4th Quarter Contractor Business Meeting December 14, 2012 Mike Kehoe Plant Engineering Facilities Session.

Slides:



Advertisements
Similar presentations
Facilities Management and Design Chapter 4 Safety and Security systems.
Advertisements

Department of Environmental Quality Environmental Management System Overview.
4th Quarter Contractor Business Meeting November 4, 2011 Mike Kehoe Plant Engineering Facilities Session.
Workplace Safety. Agenda Safety in the Workplace Safety committee The role of Risk Management Accident reporting Light duty pilot Accident prevention.
1st Quarter Contractor Business Meeting March 9, 2012 Mike Kehoe Plant Engineering Facilities Session.
ODH Fans and Work Planning Protecting Against the Big Event 10 Questions Before Starting a Job at C-AD Photo of the Week Collider-Accelerator Department.
1st Quarter Contractor Business Meeting March 13 th, 2015 Yesika L. Kain/Ben Mulherin Plant Engineering Facilities Session.
SafeLandUSA. What is SafeLandUSA? SafeLandUSA is a volunteer organization comprised of major and independent operating companies, industry associations,
LOCKOUT / TAGOUT How to Effectively & Efficiently Control Hazardous Energy LOTO Presentation – Worker, 9/2004.
3 rd Quarter Contractor Business Meeting September 9, 2011 Mike Kehoe Plant Engineering Facilities Session.
Cleaning, Sanitation, and Safety Chapter 4. Sanitation  Standards of cleanliness and sanitation will be only as high as those established and enforced.
1 NOTES This presentation is an outline of some of the most important aspects of DOE O 440.1B For completeness, copies of the Order should accompany this.
2.01 Understand safety procedures
Lumbermen’s Underwriting Alliance
Rail Safety Committee Mid Year Meeting December 2011
Contractor Safety Programs Ron Scholtz- REA, CHMM April 8, 2008.
Process Safety Management - Tips for the Little Guy.
January 5, Review of Emergency Operations Plan Tasks and Citations Tips & tools for creating your plan and avoiding deficiencies.
AUDITING INFORMATION SYSTEMS SECURITY. AUDIT OF LOGICAL ACCESS USE OF TECHNIQUES FOR TESTING SECURITY USE OF INVESTIGATION TECHNIQUES.
Standard 29 CFR Part Flammable & Combustible Liquids.
EGRESS AND FIRE PROTECTION
Health & Safety in Construction Key Issues for Designers, Managers & Contractors.
Applying Action Based Safety One Will Die: The John Martin Story.
Michael P. Andrews NuMI Shutdown & Facility Coordinator LBNE Project ESH Manager AD ESH Special Projects Coordinator.
Corporate Health and Safety ArcelorMittal RS# 6 Emergencies and Incidents Draft date: Oct 5, 2011 Rev 1.
Safe Learner Induction Stage 1 (College)
3nd Quarter Contractor Business Meeting September 14, 2012 Mike Kehoe Plant Engineering Facilities Session.
Construction Health and Safety Management By Dr Simon Smith – licensed under the Creative Commons Attribution – Non- Commercial – Share Alike License.
Standard 29 CFR Part Lockout / Tagout. Lockout/tagout agenda In today’s presentation, we will discuss the following: Terminology Energy sources.
Process Safety Management
Commissioning of Fire Protection and Life Safety Systems Presented by: Charles Kilfoil Bechtel National Waste Treatment Plant Richland WA.
Standard 29 CFR Part Hazard Communication.
Lockheed Martin Missiles and Fire Control
“Incident Free Starts With ME”
Management Commitment to Safety The management of DeBusk Services Group, LLC is dedicated to providing the active leadership and support necessary to develop.
Construction HSE Guideline _ 2005
 The purpose of this Lockout/Tagout Procedure is to have a positive method of confirming that a piece of equipment, machine, or device is not energized.
Safety organization and training. The biosafety officer and biosafety committee A safety policy, A safety manual, and Supporting programmes for their.
MODULE 6 Vehicle Parking, Servicing, and Security.
SafeLandUSA. What is SafeLandUSA? SafeLandUSA Goal SafeLandUSA Goal To define the standard for a widely accepted health, safety, & environmental orientation.
GOPAL DUTT PANDEY JOINT SECRETARY, NSC UP CHAPTER 1 SAFETY & HEALTH IN CHEMICAL INDUSTRY An outline of various facets of safety and health in a chemical.
FIRE SAFETY.
Considering Workplace Exposure Initial findings from the Construction CIP.
Jim Smith CONFINED SPACE Understanding the Space Park Requirements.
Multi-Employer Work Sites and Hazard Communication Michigan Industrial Hygiene Society Professional Development Conference January 26, 2012.
What is a safe work permit? A safe work permit is a written record that authorizes specific work, at a specific work location, for a specific.
2nd Quarter Contractor Business Meeting June 8, 2012 Mike Kehoe Plant Engineering Facilities Session.
SAFETY AND HEALTH IN OIL GAS EXTRACTION NAHUEL IVAN CASTILLO 2015.
NASA JSC David T. Loyd Safety and Test Operations Division
Harwood Grant #46J6-HT13Southwest Safety Training Alliance Inc1 Module 6 Other Construction Hazards.
Health & Safety in Construction 4A7 Design & the Built Environment John O’Connor.
Personal details: ENG.Iqbal AL-tayyar Bachelor in Mechanical Engineering from Kuwait university. Director of Technical Supervision Department. Applied.
Work by contractors And Safety Coordination CONTRACTORS ’ ACTIVITIES What is the role of TSOs when contractors are working in their area? HSE Unit - Olivier.
Engineering Environment Awareness
Hot Work Permit Osan AB Fire Emergency Services.
CDM Site Induction. Welcome to the ICC. Contents CDM Who’s who Welfare Hall Access Policy Site Rules Emergency Evacuation.
Process Safety Management Soft Skills Programme Nexus Alliance Ltd.
Author: Eng. Abdel-Razek Rashwan QHSE Senior Consultant CAE-Egypt Safety in Global.
Learning Objective 1 Describe the classroom settings and arrangements commonly used for fire and emergency services training.
SERVICES, LLC 1 1.
Site Safety.
One Will Die: The John Martin Story Applying Action Based Safety
FACILITY EMERGENCY PROCEDURES
Safety is part of our culture at Halliburton
Understanding the Space Park Requirements
Introduction: Phosphates’ Life-Saving Rules.
Start JSA Team JSA Note Inspect Site Hazards Resolve JSA Sign Permit
APPROACHING OTHERS “Top 10 List”
Presentation transcript:

