ABANDONED CABLE REMOVAL Big Opportunity for Contractors By Frank Bisbee.

Slides:



Advertisements
Similar presentations
WAYNE DALTON OF SYRACUSE PRESENTS:
Advertisements

AT&T strives to provide a smooth and successful installation experience for our Customers. We will do all that we can to install your service on time and.
RiT PatchView Solution
Chapter 7: Physical & Environmental Security
Telecommunication Rooms
TESTING AND BALANCING IN HEALTHCARE FACILITIES. What is Test & Balance The art of establishing air and water flows to meet design criteria. Total System.
Confidential and proprietary materials for authorized Verizon personnel and outside agencies only. Use, disclosure or distribution of this material is.
Performance and Safety Issues Found in Offshore Communications Cable Products Improvements Needed to Conformance Testing Programs in North America October.
Chapter 3: Planning a Network Upgrade
East Carolina University Compressed Gas Safety Training Program
FIRE DOOR INSPECTIONS NFPA 80 STANDARDS THIS STANDARD REGULATES THE INSTALLATION AND MAINTENANCE OF ASSEMBLIES AND DEVICES USED TO PROTECT OPENINGS IN.
Electronics Stewardship Tim Hilton
 ELECTRICAL SAFETY Gerald P. Robinson Jr., P.E. – Hatch Mott MacDonald.
Universal Waste Management Training. Introduction DEC and EPA have established standards for the handling of “Universal Wastes”. “Universal Wastes”, in.
MARKETS AND ABATTOIRS The construction sites should be free of nuisance conditions, contamination, should have available adequate water supply for cleaning.
“TI” Ohhhh….. (TIO) (No TIO is not a person!) What is it all about?
Welcome to the Fiber to the Home (FTTH) Informational Meeting 1.
National Electrical Code codified by Massachusetts 2011 edition Always consult with the Inspector of Wires (AHJ) for his or her interpretation of the Code….
BS9990 : 2015 Updates and/or Changes
Emergency Lighting Code Review Presented by Iota Engineering LLC.
ELECTRICAL SAFETY / E N V I R O N H & S T R A I N I N G P R O G R A M ELECTRICAL SAFETY OSHA requires that electrical equipment be approved for use and.
Texas Department of Insurance State Fire Marshall’s Office Sixth Report on State University Fire Safety January 2002.
Telecom Cabling Cable pathways.
School for drafting regulations Nuclear Safety Decommissioning Vienna, 2-7 December 2012 Tea Bilic Zabric.
Project Close Out CTC-470.
LABORATORY ELECTRICAL SAFETY Discussion topics: Electrical shock hazards Identifying hazards Research apparatus/ systems Proper emergency procedures Electricalfor.
Structured Cabling Overview
AGENDA INTRODUCTION CELLS AND COMPONENTS PV PERFORMANCE PV APPLICATIONS CODES AND STANDARDS EMERGENCY RESPONSE.
Lumbermen’s Underwriting Alliance
Permit to Work Procedure Document Number: KOC.SA.004
1 INTRUSION ALARM TECHNOLOGY CABLING FOR BURGLAR ALARMS.
Confidential and proprietary materials for authorized Verizon personnel and outside agencies only. Use, disclosure or distribution of this material is.
1 of 15 Coleman Cable, Inc. Copyright © 2006 All Rights Reserved. FIRE ALARM CABLE Objectives By end of this module you should able to: Know What Really.
Oberon Webinar: Cabling and Infrastructure for Enterprise Wireless Networks 1 Wireless Connectivity in Healthcare Facilities Scott D. Thompson President.
/0203 Copyright ©2002 Business and Legal Reports, Inc. BLR’s Safety Training Presentations Safety and Health Program.
9.1 General HSE 1.Goal: zero harm to people and environment in regard of the assets and operation 2.HSE performance measured based on internal and external.
Commissioning of Fire Protection and Life Safety Systems Presented by: Charles Kilfoil Bechtel National Waste Treatment Plant Richland WA.
Organization and Implementation of a National Regulatory Program for the Control of Radiation Sources Staffing and Training.
1 Telecom Cabling THE NATIONAL ELECTRIC CODE AND THE STANDARDS THE NATIONAL ELECTRIC CODE AND THE STANDARDS.
1 Structured media enclosure (distribution device) Structured media enclosure (distribution device) BASIC TELECOMMUNICATIONS.
1 Telecom Cabling Residential cabling. 2 Telecom Cabling Approximately 1.6 million new homes are being built in the United States each year, and a surprisingly.
OSU-CHS ALARA Statement The OSU-CHS radiation safety program will be conducted in such a manner so that exposure to faculty, staff, students, the public,
Code Officials and the Code Process.  To design the interior of the building in conjunction with codes, standards and federal regulations required in.
CABLING SYSTEM ADMINISTRATION. Administration Concept.
Signamax™ Cabling System Design Principles & Installation Practices Revision A.
Signamax™ Cabling System Review Revision E. INTRODUCTION.
International Security Management Standards. BS ISO/IEC 17799:2005 BS ISO/IEC 27001:2005 First edition – ISO/IEC 17799:2000 Second edition ISO/IEC 17799:2005.
Presented by Matt McClymonds.  Project Essentials ◦ Project Objective  Prepare the campus for a new telephone system ◦ External Conditions  Converged.
TELECOMMUNICATIONS SPACES
Authorization Part III. Content of a license Structure of a license General elements General and specific conditions Annexes Documents attached (e.g.
Code Officials and the Code Process.  Concentrates on the code process as a whole.  Different type of code officials  Various steps that are taken.
1 Figure 2-6: Building Security Building Security Basics  Single point of (normal) entry to building  Fire doors, etc.: use closed-circuit television.
An introduction to… Lockout Tagout. Aim Every year thousands of workers get killed or injured while performing repairs or maintenance on industrial equipment.
Office of Management and Enterprise Services Central Purchasing Division Keith Gentry Contract Manager
COMMUNICATION SYSTEMS IN BUILDINGS/CAMPUSES
“Success in Safety”.
INTRODUCTION TO NETWORK CABLING
Clinical Engineering Lecture (3).
THUM Adapter Impact on Hazardous Area Classification
PPE Program 29 CFR OSHA requirement for this company to have a Personal Protective Equipment Program to protect employees from exposure to.
East Carolina University Compressed Gas Safety Training Program
ASHRAE, California Title 24, NEC
TxDOT Utility Related Issues
AGENDA INTRODUCTION CELLS AND COMPONENTS PV PERFORMANCE
General Requirements of NFPA 101
AGENDA INTRODUCTION CELLS AND COMPONENTS PV PERFORMANCE
State Electrical Division North Carolina Department of Insurance
Presentation transcript:

