BPA FUNDED PIT TAG SYSTEM INVESTMENT A rough cost estimate of the existing infrastructure for PIT tag data collection for BPA funded and PSMFC maintained.

Slides:



Advertisements
Similar presentations
Smolt Monitoring Program 1982-Present BPA project#
Advertisements

CONFEDERATED TRIBES OF THE UMATILLA INDIAN RESERVATION Walla Walla River Juvenile and Adult Walla Walla River Juvenile and Adult Fish Passage Improvements.
Workshop: Monitoring and Evaluation of Harvest on Columbia River Salmonids July 31- August 1, 2007.
New Marking and Monitoring Techniques for Fish BPA Project Presenter: Sandra L. Downing (NMFS - NWFSC) New name: Development and Evaluation of.
Survival Estimates for the Passage of Juvenile Salmonids Through Dams and Reservoirs of the Lower Snake and Columbia Rivers (Project ) CBFWA March.
Evaluation of Juvenile Salmonid Outmigration and Survival in the Lower Umatilla River Project No Tara White, Shannon Jewett, Josh Hanson,
ISO Adult PIT Interrogation System Installations BPA Project Number July
Columbia Basin Pit Tag Information System BPA Project Number July
Assessment of Bull Trout Populations in the Yakima River Watershed.
Spatial scales of homing and the efficacy of hatchery supplementation of wild populations Northwest Fisheries Science Center National Marine Fisheries.
Growth and Development of the Columbia Basin PIT Tag Information System Growth and Development of the Columbia Basin PIT Tag Information System Overview.
1 Bonneville 2 nd Powerhouse Corner Collector PIT Tag Detection System Project Bonneville Power Administration and U.S. Army Corps of Engineers – Portland.
Looking for Pieces of the Puzzle: LIFE HISTORY OF SPRING CHINOOK IN THE WILLAMETTE BASIN Kirk Schroeder Brian Cannon Luke Whitman Paul Olmsted Oregon Department.
NMFS, PTAGIS, SNKTRP, CJS and SURPH Steven G. Smith Northwest Fisheries Science Center National Marine Fisheries Service 2004 PIT Tag Workshop.
Case Study: Idaho Naturally Produced Chinook with Focus on Middle Fork Salmon River Sharon W. Kiefer Idaho Dept. Fish and Game October, 2012.
Overview of Current Production Programs Across the Columbia River Basin.
Evaluation of a Prototype Spillway Transceiver Gordon Axel, Dr. Sandy Downing, Bruce Jonasson, and Gabriel Brooks Northwest Fisheries Science Center Fish.
C. A. Peery, M. L. Keefer, and S. R. Lee Idaho Cooperative Fish and Wildlife Research Unit U.S. Geological Survey and Northwest Fisheries Science Center.
Using PIT Tags to monitor and evaluate survival of reconditioned kelt steelhead in the Yakima River Basin Presented by: Bill Bosch Yakama Nation Fisheries.
Assessing the use of PIT Tags as a Tool to Monitor Adult Chinook Salmon Returns to Idaho John Cassinelli Regional Fisheries Biologist Idaho Department.
Emerging PIT-tag Technologies Presenter: Sandra Downing Ideas and information supplied by numerous people For NPCC Fish Tagging Forum – March 22, 2012.
Spatial and Temporal Distribution of Adult Summer Steelhead in Asotin Creek, Washington Ethan Crawford and Michael Herr Washington Department of Fish &
In-Stream PIT-Tag Detection of Resident Salmonids in Washington's White Salmon River Watershed: One System ’ s Saga. Ian G. Jezorek 1, Patrick J. Connolly.
Evaluation of the PIT-Tag Detection Arrays in the Priest Rapids Dam Adult Ladders Steve Anglea, Anthony Carson – Biomark, Inc. Eric Lauver – Grant County.
Figure 1. Photograph looking upstream at the south fish ladder and training spill from bay 18, Bonneville Dam, April 4, Spill bay 18 South fish ladder.
Christopher Caudill, Charles Boggs, Eric Johnson, and Matthew Keefer
Development of the Lower Snake River Compensation Plan: A Brief History Scott Marshall LSRCP Program Administrator U.S. Fish & Wildlife Service.
New PIT-tag Technologies Presenter: Sandra Downing Ideas and information supplied by numerous people (fortunately, I am sure there are a lot more new technologies.
Slide 1 B O N N E V I L L E P O W E R A D M I N I S T R A T I O N McNary Dworshak Anderson Ranch Palisades Ice Harbor Grand Coulee Revelstroke Lower Monumental.
Development of Weir-Wall Contour-Matching PIT Tag Antennas for John Day Dam Adult Ladders PTAGIS Field Office Kennewick, Washington April 2015.
Survival of Migrating Salmonid Smolts in the Snake and Lower Columbia Rivers, 2009 Technical Management TeamDecember 11, 2009 Lessons Learned 2009 Bill.
