Procedures during Tracker Connection WPA meeting 3 rd December 2007, Michael Eppard, CERN Installation sequence Manpower needs for installation work.

Slides:



Advertisements
Similar presentations
inFire HTC speed Furnace Webinar
Advertisements

Assembly Manual Mike Fortney 04/09/2004 CricketSat Receiver.
Technician License Course Chapter 9 Lesson Module 22 Mechanical Safety.
INAR 243 FLOORS.  Structural element  Proper ground for functions.
Installation. Indoor Unit Installation Typical Installation.
Wine Cellar Split System Basics. Definitions Split System – A cooling unit that “splits” the cooling coil and the condenser apart into two remote pieces.
CMS ZDC Crane Emergency Payload Removal Procedures This document proposes the viability of using a portable hydraulic actuator Hand crane (Davit crane)
Installing Cable Floor Heating Systems This presentation will give you a practical idea of how to install a floor heating system.
AMS-02 tracker mechanics status of assembly and integration at UniGe Outer planes: - Tests of evaporator (cooling loop) integration - Tools to develop.
AMS-02 tracker mechanics status of assembly and integration Inner tracker integration completion: - Assembly and cabling - Temperature and magnetic field.
Tagger and Vacuum Chamber Assembly Procedure. Preassembly of second bottom yokes and poleshoes. a) Install special support. b) Place the second bottom.
1 Installation of Delphi Frame  ITS Installation.
G.Barber Tracker Update, Berkeley 10 Feb Tracker Progress Contents:- Station Space Frame Patch Panel / Vacuum Seal Light Guide Map Position of Degrader/Support.
Installation. Indoor Unit Installation Typical Installation.
CERN, November 25, 2003 – Technical Board Support chariot for ITS & FMD services on the RB24 side Foreward –This presentation reports the current ideas.
SPACE FRAME Interface between the LGT and the IST 21/06/2011 Marco Ciapetti.
1 Telecom Cabling Ladder racks systems and relay racks Ladder racks systems and relay racks.
1 Cryostat assembly, integration and commissioning procedures M.Olcese Version: 07 May 2008.
INTRODUCTION Definition:
ZDC/Dummy Absorber Exchange Crane Proposal Paul Debbins Ianos Schmidt Univ. of Iowa - Nov. 5, 2007.
NGfL CYMRU GCaD PLUMBING MATERIALS, PIPE BENDING AND PRESSURE TESTING.
Installation. Indoor Unit Installation Typical Installation.
1 Coordinate Detector: prototype design The Coordinate Detector (CDET): Three independent vertical planes with 15 cm plastic shield in front, all planes.
Pixel Support Tube Requirements and Interfaces M.Olcese PST CDR: CERN Oct. 17th 2001.
Update on alignment kit and stave 250 frame M.Gibson (RAL) 1.
ROSIER Ph End cap – TPC - LC DRAFT Definition of the front-end electronics and its cooling in the Alice TPC experiment Page 1A The Alice TPC.
26 April 2013 Immanuel Gfall (HEPHY Vienna) Belle II SVD Overview.
Electrical and Optical Cables Installation at P5 What When How H. Breuker
C ONCENTRIC TUBE H EAT EXCHANGER TEST SETUP AT C RYOLAB CO2 FOR CMS T RACKER WEEK MEETING. Theodoros Katopodis PH-CMX.
1 Belle II IR 2 Shuji Tanaka KEK Joint Belle II & superB Background meeting 2012//Feb/ 8-9th 1.
Installation and Commissioning Planning Leslie Camilleri Calorimeter Commissioning Meeting 5 th September 2006.
09/03/2010 ADO-PO section meeting Beam Pipe Extraction/Insertion R. Vuillermet.
1 IBL Integration & Testing activities University of Geneva: G.Barbier, F.Cadoux, A.Clark, D.Ferrère, C.Husi, M. Weber  Preliminary definition of Integration.
