WG 3 Progress Report at TP12 Group Name: oneM2M TP12 Source: Raymond Forbes, LM Ericsson, Meeting Date: 2014-07-28 to 2014-08-01.

Slides:



Advertisements
Similar presentations
WG 2 Progress Report to TP#13 Group Name: oneM2M TP#13 Source: WG2 leadership Meeting Date: / Agenda Item: TP#13, Item 10, Reports.
Advertisements

Problem of non-Blocking Synchronous mode Group Name: ARC WG Source: Yuan Tao, Mitch Tseng, Huawei Technologies Meeting Date: ARC 15.0 Agenda Item: TBD.
WG PRO Progress Report at TP17 Group Name: oneM2M TP17 Source: Raymond Forbes, LM Ericsson, Meeting Date: to
WG-2 - ARC TP #17 Status Report Group Name: oneM2M TP #16 Source: WG2 Chair (Nicolas Damour – Meeting Date: Agenda.
WG5 - MAS Progress Report at TP #12 Group Name: WG5 MAS (Management, Abstraction & Semantics) Source: Yongjing Zhang (Huawei, WG5 Chair) Meeting Date:
WG5 - MAS Progress Report at TP #17 Group Name: WG5 MAS (Management, Abstraction & Semantics) Source: Yongjing Zhang (Huawei, WG5 Chair) Meeting Date:
TST WG Progress Report at TP 15 Group Name: TST WG Source: TST WG Chair, JaeSeung Song (KETI) Meeting Date: to , Miami, USA Agenda.
Method of Converting Resource definitions into XSD Group Name: WG3 (PRO) Source: Shingo Fujimoto, FUJITSU, Meeting Date:
TST WG Progress Report at TP 18 Group Name: TST WG Source: TST WG Chair, JaeSeung Song (KETI) Meeting Date: to Agenda Item: TP18,
TST WG Progress Report at TP 17 Group Name: TST WG Source: TST WG Chair, JaeSeung Song (KETI) Meeting Date: to , Sapporo, Japan Agenda.
Progressing the Work on the MAS TR-0006, TR-0007 Group Name: Management Abstraction and Semantics Source: Tim Carey, ALU,
Status of Active New Work Items Group Name: WPM Source: Karen Hughes, ETSI Updated:
Introduction of PRO WG activities Group Name: TP Source: Shingo Fujimoto, FUJITSU, Meeting Date: Agenda Item:
Status of Active New Work Items Group Name: WPM Source: Karen Hughes, ETSI Meeting Date:
WG 3 Progress Report at TP13 Group Name: oneM2M TP13 Source: Raymond Forbes, LM Ericsson, Meeting Date: to
WG-2 - ARC TP #16 Status Report Group Name: oneM2M TP #16 Source: WG2 Chair (Nicolas Damour – Meeting Date: Agenda.
Work Programme Management Ad hoc Group Report Group Name: one M2M TP9 Source: Convenor WPM Joachim Koss, Gemalto M2M,
WG 3 Progress Report at TP14 Group Name: oneM2M TP14 Source: Raymond Forbes, LM Ericsson, Meeting Date: to
Discussion on the problem of non- Blocking Synchronous mode Group Name: ARC WG Source: Yuan Tao, Mitch Tseng, Huawei Technologies Meeting Date: ARC 15.2.
App-ID Discussion Group Name: ARC WG Source: Seongyoon Kim, LG Electronics, Meeting Date: 31 July 2014 Agenda Item: TBD.
WG 2 Progress Report at TP #8 Group Name: oneM2M TP #8 Source: WG2 leadership Meeting Date: /13 Agenda Item: WG Reports.