Hydrosystem Operations and Fish Recovery in the Columbia River Basin U
Documenting O. mykiss life histories in the White Salmon River prior to the reintroduction of anadromous fish above Condit Dam. Brady Allen and Patrick.
B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Page 1 Smart grid in the Pacific Northwest – best practices from the largest demo project in.
May 10, 2012 Presented by Micki Varney Oregon Department of Fish and Wildlife.
BUILDING STRONG ® PORTLAND DISTRICT 1. BUILDING STRONG ® PORTLAND DISTRICT 2 BiOp Performance Standards for Dam Passage Survival RPA RM&E Actions - Strategy.
PTAGIS Field Operations Antenna and Gate Efficiencies Antenna efficiencies at all PTAGIS maintained sites remained near 100% (except for the BCC.
Washington’s Lower Snake River Compensation Plan Steelhead Program – A retrospective and program adaptive management overview Mark Schuck and Joe Bumgarner.
Evaluation of yearly and geographic variation in early male maturation in hatchery and wild spring Chinook salmon from the Yakima River, Washington. Don.
Effectiveness of alternative broodstock, rearing and release practices at Winthrop NFH William Gale and Matt Cooper -USFWS, Mid-Columbia River Fishery.
Steelhead Kelt Reconditioning Program Update Presented by: Bill Bosch, Yakama Fisheries Acknowledgements: D. Fast, M. Johnston, T. Newsome Prosser Hatchery.
Downstream Survival of Juvenile Stream Type Chinook Salmon and Steelhead Through the Snake/Columbia River Hydropower System and Adult Return Rates AFEP.
Development of Bolt-on Low Profile Overflow / Orifice PIT Tag Antennas for John Day Dam Adult Ladders PTAGIS Field Office Kennewick, Washington November.
October 20 & 21, 2009 Stevenson, WA Columbia Basin Coordinated Anadromous Monitoring Strategy Workshop Lower Columbia Sub-Basin.
CRITFC Video Smolt Project Developed in response to Fish Passage Center interest to see if video could be substituted for at least some of the handling.
Cost and Energy Impacts of Fish and Wildlife Operations NW Power Planning Council April 3, 2002 Boise, Idaho.
2005 Subyearling Migration Fish Passage Center. Overview – summer migration Court ordered summer spill occurred from June 20 to August 31, 2005 Question.
Yakima Steelhead VSP Project: Resident/Anadromous Interactions Gabriel M. Temple 1913 “Landlocked Steelhead”
Columbia River Basin Fish Restoration Activities ACCOMPLISHMENTS TO DATE AND UPCOMING ISSUES Bonneville Legal Briefing – October 2015.
Parr and smolt yield, migration timing, and age structure in a wild steelhead population, Fish Creek, Idaho Alan Byrne Idaho Department of Fish and Game.
Performance of a New Steelhead Line Derived from Hatchery Parents Collected in Autumn in the Grande Ronde River Lance Clarke, Michael Flesher, Shelby Warren,
Upstream passage success rates and straying of returning adults Presenter: Jack Tuomikoski CSS Annual Meeting Apr 2 nd 2010.
Historical Review Fish Migration Data. Two Management Approaches Spill for Fish Passage Planning dates Percent passage dates.
B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Slide 1 FEDERAL ENVIRONMENTAL SYMPOSIUM (West) – 6/3/09 Implementing Energy Efficiency in Remote.
Proposed PIT Tag Antenna Arrays for Bonneville Dam PH1 Ice and Trash Sluice Way PTAGIS Field Office Kennewick, Washington June 2015.
Northwest Fisheries Science Center Technical Management Team
Comparative Survival Study Annual Meeting
Age at ocean entry of Snake River Basin fall Chinook and its significance to adult returns prior to summer spill at LGR, LGS, and LMN dams.
Middle Fork Project Entrainment Direct Sampling Approach (Contingency Study) September 8, 2008.
Comparative Survival Study Project #
Northwest Fisheries Science Center Technical Management Team
2017 TMT Year-end Review December 12, 2017 Brandon R. Chockley
Taneum Creek PIT Tag Interrogation Site
Roza Dam Evaluation Post Modifications
Direct Survival of Migrating Salmonid Smolts in the Snake and Lower Columbia Rivers: Update with 2007 Results Northwest Power and Conservation Council.
Juvenile Salmonid Predation
On Recruitment of Steelhead in Mid Columbia Subbasins
Adult PIT-tag Interrogation System Wells Hydroelectric Project (System Design, Installation and Evaluation)     Shane Bickford* Public Utility District.
Columbia Basin Coordinated Anadromous Monitoring Strategy Workshop
Modifications to TDG Monitoring and Tracking
Presentation transcript:

BPA FUNDED PIT TAG SYSTEM INVESTMENT A rough cost estimate of the existing infrastructure for PIT tag data collection for BPA funded and PSMFC maintained sites.

As of April 6, 2010 INTRODUCTION This presentation is a rough estimate of investment that has been funded by the BPA for PIT tag detection and data collection in the Columbia Basin since the switchover from the 400kHz system to the existing ISO 134.2kHz systems. This does not include any projects that are currently in place on the upper Columbia which are funded primarily through various PUD’s. The following slides will present the overall investment with a breakdown of each individual location that PSMFC currently provides the operation and maintenance (O&M). It will also provide a brief history of each location along with information on the life span of the current technologies that are used in the collection of the PIT tag data. It does not take into account the cost of construction for most of the Juvenile Fish Facilities which were already in existence when the switchover occurred but were modified to accept the new detection systems.

As of April 6, 2010 Antenna and Transceiver Association Typical Juvenile 2 coil Monitor FS1001 Transceiver Installed in 2000

As of April 6, 2010 Antenna and Transceiver Association Original Orifice style Antenna FS1001A Transceiver First installed in 2001

As of April 6, 2010 Antenna and Transceiver Association Counting Window Antenna FS1001A Transceivers First Installed in 2002

As of April 6, 2010 Antenna and Transceiver Association Full Flow Antennas FS1001A or FS1001B First Installed in 2003

As of April 6, 2010 Antenna and Transceiver Association Large Slot Antenna FS1001B First Installed in 2005

As of April 6, 2010 Antenna and Transceiver Association Bonneville Corner Collector Antenna 15’2” X 15’2” I.D. BCC Transceiver Installed in 2006

As of April 6, 2010 Project Agencies Portland District COE – There are seven (7) separate PIT tag interrogation sites located at two (2) hydroelectric dams, Bonneville and John Day, located on the Columbia River. These sites facilitate both Juvenile and Adult detection systems. These dams can be populated by more than one (1) interrogation site. Walla Walla District COE – There are eight (8) separate PIT tag interrogation sites located at five (5) hydroelectric dams on the Columbia and Snake Rivers, McNary, Ice Harbor, Lower Monumental, Little Goose, and Granite. These sites facilitate both Juvenile and Adult detections. Some dams are populated by more than one (1) interrogation site. Yakama Nation – There are five (5) separate PIT tag interrogation locations on the Yakima River and one (1) on the North fork of the Teneway River located outside of Cle Elum, WA.

As of April 6, 2010 Agency Totals Portland District – The total for all projects under the Portland District COE is estimated to be $14M. This includes the cost of the corner collector antenna, which is currently the largest PIT tag detecting antenna. Walla Walla District – The total for all projects under the Walla Walla district COE is estimated to be $10.2M. This includes the Little Goose full flow project which was completed in Spring of Yakama Nation – The total for all projects under the Yakama Nation are estimated to be $464K. This estimate does not include the project on the Klickitat river. These figures were estimated from the time of the changeover from 400kHz to the present ISO PIT tag detection systems. When possible PSMFC used construction figures provided by each COE district and added the cost of the electronics installed.

