MUSURUMILLI PROJECT 15 km 35.4 km Project cost : cr

Slides:



Advertisements
Similar presentations
1 PROJECT PROFILE : Lining of TGP Canal from KM to KM (Up to Kurnool – Kadapa Border) etc. 2No. of Packages:6 (2 EPC + 4 Old Packages) 3Agreement.
Advertisements

Sl. N. Name of ProjectAgencyEstimated Cost Latest Estimated Cost by Planning Commission Fund Release by GoI ExpenditurePhysical Status ENERGY.
LORD Addl. PD, DRDA, BOLANGIR Presentation by HARISHANKAR.
SPILLWAY ( 77 mt) 31.5 Km SEEPAPALLY VAGU RESERVOIR Right Earth Dam226 Mt Left Earth Dam 522 Mt Non EPC Package Works under progress EPC Package Works.
Kalpsar : A kayakalp project Biggest Tidal project in the world envisaged S R Awasthi.
(A) Completion of on going works of dam, canals,etc. including restoration of works of dam. PROJECT WISE DETAIL Total Provision Rs Crore Measure/Project/SectorDistt.
AMR - APARD ASSIGNMENT OF GOVT. LANDS B. Venkateswara Rao District Revenue Officer (Retd.)
SRIPADASAGAR PROJECT (YELLAMPALLY PROJECT)
Implementation of MGNREGS in Andhra Pradesh In India Agriculture based Livelihoods: Opportunities and Potential 1 Government of Andhra Pradesh, India.
(POLAVARAM) (Head Works)
TADIPUDI LIFT IRRIGATION SCHEME
For Long Term Water Security SARDAR SAROVAR (NARMADA) PROJECT Sardar Sarovar Narmada Nigam Limited Dr. M.B. Joshi GM (Tech. & Coor.)
PRESENTATION BY Manaranjan Mali, Addl.P.D Technical, DRDA, Nabarangpur.
ALISAGAR LIFT IRRIGATION SCHEME – 2 years period
PEDDAGEDDA PROJECT Project cost : Crores Ayacut : Acres
PUSHKARA LIFT IRRIGATION SCHEME (2 years period)
Budget allocation and release of funds to implementing agencies under ADIP Scheme S.NoFinancial Year Budget Estimate (Rs. In crores) Amount Released (Rs.
11 th Meeting of General Council (GC) of National Food Security Mission (NFSM) 26 th August, 2015 Presentation by: Ajay Kumar Singh State Mission Director.
HANDRI NIVA SUJALA SRAVANTHI (IRRIGATION SCHEME) (1.98 LAKH ACRES)
GNSS PROJECT (PHASE-I)
LEFT LINK CHANNEL 540M RIGHT LINK CHANNEL 210 M LEFT HEAD SLUICE RIGHT HEAD SLUICE PROPOSED RIGHT MAIN CANAL 1,20,000 ACRES Km Km LEFT.
VELIGONDA PROJECT 1. Teegalem Canal (48.15 km) 62,000 Ac
PULICHINTALA PROJECT NSP Reservoir Barrage Halia Musi Paleru Munneru
赴国际水稻所访学情况汇报 长江大学农学院 邢丹英 2010 年 6 月. 学习目的 学习时间、地点 学习内容 学习收获 几点体会 汇报提纲.
30Nos. Distributaries under the 3 canals are in progress and are to be completed by 3/2006. Lining works for all 3 Main Canals proposed in package 94,
(Water Availability : 57.50TMC, Ayacut proposed: 2,55,510Acs)
PHASE – I & PHASE - II.
Under execution YELLUR BALANCING RESERVOIR EXISTING SINGOTAM RESERVOIR
PACKAGE 22PACKAGE 23 Total Ayacut under this scheme: 50,250 Ac. KOILSAGAR LIFT IRRIGATION SCHEME, MAHABOOBNAGAR DISTRICT (FLOW DIAGRAM) Approach channel.
WATER RESOURCES DEPARTMENT
1 VENKATANAGARAM PUMPING SCHEME. 2 LOCATION OF THE PROJECT  At Km of Akhanda Godavari Left Bank  Longitude 81°- 35’ – 56” E  Latitude 17°- 8’
DISTRIBUTORIES (D19, D22, D25, D37, D39, D40 TO D55) CONSTRUCTION OF WHOLE DISTRIBUTORY SYSTEM, CM & CD WORKS AND MICRO NETWORK (FIELD CHANNELS) The main.
SRI RAMA SAGAR PROJECT STAGE-II
TELUGU GANGA PROJECT (2 years period)
1 Project Profile : Lifting of 20 tmc of water from foreshore of PJP and Ookachettivagu Project Pondage 2 Administrative Sanction : G. O. Ms. No. 166,
SRI RAMATHEERTHAM BALANCING RESERVOIR NAGARJUNASAGAR RESERVOIR KRISHNA RIVER ONGOLE NAGARJUNASAGAR RIGHT MAIN CANAL ONGOLE BRANCH CANAL RAMATHEERTHAM BALNCING.
6.12a DESIGN APPROACH ON BILILO SPATE IRRIGATION PROJECT Presented by Eyob Yehayis.
CHINA TUMBALAM TANK (Existing) DUDDI LI SCHEME DUDDI RESERVOIR (New) BASALA DODDI LI SCHEME MADHAAVARAM LI SCHEME Location : DUDDI (V), Madhavaram Tanda.
52, 060 Ac. Cap TMC Cap TMC 28, 000 Ac. Under Progress.
南水北调东线第一期工程山东段 情况简介. 主要汇报内容 二、南水北调山东段工程总体布置 三、山东段工程项目划分及工程主 要建设内容 一、南水北调东线工程概况 四、前期工作及工程建设进展情况 五、工程总投资.
VELIGALLU PROJECT 1 PROJECT PROFILE: Formation of earth dam, construction of spillway & fabrication and erection of 5 Nos. Radial gates for Veligallu Project.
Presented by Telangana Retired engineers forum 11.
FLOW DIAGRAM OF C.B.R RIGHT CANAL (LINGALA CANAL FROM KM TO KM ) WORKS GROUNDED COMPLETED CHITRAVATHI BALANCING RESERVOIR (Existing) KM 0.00.
TARAKARAMA THIRTHA SAGARAM PROJECT Project Cost : Crores Ayacut: Acres Km. Excavation of RMC including Distributories, Field Channels.
Participatory Irrigation Management in Andhra Pradesh
Polavaram Irrigation Project
Polavaram Irrigation Project
Polavaram Irrigation Project
Polavaram Irrigation Project
Polavaram Irrigation Project
Review of CADWM Projects Under PMKSY
Polavaram Irrigation Project
Polavaram Irrigation Project
Polavaram Irrigation Project
Virtual Review - #61 by Chief Minister Dt
Polavaram Irrigation Project
#80 Virtual Review by Hon’ble CM dt: 5 Nov. 2018
Polavaram Irrigation Project
#28 Site Visit of Hon’ble Chief Minister Dt. 22nd October, 2018
Polavaram Irrigation Project
#79th Virtual Review by Hon’ble Chief Minister Dt. 29th October, 2018
Polavaram Irrigation Project
#82 Virtual Review by Hon’ble CM dt: 19th Nov. 2018
Polavaram Irrigation Project
#85 Virtual Review by Hon’ble Chief Minister, Dt. 21st January 2019
#87 Virtual Review by Hon’ble Chief Minister Dt: 04 FEB 2019
#89 VIRTUAL REVIEW BY HONBLE CHIEF MINISTER Dt. 25th FEBRUARY 2019
Polavaram Irrigation Project
Transportation/Systems
#86 Virtual Review by Hon’ble Chief Minister, Dt. 28th January 2019
Presentation transcript:

MUSURUMILLI PROJECT 15 km 35.4 km Project cost : 207.00 cr TUNNEL MAIN CANAL 2.7 KM RESERVOIR HEAD SLUICE 2.7 mt X 1.6 mt LEFT EARTH DAM NON OVER FLOW DAM RIGHT EARTH DAM SPILL WAY 86.5 mt DYKE 138 mt SEETHAPALLI VAGU EBD VAGU PICKUP WEIR 15 km 35.4 km HEADREGULATOR EPC Package Works under progress Project cost : 207.00 cr Ayacut : 22643 ac

MUSURUMILLI PROJECT 1 PROJECT PROFILE : Across Seethapallivagu 2 Administrative Sanction : G. O. Ms. No. 204, I & CAD, Dt: 31-12-2004 for Rs. 207.00 Crores 3 No. of EPC Packages 2 Nos 4 Agreement value of 2 packages 118.72 Crs. 5 Budget provision for 2006-07 Rs.33.00 Crs. 6 Expenditure of the project 2004 – 05 Rs. 11.88 Crs. 2005 – 06 Rs. 21.59 Crs. Cum. Exp. Rs. 33.47 Crs 8 Ayacut New ayacut 22,643 acres 9 Land Acquisition Required 3633 acres Acquired 855 acres 10 Forest Land 0.85 hectares Govt. of AP have accorded permission vide G.O.Ms.No.119, Dt.31-10-05 for diversion of forest land

MUSURUMILLI PROJECT 11 Mob. Advance (Rs. in Crores) Paid Recovered 2004-05 : 5.85 -- 2005-06 5.35 2.22 Total 11.20 2.22