5 december 2011 Living Probabilistic Asset Management Dr.ir. J.A. van den Bogaard.

Slides:



Advertisements
Similar presentations
Technical skills and competences
Advertisements

Integra Consult A/S Safety Assessment. Integra Consult A/S SAFETY ASSESSMENT Objective Objective –Demonstrate that an acceptable level of safety will.
Operation & Maintenance Engineering Detailed activity description
Software Quality Assurance Plan
Environmental Management System (EMS)
1 Information Systems Development (ISD) Systems Development Life Cycle Overview of Analysis Phase Overview of Design Phase CP2236: Information Systems.
More CMM Part Two : Details.
RISK INFORMED APPROACHES FOR PLANT LIFE MANAGEMENT: REGULATORY AND INDUSTRY PERSPECTIVES Björn Wahlström.
Software Quality Assurance (SQA). Recap SQA goal, attributes and metrics SQA plan Formal Technical Review (FTR) Statistical SQA – Six Sigma – Identifying.
Smart Grid - Cyber Security Small Rural Electric George Gamble Black & Veatch
Laboratory Personnel Dr/Ehsan Moahmen Rizk.
1 Software Testing and Quality Assurance Lecture 33 – Software Quality Assurance.
Managing the Information Technology Resource Jerry N. Luftman
1 R&D SDM 1 Software Project Management Capability Maturity Model 2009 Theo Schouten.
Chapter 3 The Structure of the CMM
Quality evaluation and improvement for Internal Audit
Software Quality Assurance. CS351 - Software Engineering (AY2004)2 Software engineering processes Systems vs. Software –Terms often used interchangeably.
Task analysis 1 © Copyright De Montfort University 1998 All Rights Reserved Task Analysis Preece et al Chapter 7.
Software Verification and Validation (V&V) By Roger U. Fujii Presented by Donovan Faustino.
Quality Improvement Prepeared By Dr: Manal Moussa.
Managing Project Quality
Introduction to Information System Development.
IAEA International Atomic Energy Agency How do you know how far you have got? How much you still have to do? Are we nearly there yet? What – Who – When.
S/W Project Management
S T A M © 2000, KPA Ltd. Software Trouble Assessment Matrix Software Trouble Assessment Matrix *This presentation is extracted from SOFTWARE PROCESS QUALITY:
1 Module 4: Designing Performance Indicators for Environmental Compliance and Enforcement Programs.
Introduction to Software Quality Assurance (SQA)
Twinning project, activity 4, Maintenance assessment Tuesday 4 th October 2005, session 3 Output management: essential Instruments within ProRail By Jan.
University of Palestine software engineering department Testing of Software Systems Fundamentals of testing instructor: Tasneem Darwish.
VTT-STUK assessment method for safety evaluation of safety-critical computer based systems - application in BE-SECBS project.
Software Inspection A basic tool for defect removal A basic tool for defect removal Urgent need for QA and removal can be supported by inspection Urgent.
Software System Engineering: A tutorial
IRSN STRATEGY TO ASSESS A NEW MAINTENANCE POLICY / Nesebar, Bulgaria Presented by Naoëlle MATAHRI, IRSN.
ISO 14001:2004, Environmental Management System
1 RBM Background Development aid is often provided on a point to point basis with no consistency with countries priorities. Development efforts are often.
How does the ECA assess Member States’ internal control systems? Workshop on Audit/Evaluation of Public Internal Financial Control Systems (PIFC) Ankara,