Test beam setup: status report 31/03/2009 M. Alfonsi (CERN)
LNF activities on WPC Panels Construction of prototypes and layout Status of tooling Proto 0, open items, plan,...
ATLAS 1 Beam Pipe Support Structure (BPSS) Interface and Assembly Final Design Review, April 2003 E. Anderssen, N. Hartman LBNL.
E.Guschin (INR) 21 November 2003Integration EDR PRS/SPD static envelop, assembly and installation Detector layout Static envelop along the beam Detector.
Service channels between Tracker and PP1 TK-PP1 Cable Channel Review 14 September 2007, Antti Onnela, CERN Installation order and Component status Mock-up.
G.Barber: Sci-Fi Mechanical Design - Tracker Meeting Cern 29 March Latest thoughts on Mechanical Design Contents:- Revised Fibre Pitch Fibre Optic.
RICH1 Gas Enclosure Installation. Experimental Area Meeting at CERN on 21st June 2006 Bill Cameron (Imperial College London) on behalf of the RICH1 team.
G.Barber Mice Tracker Mechanical Progress Tracker Mechanical Progress Contents:- Station Space Frame Station Layout Light Guide Map Connectors Patch.
How to Change Raptor Knife Blades. Step 1: Use a Phillips screwdriver to remove the 5 screws. It is not necessary to remove the lanyard/webbing to change.
IBL Mock up Mounting procedure V.2 François-Xavier Nuiry Simon Feigl
1. Take HV harnesses with label (IHV2) and transfer on the Stacking table. 1.1 Inspect HV harnesses visually. 2.1 Insulate HV Flex with 3M™ VHB™ Tape.
Additional muon stations for the Upgrade of the Elevator Regions in the ATLAS Muon Spectrometer. Installation scenario, status on the installation tools.
CEDAR MECHANICS Liverpool Conceptual Design (Subject to funding from STFC) 1 CEDAR Mechanics Conceptual Design.
POSITION. Apparatus The apparatus is used for measuring quantities of heat energy. The apparatus consists of a calorimeter, which is made of aluminium.
Baby Mind C OIL DESIGN AND ASSEMBLY SCENARIOS Helder Silva Phillipe Benoit Alexey Dudarev Gabriela Rolando Herman ten Kate Etam Messomo Laurent Nicola.
Leaf Spring WPA, Jan 30, Leaf Spring Inspection/Repair WPA Addendum Joe Howell Jan 30, 2008.
Progress on Stave assembly tooling Stephanie Yang (Oxford) WP4 meeting at Liverpool University, 13 th November 2014.
24 September 2012 Immanuel Gfall (HEPHY Vienna) SVD Status of Mechanics PXD-SVD Meeting Göttingen.
24 September 2012 Immanuel Gfall (HEPHY Vienna) Annekathrin Frankenberger (HEPHY Vienna) SVD Status of Mechanics PXD-SVD Meeting Göttingen.
Technician’s Guide & Workbook for Duct Diagnostics and Repair.
K.Long/G.Barber Mice Tracker Mechanical Status CM20 Feb 08 1 Mice Tracker Mechanical Status Contents:- Tracker 1 Status Tracker 2 Status Further Hardware.
Panda Solenoid Content Interface Box Cold Mass Layout Cooling Lines
Baby-MIND Modules & Services
Service channels between Tracker and PP1
Service channels between Tracker and PP1
- STT LAYOUT - SECTOR F SECTOR A SECTOR B SECTOR E SECTOR D SECTOR C
Additional muon stations for the Upgrade of the Elevator Regions in the ATLAS Muon Spectrometer. Integration issues Denis Diyakov, Alexander Seletskiy,
LumiCal mechanical design, integration with LDC and laser alignment
First of all we will remind some numbers:
LCLS-II SPQA Magnet Leads Soldering
The Quench Detection-Wire-Feedthrough Plug-In of W7-X
Module/Ladder Assembly
PLUMBING MATERIALS, PIPE BENDING AND PRESSURE TESTING
STUB configuration Mats Pålsson
Bunker Wall Design Wall ESS
Single Detector Design
Omega Selection Center
Presentation transcript:

Procedures during Tracker Connection WPA meeting 3 rd December 2007, Michael Eppard, CERN Installation sequence Manpower needs for installation work

Tracker Connection Installation Sequence Task 1:Removal of cable bundles and nose cones (WU-01) Cable bundles on the Tracker nose cones will be removed and put temporarily in the Tracker service channels. The empty nose cones will be detached from the Tracker and lifted by a hoist that is attached to the Surkov frame. The lifting sling will be fixed on the nose cone above the center of gravity. The cone will be slightly lifted up and its fixation pins will be removed, the cone will be slid along the z axis. When the cone will be out of the optical fibre storage structure envelope, it will be lowered down on the main floor of the Surkov frame. The cones shall be removed from the Surkov frame using a counterweighted lifting beam.

Task 1:Removal of cable bundles (WU-01), Picture Cable bundles

Task 1:Removal of Nose Cone (WU-01), Pictures

Tracker Connection Installation Sequence Task 2:Retraction Surkov frames and building scaffolding (WU-07) Both Surkov frames have to be moved out of the VT by 1 m in order to allow Tracker pipes installation. Between the Surkov frames and the face of the Tracker a standard scaffolding has to be built in order to allow proper access to the whoel Tracker service channels.

Tracker Connection Installation Sequence Task 3: Installation of Tracker optical fibres (WU-02) Installation of Tracker and Pixel optical fibres into their proper channels. Connection of Tracker and Pixel optical fibres to the multi-ribbon cables in PP1. Test of the optical connection with an OTDR.

Tracker Connection Installation Sequence Task 4: Connection of Tracker pipes (WU-03) Installation and connection of Tracker and Pixel cooling and gas pipes between Tracker and PP1. Leak testing of Tracker and Pixel cooling and gas pipes. Insulation of Tracker and Pixel cooling and gas pipes.

Task 4: Connection of Tracker pipes (WU-03) 1.Install male Lancasher fitting + first bend piece 2.Measure the correct length of the copper pipe end 3.Remove Lancasher fitting, cut the pipe and solder them together 4.Install the pipe definitively 5.Attach the pipe to the temporary mid-support (subsequent pipes attached to previous ones) 6.Cut the pipe to correct length 7.Solder the pipe with ceramic fitting 8.Clamp the pipe with support block (every 2 pipes) 9.Leak test with Argon (every 2 pipes)

2 layers of 9 mm Armaflex AF insulation, with joining tape In channels 1 and 2 must reduce insulation to allow space of cables. Where possible use 3 mm tape in addition Insulation of individual pipes at TK end is still to be studied: 3 mm tape? Tubular insulation? Task 4: Connection of Tracker pipes (WU-03): Insulation

Mid-path support with this element. During pipe installation use temporary support This support shall be slightly closer to optoribbons, to provide space for cables next to water pipe. This support shall also be a bit further away from the pipe bend, to ease insulation joint. Task 4: Connection of Tracker pipes (WU-03): Insulation

From mid-supports to PP1 use 18 mm insulation or 2 layers of 9 mm. Task 4: Connection of Tracker pipes (WU-03): Insulation

Inside PP1 use precut flat pieces, glued together Glued junction from tubular to rectangular section at PP1 entry Insulation of Y-section being done alreardy now! Task 4: Connection of Tracker pipes (WU-03): Insulation

Tracker Connection Installation Sequence Task 6: Installation of Tracker heating wires and cable combs (WU-04) Installation of heating wires into PP1 and special cooling channels. Installation of Tracker cable combs into PP1. connection 30 W/m heating cable, length ~7 m / standard PP1, Routed on outer surfaces of the pipe channel

Aluminium or plastic clamps and aluminium tape on top of the cable Heating cable follows the Y-piece (not present in this photo) Task 6: Installation of Tracker heating wires and cable combs (WU-04)

Tracker Connection Installation Sequence Task 7: Installation of Tracker and Pixel cables (WU-05) Installation of Tracker and Pixel cables into their cable channels between Tracker and PP1. Connection of Tracker and Pixel cables in PP1.

Task 7: Installation of Tracker and Pixel cables (WU-05) Here we have installed 7 cooling pipes 40 multi-service cables This represents the biggest channel occupancy, which is 7 cooling pipes 38 multi-service cables 6 ctrl-cables (≈ 2 MS-cables) Channel sections 1-4 Channel section 5

Tracker Connection Installation Sequence Task 8: Installation of Tracker heating elements on bulkhead (WU-06) ??

The Working Model We will work in two shifts from 6:00-14:00 and 14:00-22:00. We will work 6 days a week (Monday – Saturday). There will be only one particular task performed per day per side (no task will span over two consecutive shifts). There will be always two teams working on the same side (four teams per shift). Team “Pipes” will consist of 14 technicians plus four supervisors. Team “Mechanics” will consist of 10 technicians plus six supervisors (for the differnet tasks). Team “Fibres” will consist of 10 technicians plus two supervisors. The total manpower is 34 technicians plus 12 supervisors all coming from CMS institutes. The maximum work force per shift is around 20 technicians plus their supervisors. The whole Tracker connection including all work units will last minimum 9 weeks.