WG1 status report to TP#17 Group Name: oneM2M TP17 Source: Shelby Kiewel (iconectiv) Meeting Date: to Agenda Item: TP#17, Item 10.3,
Response Status Codes Concepts for oneM2M Group Name: WG3 Source: Philip Jacobs, Cisco, Meeting Date: Agenda Item: TS-0004.
Supporting long polling Group Name: ARC WG Source: SeungMyeong, LG Electronics, Meeting Date: x-xx Agenda Item: TBD.
WG5 - MAS Progress Report at TP #9 Group Name: WG5 MAS (Management, Abstraction & Semantics) Source: Yongjing Zhang, Chair, Meeting.
Customized Resource Types MAS Group Name: MAS + ARC + PRO WGs Source: Wolfgang Granzow, Qualcomm Inc., Meeting Date:
Discussion on the problem of non- Blocking Synchronous mode Group Name: ARC WG Source: Yuan Tao, Mitch Tseng, Huawei Technologies Meeting Date: ARC 15.2.
WG5 - MAS Progress Report at TP #10 Group Name: WG5 MAS (Management, Abstraction & Semantics) Source: WG5 Chairs Meeting Date: to
WG 3 Progress Report at TP #7 Group Name: oneM2M TP #7 Source: Raymond Forbes, LM Ericsson, Meeting Date: /18 Agenda.
Work Programme Management Ad hoc Group Report Group Name: one M2M TP13 Source: Convenor WPM Nicolas Damour, Meeting Date:
WPM ad-hoc group report TP#17 closing Group Name: WPM (TP adhoc) Source: convener WPM Roland Hechwartner, Meeting Date:
WG 3 Progress Report at TP15 Group Name: oneM2M TP15 Source: Raymond Forbes, LM Ericsson, Meeting Date: to
TP WG1 status report to TP#16 Group Name: oneM2M TP16 Source: Shelby Kiewel (iconectiv) Meeting Date: to Agenda Item: TP#16,
TST WG Progress Report at TP 19 Group Name: TP Source: TST WG Chair, JaeSeung Song (KETI) Meeting Date: to Agenda Item: TP19, Item.
WG 2 Progress Report at TP#9 Group Name: oneM2M TP #9 Source: WG2 leadership Meeting Date: /21 Agenda Item: WG Reports.
SEC Conference calls following TP#11 Group Name: WG4 (SEC ) Decision  Meeting Date: Discussion  Source: OBERTHUR Technologies Information.
ARC ordinary F2F meeting Seoul, June 2013 WG2 MEETING NOTES.
WG-2 - ARC TP #18 Status Report Group Name: oneM2M TP #18 Source: WG2 Chair (Nicolas Damour – Meeting Date: Agenda.
PRO/ARC and TST/PRO joint sessions at TP20 Group Name: oneM2M TP20 Source: Peter Niblett, IBM Meeting Date:
TST WG Progress Report at TP #20 Group Name: TP Source: TST WG Chair, JaeSeung Song (KETI) Meeting Date: to Agenda Item: TP20, Item.
Protocol Issues related to Plugtest Group Name: TST Source: Wolfgang Granzow, Qualcomm Inc., Meeting Date: Agenda.
WG1 status report to TP#21 Group Name: oneM2M TP21 Source: Shelby Kiewel (iconectiv) Meeting Date: to Agenda Item: TP#21, Item 10.4,
WG5 – MAS#21 Status Report Group Name: WG5 MAS (Management, Abstraction & Semantics) Source: Yongjing Zhang (Huawei, WG5 Chair) Meeting Date:
TST WG Progress Report at TP 18 Group Name: TP Source: TST WG Chair, JaeSeung Song (KETI) Meeting Date: to Agenda Item: TP18, Item.
WG 3 Progress Report at TP10 Group Name: oneM2M TP10 Source: Raymond Forbes, LM Ericsson, Meeting Date: to
WG2 - ARC TP #20 Status Report Group Name: oneM2M TP #20 Source: WG2 Chair (Nicolas Damour – Meeting Date: Agenda.
WG2 PRO Status Report at TP19 Group Name: oneM2M TP19 Source: Peter Niblett, IBM Meeting Date: to Agenda Item: TP19, Item 10.3, Reports.
Call for input from WGs on things to test Group Name: TST Source: Jiaxin Yin, Huawei Technologies Co., Ltd., Meeting Date:
WG5 - MAS Progress Report at TP #8 Group Name: WG5 MAS (Management, Abstraction & Semantics) Source: Yongjing Zhang, Chair, Meeting.
WG1 status report to TP#20 Group Name: oneM2M TP20 Source: Joerg Swetina (NEC) Meeting Date: to Agenda Item: TP#19, Item 10.4, Reports.
Authorization Architecture Discussion Group Name: SEC WG Source: Seongyoon Kim, LG Electronics, Meeting Date: 28 MAY, 2014 Agenda.
TP WG1 - REQ Progress Report at TP #14 Group Name: WG1 REQ (Requirements) Source: WG1 Vice Chair (Joerg Swetina, NEC), Secretary Changho RYOO,
WG5 – MAS#22 Status Report Group Name: WG5 MAS (Management, Abstraction & Semantics) Source: Tim Carey(Alcatel-Lucent, WG5 Vice Chair) Meeting Date:
Status of Active Work Items Summary Group Name: TP Source: Roland Hechwartner, WPM Convenor Updated: source: TP_WPM R08-New_Work_Item_Status_Report.
WPM ad-hoc group report TP#20 Group Name: WPM (TP adhoc) Source: convener WPM Roland Hechwartner, Meeting Date:
WG1 - REQ Progress Report at TP #11 Group Name: WG1 REQ (Requirements) Source: WG1 Vice Chairs Meeting Date: to Agenda Item: TP#11,
Discussion for Testing related Activities Group Name: TP Source: JaeSeung Song, KETI, Meeting Date: Agenda.
TS-0004 guideline for new resource type definition Group Name: PRO WG Source: SeungMyeong JEONG, LG Electronics Meeting Date: Agenda Item: TS.
Joint PRO/ARC session at TP20 Group Name: oneM2M TP20 Source: Peter Niblett, IBM Meeting Date:
WG5 – MAS#23 Status Report Group Name: WG5 MAS (Management, Abstraction & Semantics) Source: Yongjing Zhang (Huawei, WG5 Chair) Meeting Date:
WG5 – MAS#24 Status Report Group Name: WG5 MAS (Management, Abstraction & Semantics) Source: Yongjing Zhang (Huawei, WG5 Chair) Meeting Date:
MIME Type Definition Group Name: PRO WG
WG2 - ARC TP#29 Status Report
WPM ad-hoc group report TP#24
WG1 status report to TP#15 Group Name: oneM2M TP15
oneM2M Service Layer Protocol Version Handling
WPM ad-hoc group report TP#25
WG2 - ARC TP#29 Status Report
Considering issues regarding handling token
Status of Active New Work Items
Presentation transcript:

WG 3 Progress Report at TP12 Group Name: oneM2M TP12 Source: Raymond Forbes, LM Ericsson, Meeting Date: to Agenda Item: TP#12, Item 10, Reports from Working Groups

Issues for DECISION in TP © 2013 oneM2M Partners 2 Result – TS-0004 v0.6.1 (Core Protocol) Rapporteurs: Shingo Fujimoto & Nobuyuki Uchida see PRO R01 V0.6.1 – TP Progress at 70% – Available to TP.12 for inclusion into Release Aubergine – TS-0008 v0.5.0 (CoAP Protocol Binding) Rapporteur: SeongYoon Kim see PRO v0.5.0 – TP Progress at 70% Available to TP.12 for inclusion into Release Aubergine – TS-0009 v0.4.3 (HTTP Protocol Binding) Rapporteur: SeungMyeong Jeong see PRO R01 v0.4.3 – TP Progress at 70% Available to TP.12 for inclusion into Release Aubergine Progress indicates that the 3 of the normative TSs are ready to be frozen at TP.12

Open Action Items for alignment in TP © 2013 oneM2M Partners 3 A-PRO ARC PRO Clarification & handling of Request ID Josef Blanz: Qualcomm Open Nearly solved A-PRO ARC ARC ARC PRO PRO answers to questions on partial addressing Nicolas: ALU & Others Open A-PRO PRO PRO ARC ARC AE_CSE_ID_IssueShingo: Fujitsu & Others Open A-PRO PRO PRO ARC ARC & ARC R01 Is non-Blocking asynchronous in Release 1? TS-0004 rapporteurs Open Nearly Solved A-PRO ARC ARC PRO R03 Partial Updates – differentiate the primitives Nicolas: ALU, Qualcomm & Huawei Open A-PRO PRO PRO Presence of attributes in response message NobuOpen – TS-0001 mandates a response

Initial Release The fact that TS-0001 in the initial release is post Xi’an TS-0004, TS-0008 & TS-0009 are the latest; this means an artificial misalignment. WG4 & WG5 are also working until the last moment to create their TSs at the latest state. Do we understand & agree that we are going to the Public with a intentional & artificial misalignment? © 2013 oneM2M Partners 4

Items for INFORMATION © 2013 oneM2M Partners 5

Highlights Baselines available – TS-0004 v0.6.1 (Core Protocol) Rapporteurs: Shingo Fujimoto & Nobuyuki Uchida see PRO R01 V0.6.1 Progress at 70% – TS-0008 v0.5.0 (CoAP Protocol Binding) Rapporteur: SeongYoon Kim see PRO v0.5.0 Progress at 70% – TS-0009 v0.4.3 (HTTP Protocol Binding) Rapporteur: SeungMyeong Jeong see PRO R01 v0.4.3 Progress at 70% – TS-0010 v0.2.0 (MQTT Protocol Binding) Rapporteur: Peter Niblett No Progress at this meeting 45% © 2013 oneM2M Partners 6

Issues for INFORMATION in the TP © 2013 oneM2M Partners 7 A-PRO PRO R01 MIME typesShingo: Fujitsu & Others Closed A-PRO WG2/3/4 PRO ARC AE id, App id assignmentSeongyoon: LG, Fujitsu, Huawei Closed A-PRO PRO PRO Attribute access mode status errors e.g. read- write 1 instance; read only; write once; … NobuClosed Action on WG2 & WG5 A-PRO Error status code categorisation – must be extensible SeongyoonClosed in PRO A-PRO PRO R02 M2M:notificationEventSeungmyeongClosed in PRO A-PRO PRO R03 Mixed – Blocking/non- Blocking cases JiaxinClosed

Next Steps Congratulate all the members as 3 face to face meetings & 2 conference calls per week after TP.11 is very high commitment The rapporteurs have shown incredible endurance Call for Contributions to complete all the normative TSs Call for offline review and feedback before conference calls Alignment of TS-0001 with TS-0004 is a serious concern Collection on XSD files for 8 August (JSD may be provided on a voluntary basis) Plan for experts review & compilation by 22 August Progress deliverables though conference calls & Interim meetings Continued cooperation © 2013 oneM2M Partners 8

Next Meetings / Calls Conference Calls – PRO12.1 Tuesday – 12:00 noon UTC, August 12 – 90 minutes – PRO12.2 Tuesday – 12:00 noon UTC, August 19 – 90 minutes (Chaired by a VC) – PRO12.3 Tuesday – 12:00 noon UTC, August 26 – 90 minutes – PRO12.4 Tuesday – 12:00 noon UTC, September 02 – 90 minutes – PRO12.5 Tuesday – 12:00 noon UTC, September 09 – 90 minutes – PRO12.6 ad’hoc Tuesday – 12:00 noon UTC, September 16 – 90 minutes Face to Face – TP.13 Phoenix AZ USA September 2014 – TP.14 Busan, Korea November 2014 © 2013 oneM2M Partners 9