NO FRAUD LEFT BEHIND The Effect of New Risk Assessment Auditing Standards on Schools Runyon Kersteen Ouellette.
Systems Development AIMS 2710 R. Nakatsu. Overview Why do IT projects succeed and fail? Two philosophies of systems development –Systems Development Life.
Chapter 10 Information Systems Analysis and Design
Health and Safety Policy
Software Engineering Management Lecture 1 The Software Process.
School for drafting regulations Nuclear Safety Operation Vienna, 26 November -7 December 2012 Tea Bilic Zabric.
Copyright 2002 Prentice-Hall, Inc. 1.1 Modern Systems Analysis and Design Jeffrey A. Hoffer Joey F. George Joseph S. Valacich Chapter 1 The Systems Development.
Georgia Institute of Technology CS 4320 Fall 2003.
Glen Fields - Final Project Presentation. What Sets CSI Apart... GBA 573 Consultants Company Background Located in San Diego, CA 5 Engineering Consultants.
Paul Hardiman and Rob Brown SMMT IF Planning and organising an audit.
AET0012PPT by Dr. Anwar El-Tawil Dr. Anwar El-Tawil Director ISO Programme for Developing Countries QUALITY MANAGEMENT SYSTEM ACCORDING TO.
TACIS Project: R8.01/98 – TRANSLATION, EDITING AND DIFFUSION OF DOCUMENTS (Result Dissemination) Probabilistic Safety Analysis Technology (PSA) TACIS R3.1/91.
Project quality management. Introduction Project quality management includes the process required to ensure that the project satisfies the needs for which.
IAEA International Atomic Energy Agency Methodology and Responsibilities for Periodic Safety Review for Research Reactors William Kennedy Research Reactor.
Purpose: The purpose of CMM Integration is to provide guidance for improving your organization’s processes and your ability to manage the development,
Software Quality Assurance SOFTWARE DEFECT. Defect Repair Defect Repair is a process of repairing the defective part or replacing it, as needed. For example,
ISO Registration Common Areas of Nonconformances.
Smart Home Technologies
Evaluate Phase Pertemuan Matakuliah: A0774/Information Technology Capital Budgeting Tahun: 2009.
Environmental Management System Implementation. Practices, Aspects, Impacts- Concepts Mission Resource Impact Resource Impact Activities/ Operations Practices.
What is project management?
Erman Taşkın. Information security aspects of business continuity management Objective: To counteract interruptions to business activities and to protect.
IAEA Training Course on Safety Assessment of NPPs to Assist Decision Making Diablo Canyon NPP Probabilistic Risk Assessment Program Workshop Information.
SwCDR (Peer) Review 1 UCB MAVEN Particles and Fields Flight Software Critical Design Review Peter R. Harvey.
Company LOGO. Company LOGO PE, PMP, PgMP, PME, MCT, PRINCE2 Practitioner.
Equipment Life Optimization Program (ELOP) Doug Hilleman February 10, 2011.
Statistical process model Workshop in Ukraine October 2015 Karin Blix Quality coordinator
WORKSHOP ON ACCREDITATION OF BODIES CERTIFYING MEDICAL DEVICES INT MARKET TOPIC 6 CH 5 ISO MANAGEMENT RESPONSIBILITY Philippe Bauwin Medical.
Safety Management Systems Session Four Safety Promotion APTA Webinar June 9, 2016.
Project Management PTM721S
ITIL: Service Transition
Classifications of Software Requirements
The ORR/RA and the Authorization Basis May 2005 Revision
CIS12-3 IT Project Management
Presentation transcript:

5 december 2011 Living Probabilistic Asset Management Dr.ir. J.A. van den Bogaard

Ministerie van Verkeer en Waterstaat Living Probabilistic Asset Management25 december ,5  [-/vraag] 1,0  [-/vraag]

Ministerie van Verkeer en Waterstaat Living Probabilistic Asset Management35 december 2011 From PSA to LPAM PSA proven, mature methodology in Nuclear and Petro-Chemical Industry, which is routinely applied PSA focuses on Safety while critical performance characteristics of infrastructure demands focus on RAMS aspects PAM extends the focus on safety to RAMS Systems and operations change over time need to be taken into account: –Physical changes in the design of a system –Changes in operating conditions –Improvements in the understanding of system behaviour in fault conditions –More system specific data become available Keeping the PAM useful over time it needs to be updated making it a Living PAM

Ministerie van Verkeer en Waterstaat Living Probabilistic Asset Management45 december 2011 Definition LPAM A living PAM can be defined as a PAM analysis of a system, which is updated, if necessary, to reflect the current built and operational features and is documented in such a way that each aspect of the model can be directly related to existing system information, operating conditions, system documentation or the analysts’ assumptions in the absence of such information.

Ministerie van Verkeer en Waterstaat Living Probabilistic Asset Management55 december 2011 Characteristics of LPAM Framework for the process to obtain, maintain and optimize the reliability level Deming-circle Principle (plan-do-check-act) Complete mix of in-depth knowledge of technical systems, reliability analysis, maintenance Qualitative/Quantitative approach Reliability, Availability, Maintainability, Safety (RAMS)

Ministerie van Verkeer en Waterstaat Living Probabilistic Asset Management65 december 2011 Scope of LPAM LPAM Organization Performance Analysis Contracts

Ministerie van Verkeer en Waterstaat Living Probabilistic Asset Management75 december 2011 Implementation and operational process LPAM ACT Design Modifications Modify FT and Check Target Check Over-all and Component Performance PLAN Specify Modifications Instruct Contractors DO Implement Modifications Perform regular Maintenance INITIAL PHASE

Ministerie van Verkeer en Waterstaat Living Probabilistic Asset Management85 december 2011 Phase 0: Initial Phase 1.System and function analysis 2.Defining RAMS requirements 3.Perform Qualitative and Quantitative Risk Analysis 4.Define As-Is situation 5.Define As-Wished situation 6.Define differences and plan activities 7.Translate to LPAM process Process description Defining necessary contral and operational organisation Define contracts (DBFM contractual aspects)

Ministerie van Verkeer en Waterstaat Living Probabilistic Asset Management95 december Total probability of failure Probabilities of events result from fault tree analysis Fault tree 1Fault tree 2Fault tree 3 Fault tree … Fault tree n Event tree

Ministerie van Verkeer en Waterstaat Living Probabilistic Asset Management105 december 2011 Topics in QRA Component and system reliability Common Cause Failure External Causes of Failure –Lightning –Fire –Internal flooding –Etc. Human reliability Software reliability

Ministerie van Verkeer en Waterstaat Living Probabilistic Asset Management115 december 2011 Phase 1: Maintenance Planning Maintenance plan should include/respect all assumptions made in the QRA’s. Including: Maintenance strategies (CM, PM, CM) Inspection strategies/intervals Testing strategies/intervals Recovery and test procedures Repair times Stock policy

Ministerie van Verkeer en Waterstaat Living Probabilistic Asset Management125 december 2011 Phase 2: Performing Maintenance In the DO phase modifications are implemented and regular maintenance is performed according to the maintenance plans. These activities consist of the execution of tests, inspections, revisions, repairs, replacements and the system modifications, as planned in the previous phase.

Ministerie van Verkeer en Waterstaat Living Probabilistic Asset Management135 december 2011 Phase 3: Monitoring Process In the CHECK phase the overall system, components, maintenance en organizational performance of the system is monitored. Monitoring focuses on: –All failures, errors, disruptions and observations in process or system –All differences with respect to the assumptions in the risk analysis (repair times, inspection intervals, test intervals) –Effectiveness of all tests and inspections –Gathering information from tests and inspections for trend analysis of failure frequencies –Observations on human errors during maintenance and operations.

Ministerie van Verkeer en Waterstaat Living Probabilistic Asset Management145 december 2011 Phase 4: Analyzing and Adjusting Risk Analyses In the ACT phase the probability of failure of the system is calculated with the new input from the check phase and is assured that the system still complies with the probability target. The final result, i.e. failure probability of the system, is compared with the target and if the target is met no additional design measures are necessary. But if the outcome does not comply with the target, the system has to be modified. Next to changing the hardware physically, also measures like reducing repair times, shortening test intervals or improve skills can be taken. These modifications will have to be evaluated again, until the probability target is met. This process constitutes a small loop within the ACT phase.

Ministerie van Verkeer en Waterstaat Living Probabilistic Asset Management155 december 2011 Organization of the LPAM Process Important aspects: Implementation of LPAM is usually carried out by a project team After implementation the maintenance organisation becomes responsible for the quality and effectiveness of LPAM It is a mistakte to think that the organisation is in control after the initial phase Sufficient resources should be available Support from management is key to success Training and education programs should be available and implemented Other important issues in this phase are the role of (sub-)contractors, training of operation and training of maintenance activities and the interpretation of feedback from the maintenance activities the risk analyses.

Ministerie van Verkeer en Waterstaat Living Probabilistic Asset Management165 december 2011 Documentation Results, conclusions and recommendations traced back to the design, operation and assumptions used in the analysis. The documentation needs to include details of the design and operation of the system and details of the analysis that form the basis for the models used in LPAM. The justification for the data used for initiating event frequencies, component failure probabilities, common cause failure probabilities, human error probabilities, etc. should be provided. All numerical values should be traceable, back to the source data or models.

Ministerie van Verkeer en Waterstaat Living Probabilistic Asset Management175 december 2011 LPAM with respect to networks Application LPAM on infrastructural networks Complexity Criticality Costs Level of detail of analyses

Ministerie van Verkeer en Waterstaat Living Probabilistic Asset Management185 december 2011 Questions?