Power distribution box XD1 top DTTF_Crate XD2 middle DTTF_Crate XD3 bottom DTTF_Crate Connection to DTTF_Crate through cable USE H07 ZZ-F 3G1,5 RACK S1D01.

Slides:



Advertisements
Similar presentations
SITOP select Automation and Drives SITOP select Electronic Diagnosis Module Fault diagnosis – rapid and reliable.
Advertisements

Amplifying Signals Breadboarding: from a diagram to an actual working amplifier.
NetSure™ RDB Series.
André Augustinus 16 June 2003 DCS Workshop Safety.
Variable Frequency Drives VFD Basics
P. Paolucci - I.N.F.N. di Napoli / Joint RPC-Trigger meeting EASY Crate board/cratechannel/crate (max power) power/crate# crate/rackpower/rack#
MineralScan Lite Installation Guidelines Digital Control Lab, LLC NW 6 th Street, Suite F Gainesville, FL Main Unit power 90 – 240 VAC 50/60.
LECC V. Bobillier1 Overview of LHCb Electronics installation aspects V. Bobillier; L. Roy; J. Christiansen CERN - LHCb.
RPC Electronics Overall system diagram –At detector –Inside racks Current status –Discriminator board –TDC board –Remaining task.
© 2011 Ericson Manufacturing, Willoughby, Ohio
September 26, 2013 xTCA work group Evaluation results from AC/DC converters for xTCA Collaboration (CERN PH-ESE-BE) Vincent Bobillier, Matteo Di Cosmo,
Engineer Training UV Electrical Cabinet (16 and above) TJ8300 / TJ8500 UV Electrical Cabinet (Machines 16 and above)
ZTF Interconnecting Scheme Stephen Kaye
System Elements HighPoint Broadband Delivery System Sector 1 Sector 3
TOPIC-MAKING CONNECTION OF ONE SWITCH AND ONE SOCKET
POWER PLANT USED IN TELECOM
Verigy V93000 Service Training
JPV, TB of Nov.15 th, ‘Rack Status‘ Jean-Pierre Vanuxem, PH-AIS.
LHC ARC Commissioning report during LS1 Agenda: VRGPE documentation (former VRJGE) Active Penning modification By-Pass Valves modification LHC ARC commissioning.
PXL Rack Layout Draft Leo Greiner January 2, 2013 DateCommentsPersonVersionApproved 01/02/2013Initial versionLG1.0LG 01/09/2013 add additional PS in WAH.
Installation and checkout of QBPM system Hardware to be installed –Install hardware in racks –Install CPU /SIS digitizers/VMIC 3122 analog digitizers/Digital.
1 5 December 2012 Laurent Roy Infrastructure / Electronics Upgrade -Cabling (long distance) -Rack and Crate (space, electrical distribution, cooling) -Detector.
1 Low Voltage Power Supply Specification DCS Workshop 8 Sept 03 L.Jirden.
Figure 1: ICD Single Channel Block Diagram Schematic PMT High Voltage Supply (see Figure 4 & 4a) LED Pulser PMT Calibration (see Figure 6) ICD Scintillator.
Alex Madorsky University of Florida/Physics Track Finder production readiness review, Rice, August 2004 Track Finder Crate, Backplane and Parts Alex Madorsky.
Verigy V93000 Service Training Appendix B Autotransformer E8005A.
K. Luchini LCLS Injector /BC1 Magnet PS Final Design Review, March 30, Injector and BC1 Magnet PS Controls K. Luchini.
Power Plant Construction and QA/QC Section 4.4 – In-Plant Electrical Distribution Engineering Technology Division.