4th Quarter Contractor Business Meeting December 14, 2012 Mike Kehoe Plant Engineering Facilities Session

Agenda –Product use in sensitive areas –Access to Life Saving stations –No parking or material in crane paths –Hydrostatic testing IAW Ch. 8 of Health and Safety Manual –Scheduling of shutdown work LOTO or 3 rd rail tagging from O43 during shutdown –FMEDs –SAFETY Cutting/sawing/core drilling into concrete decks Contractor’s not using their LOTO tags with NNS tags. Second leading finding in monthly audits. H&S Audit findings 2

Product Use in Sensitive Areas All products must be approved for use in the plant –MSDS approval required by 027 Environmental Health & Safety Avoid opportunity for generation of mixed waste Review with your coordinator before using products 3

Access to Life Saving Station During construction, be aware of locations of the life saving stations on water front areas Maintain clear access to the life saving stations 4

Crane Path REMINDER Do not park vehicles in crane path Do not obstruct crane path with material 5

Unplanned Event – B4636 River Water Pump House Leak 6 October 16, B4636 river water pump house River water system was being modified System was pressurized Hydrostatic testing failed Test was not conducted in accordance with Chapter 8 of H&S Manual

Scheduling of shutdown work On, or before December 17, provide information to your coordinator if you are planning to work between December 21 and January 2. Need location and point of contact. If any work requires technical support for LOTO or 3 rd rail tagging from O43, PLAN AHEAD. We have a lot of work that will occur during shutdown. We do not want to slow 043 work by emergent LOTO issues. 7

FMED’s FMED - Foreign Material Exclusion Device Use from the start of the project Maintain cleanliness of pipe systems –Tape, cuttings, and dirt were found in our pipe systems Foreign material in process gas piping is dangerous to the user 8

O27 - Safety Cutting/sawing/core drilling into concrete decks Contractors are not using their LOTO tags with NNS tags. Second leading finding in monthly audits 9

O27 - Safety 2012 H&S Audit Findings 20% of hot work operations requiring fire watches did not have fire watches on duty 47% of fire watch trained employees were not able to identify the different classes of fire, extinguishing agents, the stages of fires and methods for extinguishing fires 53% of employees failed to recognize that CO 2 can displace oxygen in a confined space 20% of hot workers observed did not have the required 8-inch boots or spats 10

Comments? 11

QUESTIONS???? If you have questions regarding this presentation, please contact your Contract Coordinator or: Mike Kehoe O41 – Plant Engineering