Operational Seasonal Forecasting for Bangladesh: Application of quantile-to-quantile mapping Tom Hopson Peter Webster Hai-Ru Chang Climate Forecast Applications.

Slides:



Advertisements
Similar presentations
Precipitation in IGWCO The objectives of IGWCO require time series of accurate gridded precipitation fields with fine spatial and temporal resolution for.
Advertisements

Burkina Faso Ghana Uganda.
The Climate Prediction Center Rainfall Estimation Algorithm Version 2 Tim Love -- RSIS/CPC.
Dennis P. Lettenmaier Alan F. Hamlet JISAO Center for Science in the Earth System Climate Impacts Group and Department of Civil and Environmental Engineering.
FTIPP FCLIM / TRMM / IRP Precipitation Pentads
Ensemble Post-Processing and it’s Potential Benefits for the Operational Forecaster Michael Erickson and Brian A. Colle School of Marine and Atmospheric.
Colorado Basin River Forecast Center Water Supply Forecasting Method Michelle Stokes Hydrologist in Charge Colorado Basin River Forecast Center April 28,
1 NOAA’s National Climatic Data Center April 2005 Climate Observation Program Blended SST Analysis Changes and Implications for the Buoy Network 1.Plans.
CPC’s U.S. Seasonal Drought Outlook & Future Plans April 20, 2010 Brad Pugh, CPC.
Advanced Study Program
Mohammad Khaled Akhtar & Slobodan P. Simonovic
Flood Forecasting for Bangladesh Tom Hopson NCAR Journalism Fellowship June 14-18, 2010.
For the lack of ground data the verification of the TRMM performance could not be checked for the entire catchments, however it has been tested over Bangladesh.
The Evaluation of a Passive Microwave-Based Satellite Rainfall Estimation Algorithm with an IR-Based Algorithm at Short time Scales Robert Joyce RS Information.
CPC Unified Gauge – Satellite Merged Precipitation Analysis for Improved Monitoring and Assessments of Global Climate Pingping Xie, Soo-Hyun Yoo,
Rank Histograms – measuring the reliability of an ensemble forecast You cannot verify an ensemble forecast with a single.
Operational Flood Forecasting for Bangladesh: Tom Hopson, RAL-NCAR Peter Webster, Georgia Tech A. R. Subbiah and R. Selvaraju, Asian Disaster Preparedness.
Operational Flood Forecasting for Bangladesh: Tom Hopson, NCAR Peter Webster, GT A. R. Subbiah and R. Selvaraju, ADPC Climate Forecast Applications for.
Long-lead flood forecasting for India: challenges, opportunities, outline Tom Hopson.
Assessment of Hydrology of Bhutan What would be the impacts of changes in agriculture (including irrigation) and forestry practices on local and regional.
Tutorial. Other post-processing approaches … 1) Bayesian Model Averaging (BMA) – Raftery et al (1997) 2) Analogue approaches – Hopson and Webster, J.
Streamflow Predictability Tom Hopson. Conduct Idealized Predictability Experiments Document relative importance of uncertainties in basin initial conditions.
Where the Research Meets the Road: Climate Science, Uncertainties, and Knowledge Gaps First National Expert and Stakeholder Workshop on Water Infrastructure.
National Weather Service Application of CFS Forecasts in NWS Hydrologic Ensemble Prediction John Schaake Office of Hydrologic Development NOAA National.
Precipitation Estimation from Remotely Sensed Information using Artificial Neural Networks (PERSIANN) Kuolin Hsu, Yang Hong, Dan Braithwaite, Xiaogang.
Combining CMORPH with Gauge Analysis over
Global Flood and Drought Prediction GEWEX 2005 Meeting, June Role of Modeling in Predictability and Prediction Studies Nathalie Voisin, Dennis P.
The NOAA Hydrology Program and its requirements for GOES-R Pedro J. Restrepo Senior Scientist Office of Hydrologic Development NOAA’s National Weather.
Satellite-derived Rainfall Estimates over the Western U.S.: Fact or Fiction? John Janowiak Bob Joyce Pingping Xie Phil Arkin Mingyue Chen Yelena Yarosh.
Daily to Seasonal Operational Flood Forecasting Tom Hopson, NCAR and ADPC Peter Webster, CFAB and Georgia Tech A. R. Subbiah, ADPC.
