and design development Identifies stragglers Allows assessment of the health of the design and delivery process

Execution Clash detection and model review Clash report analysis and prioritisation

Execution Prioritised clash notification to affected parties Coordination with an automated agenda Design/coordination meeting attendance and model navigation Coordination issues with Clash Status Matrix: Current status of clashes: resolved, outstanding, on-hold Clashes by discipline against discipline Clashes by building zone.

What Revit is, what its potential is, how we use it, and how you can use it.   How Fallback positions Revit Shells Transitional techniques Training – In-house training with pockets of expertise. In-house training keeps skills relevant, reinforces house style. Disseminates in house technique, makes areas problems obvious Learn skill and judgement. Have staff understand the rules. Identify areas of poor understanding. Always have a solution. Videoconference Getting large number of users up to expert level Remember that Revit is experienced as much as learned through standard training techniques. Element types have subtle differences that reflect building logic, documentation conventions, and the limitations of the software at present. Do some things another way. Manage expectations. Don’t expect graphics to match your existing standards without both doing some work and accepting some compromises. Needs a champion, needs someone senior to learn to a high skill level. I found Management Level best. Others have had problems with support. Large firm disadvantage Not backing the project Not backing the implementation Fussiness impatience and deadlines Not training Short course that only give part of the jigsaw. Revloution will not be easy. It will be necessary. Adapt as change to CAD When Now Use Norbrik example Lower cost and time Developing skills in the window of opportunity Developing content, building in quality standards Expanding opportunities for integration: With consultants With client organizations Expanded business provision extra information sharing savings Learn and gain content from every project

Track performance

Coordination Meetings Deal with clash and other identified issues Automated issue (clash and other) listing provides meeting agenda Meeting can be subdivided Deal with the huge number of issues Make BIM integral to the process Replace shop drawings Shift focus from 2D paper drawings

Training and Secondments Often necessary for change management Provide both training and additional resources at critical times Deal with recalcitrance Make delivery possible for all parties, necessary to provide complete BIM

Conclusion BIM is capable of delivering reduced time, cost and risk at better quality across a range of project activities if it is managed in a strategic way Identify the outcomes Identify the issues that may prevent successful delivery Plan a strategy for success