As of April 6, 2010 Portland District Site Description Bonneville Juvenile Fish Facility (B2J) – including the 48” Full Flow collection channel pipe (B2JFF). Washington Shore ladder (BO3) – Original orifice style antennas including the Adult Fish Facility (AFF). Washington Shore ladder exit (BO4) – Large slot antennas located at the exit of the ladder. Cascade Island ladder (BO2) – Original orifice style antennas. Bradford Island ladder (BO1) – Original style orifice antennas and the large slot style antennas located at the exit of the ladder. John Day Juvenile Fish Facility (JDJ) – Including the Full Flow collection channel flume (JDJFF).

As of April 6, 2010 Walla Walla District Site Descriptions McNary Juvenile Fish Facility (MCJ) – Including the 36” Full Flow collection channel pipe (MCJFF). Oregon Shore Ladder (MC1) – Original style orifice antennas including the counting window slot style antennas. Washington Shore Ladder (MC2) – Original style orifice antennas including the counting window slot style antennas. Ice Harbor North and South Ladders (ICH) – Slot and orifice antenna types. Including the 36” Full Flow collection channel pipe.

As of April 6, 2010 Walla Walla District Site Descriptions cont. Lower Monumental Juvenile Fish Facility (LMJ) – Including the 36” Full Flow collection channel pipe. Little Goose Juvenile Fish Facility (GOJ) – Including the 36” Full Flow collection channel pipe. Lower Granite Juvenile Fish Facility (GRJ). Lower Granite Adult Ladder (GRA) – Including the Adult Fish Trap.

As of April 6, 2010 Yakama Nation Site Descriptions Prosser (PRO) – This site combines the Juvenile Fish Facility (JFF), located ~1/2 mile below Chandler Diversion Dam, and the three (3) counting window stations located within Chandler Diversion Dam. Rosa Dam Ladder (RZF) – Consists of three (3) pass-through style ladder antennas. Clark Flat Acclamation Pond (CFJ) – This an acclamation facility located West of Thorp, Wa. on the Yakima River. Easton Acclamation Pond (ESJ) – This an acclamation facility located North of Easton, Wa. on the Yakima River. Jack Creek Acclamation Pond (JCJ) – This is an acclamation facility located ~15 miles North of Cle Elum, Wa. on the North Fork of the Teneway River. This site is unique in that there is no commercial power or communications. The facility is powered by generators and the data communications are supplied by satellite internet.

As of April 6, 2010 Site Illustration – Granite Adult

As of April 6, 2010 Site Breakdown - GRA Site originally consisted of two (2) five coil monitors located in the adult fish trap. In 2001, the two monitors were modified to accommodate both 400kHz and 134.2kHz ISO detectors. In 2003, the fish ladder was modified to accept slot and orifice style antennas in the upper weirs and the fish trap monitors were modified for only 134.2kHz ISO coils and detectors. Adult Ladder Project cost$1.3M 5 Slot Antennas ea.$50K 5 Orifice ea.$35K 8 FS1001A type ea.$48K 8 FS1001 ea.$48K 4 shielded monitor ea.$28K Programmable Logic Controller (PLC)$9K PIT tag Data Electronics Building$15K Total~$1.533M

As of April 6, 2010 Site Illustration – Granite Juvenile

As of April 6, 2010 Site Breakdown - GRJ This site required no initial construction. There was some modification necessary for the ISO transition. ISO transition completed in (2) coil shielded ea.$98K 26 ea$156K Programmable Logic Controller (PLC)$9K PIT tag Data Electronics Room$15K Total$268K

As of April 6, 2010 Site Illustration – Little Goose

As of April 6, 2010 Site Breakdown – GOJ In 2000, the Juvenile facility was modified for the ISO transition. In 2009, a Full Flow Detection system was completed. 16 (2) coil shielded ea.112K 28 FS1001 ea.168K Programmable Logic Controller9K Full Flow Antenna Project~1M 4 FS1001A ea24K PIT tag Data Electronics Room15K Total~1.33M

As of April 6, 2010 Site Illustration – Lower Monumental

As of April 6, 2010 Site Breakdown – Lower Monumental In 2000, the Juvenile facility was modified for the ISO transition. In 2006, the Adult Fish return was modified for detection. In 2007, a Full Flow Detection system was installed. Full Flow Antenna project1.13M 18 (2) coil shielded ea.126K 31 FS1001 ea.181K 4 FS 1001A ea.24K Programmable Logic Controller9K PIT tag Data Electronics Room15K Total~1.485M