QBPM System Installation Systems –Rack mount chassis –LO and CAL RF cable plant ( need 714Mhz from eels bedroom) –Down mix boxes –DC power cable plant.
Shore Station1 EFNI H K Shore Station Block diagram Form factor Power setup Special for BARI Special for MILOM Planning Outcome of brainstorm.
Sageon Power Module Distribution Sageon Rack Trim Pieces.
17/03/2003 Referee Meeting M. Beretta 1 MDT Barrel - Complete LV-HV rack 6U 1U 4U 2U 45U 19” Tangential Fan High Voltage Crate Low Voltage Crate Heat Exchanger.
Notes taken from Gillette’s Designing with Light.
9/18/2003Safety Review Electronics Electronics design LV, HV power supply Fusing Heat.
1 13 Octobre 2011 Laurent Roy ATCA Crate / Infrastructure in place -Rack in D3: dimension -Electrical power availability -Tell1 racks running in D3 (air.
TE-CRG Interfaces Fair S-FRS magnets - CERN cryogenics Control interface CERN-GSI for B.180 cryogenics Control interface CERN-GSI for B.180 cryogenics.
FED optical cabling issues Matthew Pearson. Meeting with Jan and Francois at tracker week Discussed the TTC splitter and optical cabling paper design.
 E4 HVACR Electrical Installation #3 Circuit breakers, disconnects, and fuses.
1 DCS Meeting, CERN (vydio), Jun 25th 2013, A. Cotta Ramusino for INFN and Dip. Fisica FE Preliminary DCS technical specifications (v1.0) for the Gigatracker.
Status of integration in USA15. Status of rack layout 20/03/2015FTK Italia - A. Lanza2 Rack Y A2 equipped with turbine cooling system and nominal.
© 2011 Eaton Corporation. All rights reserved. Configuring BladeUPS™
Circuit Breakers CBI and ETA product offerings. Breaker Technologies - Hydraulic-Magnetic Not effected by ambient temperatures Possible to obtain any.
FTK crates, power supplies and cooling issues 13/03/20131FTK-IAPP workshop - A. Lanza  Racks, crates and PS: requirements  Wiener crates  Rittal crates.
MARCO control system Munich Lukasz Zwalinski – PH/DT Maciej Ostrega – PH/DT.
Wiener crates; An installation and power supply analysis. Magnus Bjork Be/Co/Fe
FTK infrastructures and DCS 02/12/20101FTK Initial Design Review - A. Lanza  Crates  Single rack layout  Cabling  Rack placement  DSS  DCS.
CERN Giovanna Lehmann, Xavier Pons
Delta’s Contribution for OCP Solution 2014
SPD II 1 for LV Power (AC/DC)
Rack Design Proposal as of 01/03/2013
DCS: Temperature Probes
ProtoDUNE SP – Slow control Status
flow process control trainer
DCS: Temperature Probes
Christian Veelken last updated 11/09/06
Structured cabling What, why & how.
Basic Definitions Power 1 Circuit 2
SCT/Pixel Draft Rack Layout rcj
Pierluigi Paolucci - I.N.F.N. Naples
ATLAS USA15 - Rack 52U with 9U crates, remote PS
Track Finder Crate, Backplane and Parts
Dr. Pierluigi Paolucci - INFN di Napoli
CECOM LAR Tropo Operation Course
CECOM LAR Tropo Operation Course
RPC Electronics Overall system diagram Current status At detector
P2 - Physics Mains Electricity.
Dr. Pierluigi Paolucci - INFN di Napoli
PLC Front Panel.
Vacuum Control System for Monolith Vacuum
Presentation transcript:

Power distribution box XD1 top DTTF_Crate XD2 middle DTTF_Crate XD3 bottom DTTF_Crate Connection to DTTF_Crate through cable USE H07 ZZ-F 3G1,5 RACK S1D01 DTTF crates Wiener crates UEP 6021-LHC 6U type (0P06.770) Input: VAC ± 10% ( VAC) Hz max 16A Mains input connection with a 3-pin HIRSCHMAN connector. No main fuse inside, a circuit breaker for overcurrent protection 16A type B or C has to be installed externally. (Inside the Power distribution box). Power Pout (100VAC): 1200W Pout (>159 VAC): 1900W CE / EN 60950, ISO 380, VDE 0805, UL 1950, C Each VME is outfitted with a grounding stud which is wired to mains earth or zero potential. DTTF Crates

RACK S1D02 DTTF crates Power distribution box XD2 top DTTF_Crate XD3 middle DTTF_Crate XD4 bottom DTTF_Crate Connection to DTTF_Crate through cable USE H07 ZZ-F 3G1,5 Wiener crates UEP 6021-LHC 6U type (0P06.770) Input: VAC ± 10% ( VAC) Hz max 16A Mains input connection with a 3-pin HIRSCHMAN connector. No main fuse inside, a circuit breaker for overcurrent protection 16A type B or C has to be installed externally (inside the Power distribution box). Power Pout (100VAC): 1200W Pout (>159 VAC): 1900W CE / EN 60950, ISO 380, VDE 0805, UL 1950, C Each VME is outfitted with a grounding stud which is wired to mains earth or zero potential. DTTF Crates

RACK S1D03 DTTF crates Power distribution box XD1 top Test Signal Crate XD2 middle DTTF_Crate XD3 DCS patch box Connection to DTTF_Crate through cable USE H07 ZZ-F 3G1,5 Wiener crates UEP 6021-LHC 6U type (0P06.770) Input: VAC ± 10% ( VAC) Hz max 16A Mains input connection with a 3-pin HIRSCHMAN connector. No main fuse inside, a circuit breaker for overcurrent protection 16A type B or C has to be installed externally. (Inside the Power distribution box). Power Pout (100VAC): 1200W Pout (>159 VAC): 1900W CE / EN 60950, ISO 380, VDE 0805, UL 1950, C Each VME is outfitted with a grounding stud which is wired to mains earth or zero potential. DTTF Crates

Turbine 4U Heat exchange Blank panel 14U Heat exchange Air deflector 2U Front side Blank panel 10U DSS chassis 4U National Instruments CompactRIO PLC Requiring max 17W Phoenix Conctact Quint power supply DC for the PLC Siemens Sitop Power Flexi power supply DC range 3÷57V 10A S1D07 DT RACK Mains & AC/DC converter Front side Back side - 2 DSS chassis equipped with 1 PLC with its power supplies and 1 power supply for signals, diagram shown Input: 1 cable 3x1,5mm2 1,5m long coming from a multiple socket-outlet block - 1 multiple socket-outlet block (5 sockets ASE 12 10A) installed by integration group - 1 Ethernet switch HP 2724 on the back side

Turbine 4U Heat exchange SCM CRATE 3 6U Blank panel Fan tray Heat exchange SCM CRATE 2 6U Blank panel Fan tray Heat exchange SCM CRATE 1 6U Blank panel Fan tray Heat exchange DDU patch panel 3U DDU CRATE 11U SECO patch panel 2U Heat exchange Air deflector 2U SECO patch panel 1U Front side Turbine 4U Patch panel 3U Ethernet switch Air deflector 2U Back side S1G00 DT RACK far side Mains & AC/DC converter - 1 DDU crate (Wiener VME 6023 equipped with UEP 6021 Power supply) Input: 1 cable 3x1,5mm2 3m long with Harting connectors coming from the power distributor on the top of the rack - 3 SCM crates (Elma Cpci equipped with 2 Kniel 300W FPQ-1608/VME power supplies Input: 1 cable 3x1,5mm2 1,5m long coming from a multiple socket-outlet block - 3 Fan tray requiring max 15W Input: 1 cable 3x1,5mm2 1,5m long coming from a multiple socket-outlet block - 3 Patch panel 3U for signal cables routing equipped with 2 AC/DC converter Cabur XCSD15B 12V/0,6A Input: 1 cable 3x1,5mm2 1,5m long coming from a multiple socket-outlet block. Earth wire connected to case - 3 multiple socket-outlet block (5 sockets ASE 12 10A) installed by integration group - 1 Ethernet switch HP 2724