Use of Mesoscale Ensemble Weather Predictions to Improve Short-Term Precipitation and Hydrological Forecasts Michael Erickson 1, Brian A. Colle 1, Jeffrey.
Operational Short-term Flood Forecasting for Bangladesh:
Potential for medium range global flood prediction Nathalie Voisin 1, Andrew W. Wood 1, Dennis P. Lettenmaier 1 1 Department of Civil and Environmental.
RFC Climate Requirements 2 nd NOAA Climate NWS Dialogue Meeting January 4, 2006 Kevin Werner.
Long-lead flood forecasting for India: challenges, opportunities, outline Tom Hopson.
Technological Improvements in Flood Forecasting Thomas Hopson National Center for Atmospheric Research (NCAR)
Upstream Satellite-derived Flow Signals for River Discharge Prediction
Operational Flood Forecasting for Bangladesh using ECMWF ensemble weather forecasts Tom Hopson, NCAR Peter Webster, Georgia Tech A. R. Subbiah and R. Selvaraju,
Nathalie Voisin 1, Florian Pappenberger 2, Dennis Lettenmaier 1, Roberto Buizza 2, and John Schaake 3 1 University of Washington 2 ECMWF 3 National Weather.
1 Inter-comparing high resolution satellite precipitation estimates at different scales Phil Arkin and Matt Sapiano Cooperative Institute for Climate Studies.
New Method for Bias Correcting GCM data
An Overview of Satellite Rainfall Estimation for Flash Flood Monitoring Timothy Love NOAA Climate Prediction Center with USAID- FEWS-NET, MFEWS, AFN Presented.
Developing Consistent Earth System Data Records for the Global Terrestrial Water Cycle Alok Sahoo 1, Ming Pan 2, Huilin Gao 3, Eric Wood 2, Paul Houser.
A new high resolution satellite derived precipitation data set for climate studies Renu Joseph, T. Smith, M. R. P. Sapiano, and R. R. Ferraro Cooperative.
Judith Curry James Belanger Mark Jelinek Violeta Toma Peter Webster 1
Long-lead flood forecasting for India: challenges, opportunities, outline Tom Hopson.
DOWNSCALING GLOBAL MEDIUM RANGE METEOROLOGICAL PREDICTIONS FOR FLOOD PREDICTION Nathalie Voisin, Andy W. Wood, Dennis P. Lettenmaier University of Washington,
VERIFICATION OF A DOWNSCALING SEQUENCE APPLIED TO MEDIUM RANGE METEOROLOGICAL PREDICTIONS FOR GLOBAL FLOOD PREDICTION Nathalie Voisin, Andy W. Wood and.
EVALUATION OF A GLOBAL PREDICTION SYSTEM: THE MISSISSIPPI RIVER BASIN AS A TEST CASE Nathalie Voisin, Andy W. Wood and Dennis P. Lettenmaier Civil and.
G O D D A R D S P A C E F L I G H T C E N T E R TRMM Tropical Rainfall Measuring Mission 2nd GPM GV Workshop TRMM Ground Validation Some Lessons and Results.
J an Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec-- Applications of Medium Range.
“CMORPH” is a method that creates spatially & temporally complete information using existing precipitation products that are derived from passive microwave.
National Oceanic and Atmospheric Administration’s National Weather Service Colorado Basin River Forecast Center Salt Lake City, Utah 11 The Hydrologic.
Latin American and Caribbean Flood and Drought Monitor – What it does and does not do Figure showing current system Coarse resolution 25km, daily Satellite.
Tom Hopson, NCAR (among others) Satya Priya, World Bank
*CPC Morphing Technique
Flood Forecasting for Bangladesh
Case study: July 2016 Bihar and Assam floods
Hydrologic Considerations in Global Precipitation Mission Planning
Tom Hopson, NCAR (among others) Satya Priya, World Bank
Precipitation Products Statistical Techniques
Methodology to integrate dynamical and statistical weather forecasts
Jennifer Boehnert Emily Riddle Tom Hopson
Applications of Medium Range To Seasonal/Interannual Climate Forecasts For Water Resources Management In the Yakima River Basin of Washington State Shraddhanand.
Nathalie Voisin, Andy W. Wood and Dennis P. Lettenmaier
Rain Gauge Data Merged with CMORPH* Yields: RMORPH
Application of a global probabilistic hydrologic forecast system to the Ohio River Basin Nathalie Voisin1, Florian Pappenberger2, Dennis Lettenmaier1,
N. Voisin, J.C. Schaake and D.P. Lettenmaier
An Inter-comparison of 5 HRPPs with 3-Hourly Gauge Estimates
Verifying Ensemble Forecasts
Presentation transcript:

Operational Seasonal Forecasting for Bangladesh: Application of quantile-to-quantile mapping Tom Hopson Peter Webster Hai-Ru Chang Climate Forecast Applications for Bangladesh (CFAB)

Overview: Seasonal forecasting I.Quantile-to-Quantile Mapping: seasonal forecasting of precipitation and river discharge II.What leads to good discharge forecast skill? III.Precipitation products IV.Quantile-to-Quantile Mapping: shortterm forecasting of precipitation V.A warning about using Probabilistic Precip Forecasts in Q modeling (or: Importance of Maintaining Original Ensemble Spatial and Temporal Covariances)

Three-Tier Overlapping Forecast System Developed for Bangladesh SEASONAL OUTLOOK: “Broad brush” probabilistic forecast of rainfall and river discharge. Updated each month. Produced out to 6 months, currently most useful skill out 3 months DAY FORECAST: Forecast of average 5-day rainfall and river discharge 3-4 weeks in advance. Updated every 5 days DAY FORECAST: Forecast of rainfall and precipitation in probabilistic form updated every day. Considerable skill out to 5-days. Moderate skill 5-10 days.

Utility of a Three-Tier Forecast System SEASONAL OUTLOOK: Long term planning of agriculture, water resource management & disaster mitigation especially if high probability of anomalous season (e.g., flood/drought) DAY FORECAST: Broad-scale planning schedules for planting, harvesting, pesticide & fertilizer application and water resource management (e.g., irrigation/hydro-power determination). Major disaster mitigation resource allocation DAY FORECAST: Detailed agriculture, water resource and disaster planning. E.g., fine tuning of reservoir level, planting and harvesting.

Seasonal Forecast Bias

Quantile-to-Quantile Approach to Remove Biases: applied to Seasonal Forecasts of Precipitation and Discharge 1)Precipitation: mapped to historic observed precipitation cumulative PDF’s -- Brahmaputra, Ganges, and combined catchment-average values -- done independently on 1-mo, 2-mo, …, 6-mo forecasts 2)Discharge: -- precipitation forecast cumulative PDF’s mapped to observed historic discharge cumulative PDF’s (similar approach used for day forecasts)

Pmax 25th50th75th100th Pfcst Precipitation Quantile Pmax 25th50th75th100th Padj Quantile Quantile to Quantile Mapping For 1-, 2-, …, 6-month Precipitation Forecasts Model Climatology“Observed” Climatology

Pmax 25th50th75th100th Pfcst Precipitation Quantile Pmax 25th50th75th100th Padj Quantile Quantile to Quantile Mapping For 1-, 2-, …, 6-month Discharge Forecasts Model Precip Climatology“Observed” Q Climatology Optimal correlation: Brahmaputra discharge 11-day lagged; Ganges discharge: 21 day lagged

The Climate Forecast Applications Project CFAB Good forecasting skill derived from: 1) Spatial scale of the basins 2) Satellite-raingauge estimates 3) ECMWF forecast skill 4) Partnership with FFWC/IWM => Utilize good quality daily border discharge measurements near-real-time

-- Increase in forecast skill (RMS error) with increasing spatial scale -- Logarithmic increase 1) Spatial Scale

2) Precipitation Estimates 1)Rain gauge estimates: NOAA CPC and WMO GTS 0.5 X 0.5 spatial resolution; 24h temporal resolution approximately 100 gauges reporting over combined catchment 24hr reporting delay 2)Satellite-derived estimates: Global Precipitation Climatology Project (GPCP) 0.25X0.25 spatial resolution; 3hr temporal resolution 6hr reporting delay geostationary infrared “cold cloud top” estimates calibrated from SSM/I and TMI microwave instruments 3)Satellite-derived estimates: NOAA CPC “CMORPH” 0.25X0.25 spatial resolution; 3hr temporal resolution 18hr reporting delay precipitation rain rates derived from microwave instruments (SSM/I, TMI, AMSU-B), but “cloud tracking” done using infrared satellites

Rain gauge estimates: NOAA CPC and WMO GTS

Comparison of Precipitation Products: Rain gauge, GPCP, CMORPH, ECMWF

Good comparison for all products at large spatial scales

Hydrology model initial conditions driven by near-real- time GPCP / CMORPH / Raingage precipitation Ideally, observations would be statistically “just another ensemble member” Approach: calculate historical NWP-climatology PDF and observation-climatology PDF for each grid using a “kernel” method For each forecast ensemble, determine its quantile in model- space and extract equivalent quantile in observation-space ECMWF Ensemble Precipitation Forecast Adjustments -- mapping forecasts from “model-” to “observational-”space Brahmaputra Catchment-avg Forecasts

Pmax 25th50th75th100th Pfcst Precipitation Quantile Pmax 25th50th75th100th Padj Quantile Quantile to Quantile Mapping Done independently for 1-, 2-, …, 10-day forecasts Model Climatology“Observed” Climatology

Point: Mapping preserves the spatial (and temporal) features of the precipitation forecast fields (i.e. preserves the spatial and temporal covariances)

OriginalAdjusted Rank Histogram Comparisons

ECMWF Ensemble Precipitation Forecast Adjustments -- mapping forecasts from “model-” to “observational-”space Brahmaputra Adjusted Forecasts Benefits: --Gridded “realistic” forecast values --spatial- and temporal covariances preserved Drawbacks: --limited sample set for model-space PDF (2 yrs) --rank histograms show “under-variance” Mean-Square-Error of the Ensemble- Mean shows skill out to 7-8 days

A Cautionary Warning about using Probabilistic Precipitation Forecasts in Hydrologic Modeling (Importance of Maintaining Spatial and Temporal Covariances for Hydrologic Forecasting) River catchtment A subB subC ensemble1ensemble2ensemble3 QBQB QCQC QAQA Scenario for smallest possible Q A ? No. Scenario for largest possible Q A ? No. Q A same For all 3 possible ensembles Scenario for average Q A ?

Conclusions Seasonal Forecasts currently have skill out to about 3 months Possible increased lead-time skill through new statistical approach “Downscaling” (and other methods) holds promise for increased discharge forecast skill Caution: monthly forecasts won’t necessarily forecast extreme daily flooding

Thank You!