As of April 6, 2010 Site Illustration – Ice Harbor

As of April 6, 2010 Site Breakdown – Ice Harbor In 2003, the upper portions of both the North and South ladders were modified for removable slot and orifice antennas. In 2004, a Full Flow detection system was installed. Ladder Project Cost1.3M Full Flow Project Cost~1M 10 Small Slot ea.100K 10 Orifice ea.70K 20 FS1001A ea.120K Water Level Detection System6K PIT tag Data Electronics Room15K Total~2.6M

As of April 6, 2010 Site Illustration – McNary Juvenile

As of April 6, 2010 Site Breakdown – McNary Juvenile In 2000, the Juvenile facility was modified for the ISO transition. In 2003, the Adult Fish return was modified for detection. In 2003, a Full Flow Detection system along with two slide gates were incorporated into PSMFC data collection. Full Flow Antenna project~1M 26 (2) coil shielded ea.182K 45 FS1001 ea.270K 4 FS 1001A ea.24K Programmable Logic Controller9K PIT tag Data Electronics Room15K Total~1.5M

As of April 6, 2010 Site Illustration – McNary Oregon Ladder

As of April 6, 2010 Site Breakdown – McNary Oregon Ladder In 2001, the ladder was modified to accept the original style orifice antennas. In 2001, the Counting Window was modified for two (2) slot antennas. Ladder Project Cost241K Counting window project cost82K 17 orifice ea.102K 3 small Slot 18 FS1001A ea.108K PIT tag Data Electronics Room15K Total~578K

As of April 6, 2010 Site Illustration – McNary Washington Ladder

As of April 6, 2010 Site Breakdown – McNary Washington Ladder In 2001, the ladder was modified to accept the original style orifice antennas. In 2006, the Counting Window was modified for two (3) slot antennas. Ladder Project Cost342K Counting window project cost220K 17 orifice ea.102K 4 small Slot 19 FS1001A ea.114K PIT tag Data Electronics Room15K Total~833K

As of April 6, 2010 Site Illustration – John Day Juvenile

As of April 6, 2010 Site Breakdown – John Day Juvenile In 2000, the Juvenile facility was modified for the ISO transition. In 2005, the Adult Fish return was modified for detection. In 2007, a Full Flow Detection system was installed. Full Flow Antenna project1.6M 13 (2) coil shielded ea.91K 26 FS1001 ea.156K 4 FS 1001A ea.24K Programmable Logic Controller9K PIT tag Data Electronics Room15K Total1.624M

As of April 6, 2010 Site Illustration – Bonneville Bradford Island Ladder

As of April 6, 2010 Site Breakdown – Bonneville Bradford Island In 2001, the “A” and “B” branches of the ladder were modified to accept the original style orifice antennas. In 2006, the upper portion of the ladder was modified to accept four (4) large slot antennas. Ladder Project Cost600K Large Slot Project Cost 1.38M 33 orifice ea.198K 6 Large Slot 32 FS1001A ea.192K 4 FS1001B ea24K PIT tag Data Electronics 10K Total~2.48M

As of April 6, 2010 Site Illustration – Bonneville Cascade Island Ladder

As of April 6, 2010 Site Breakdown – Bonneville Cascade Island Ladder In 2001, the ladder was modified to accept the original style orifice antennas. Ladder Project Cost600K 17 orifice ea.102K 16 FS1001A ea.96K PIT tag Data Electronics 10K Total808K

As of April 6, 2010 Site Illustration – Bonneville Washington Ladder

As of April 6, 2010 Site Breakdown – Bonneville Washington Ladder In 2001, the Adult monitors in the AFF were modified to accommodate both the ISO system and the 400kHz systems. In 2001, NMFS installed 20 of the original orifice antennas. In 2002, these sites were combined into one interrogation site. In 2003, the 400kHz system was removed and four (4) ISO systems were installed. Ladder Project Cost500K 25 Original Orifice ea.150K 4 (2) coil shielded ea.28K 24 FS1001A ea.144K 8 FS1001 PIT tag Data Electronics Room15K Total885K

As of April 6, 2010 Site Illustration – Bonneville Washington Shore Slot

As of April 6, 2010 Site Breakdown – Bonneville Washington Shore Slot In 2005, the upper part of the ladder was modified to accept 4 large slot style antennas. Ladder Project Cost1.3MK 6 Large Slot ea.120K 4 FS1001B ea.24K PIT tag Data Electronics 10K Total1.45M

As of April 6, 2010 Bonneville Corner Collector Bonneville Corner Collector antenna install on the left Completed production image pictured on the right Installed in 2006

As of April 6, 2010 Site Breakdown – Bonneville Corner Collector Construction began in late 2005 and continued through early The Data collection system was placed into production in April of This is the largest PIT tag detection system to date. BCC Project Costs3.3M BCC Antenna and Electronics~1.7M Total~5M

As of April 6, 2010 Site Illustration – Bonneville Juvenile

As of April 6, 2010 Site Breakdown – Bonneville Juvenile In 2000, the ISO transition was completed after the Smolt Monitoring Facility was completed. In 2001, a new Sample monitor was installed. In 2006, the Full Flow detectors were installed. Full Flow Project Cost1.3M 8 (2) coil shielded ea.56K 15 FS1001 ea.90K 4 FS1001B ea.24K Programmable Logic Controller9K PIT tag Data Electronics Room15K Total1.494M

As of April 6, 2010 Site Illustration – Prosser

As of April 6, 2010 Site Breakdown - Prosser In late 1999, the Juvenile facility underwent the ISO transition. In 2004, the Left Bank Ladder Counting Window antennas were installed. In 2005, the Center and Right Bank Ladder Counting Windows were installed. Left Bank Ladder Project Cost70K Center and Right Bank Project Cost130K 7 Small Slot ea.56K 3 (2) coil shielded ea.21K 5 FS1001 ea.30K 7 FS1001A ea.42K 6 Electronic ea.30K 14 Freewave Radio Modems ea.28K PIT tag Data Electronics Room15K Total422K

As of April 6, 2010 Site Illustration – Rosa Dam

As of April 6, 2010 Site Breakdown – Rosa Dam In 2007, the Yakama Nation installed three (3) pass-through overflow weir antennas. 4 Pass-through ea.38.4K 4 ea.24K 4 Electronic ea.28K Satellite ea.1K PIT tag Data Electronics Room15K Total106.4K

As of April 6, 2010 Site Illustration – Easton Acclamation Pond

As of April 6, 2010 Site Illustration – Clark Flat Acclamation Pond

As of April 6, 2010 Site Illustration – Jack Creek Acclamation Pond

As of April 6, 2010 Site Breakdown – Yakama Acclamation Ponds In 1999, all three (3) acclamation sites were setup with 400kHz detection equipment. In 2000, Biomark installed the new ISO detectors. In 2001, PSMFC was asked to take over O&M of the equipment. 2 (2) coil shielded monitors ea.16K 4 FS1001 ea.24K Satellite Communications1K PIT tag Data Electronics 10K Totalfor each facility53K Total for all three (3)153K

As of April 6, 2010 Portland District Breakdown SiteProject Total($)Project Year B2J 170K2000 B2JFF1.33M2006 BO1 Ladder994K2001 BO1 Slot1.45M2006 BO2802K2001 BO3885K2001 BO41.45M2005 Bonneville Corner Collector5M2005 JDJ271K2000 JDJFF1.63M2007 TOTAL~14M

As of April 6, 2010 Walla Walla District Breakdown SiteProject Total($)Project Year GRA1.53M2001/2003 GRJ268K2000 GOJ304K2000 GOJFF~1M2009 LMJ331K2000 LMJFF1.13M2007 ICH1.59M2003 ICHFF~1M2005 MCJ376K2000 MCJFF~1M2003 MC1 w/Counting Window578K2002 MC2 w/Counting Window833K2002/2006 Total~10M

As of April 6, 2010 Yakama Nation Breakdown SiteProject Total($)Project Year Cle Elum Acclamation Ponds153K2000 Prosser Juvenile (PRO)66K2000 Prosser Ladder (PRO)356K Rosa Dam (RZF)85K2007 Total664K

As of April 6, 2010 Final Total These figures were calculated using COE figures when possible but in some instances the figures needed to be approximate to the time frame in which the work was done. Portland District$14M Walla Walla District$10M Yakama Nation$664K Total~$24.9M