ABANDONED CABLE REMOVAL Big Opportunity for Contractors By Frank Bisbee

2 Before we start VDV/IBS Conference attendees Our job is to deliver a quality presentation. Your task is to gather valuable information. If you finish before me, Please leave the room quietly So you don't wake the others

3 WHAT IS ABANDONED CABLE ?

4 WARNING Cabling installation is not for the untrained CAT6 cabling systems are CRAFT INTENSIVE Extreme care must be used when installing or servicing CAT6 cable systems MARCS = Moves, Adds, Removals, & Changes demand the same level of care Our surveys indicate this is a universal rule for all (Vendors) CAT6 cabling systems

5 National Electrical Code NEC 2002  The definition of abandoned cable, as found in paragraphs and of the NEC 2002 Book, states "....Installed communications cable that is not terminated at both ends at a connector or other equipment and not identified "For Future Use" with a tag."

6 Codes & Standards ?  The Codes ensure minimum construction quality and ensure safety of life, health and property.  Standards, on the other hand, guarantee that the voice outlet will work. electricians, Inspectors and Low Voltage contractors use the NEC 2002 Codebook for installation and inspections

7 NEC 2002 The definition of abandoned cable, as found in paragraphs and of the NEC 2002 Book, states "....Installed communications cable that is not terminated at both ends at a connector or other equipment and not identified "For Future Use" with a tag." The Codes ensure minimum construction quality and ensure safety of life, health and property.

8 For copper cable, paragraph (B) of the NEC Code states "...The accessible portion of abandoned communications cables shall not be permitted to remain.." Additionally, paragraph (1) states that abandoned cables in vertical runs shall not be permitted to remain. Article 770 states the same requirements for optical fiber risers and horizontal cables.

9 Identify abandoned cables per 2002 NEC requirements Tag, Inventory & Document existing & Abandoned Cable Telephone & Data circuits, telecom & network equipment

10 Why does abandoned cable present such a problem? The accumulation of miles and miles of cabling left in the ceilings and walls of facilities has become a major concern for life safety over the past 10 years. Cables that are abandoned in ceilings, riser systems, and air-handling systems are a source for fueling fire, smoke, and sublethal toxic fumes that can incapacitate. In addition, PVC jackets tend to break down over time. This decomposition process is accelerated by exposure to increased temperatures and humidity. The new fire safety provision to require the removal of abandoned cable is the first change to cabling requirements in the National Electrical Code in more than 20 years.

11  Tag & Inventory abandoned cable & equipment in Riser & Telecommunication Rooms & Plenum areas  On-site assessment of property’s telecommunications infrastructure and development potential  Inspection and inventory of existing telecommunications infrastructure and pathways  Summary recommendations

12  On-site identification & tagging of abandoned riser cabling, hardware & equipment by field technician  Removal of tagged cable, hardware, and equipment is available  Progress reports at regular intervals for duration of the project

13 According to estimates, there is more than 45 billion feet of plenum cable in place in buildings. The National Electrical Code (NEC 2002) requires that all abandoned copper and fiber cable be removed.

14 As the code is enforced across the country, building owners and tenants could face thousands of dollars in additional cost to remove and dispose of the abandoned cables, tag and manage the remaining cable plant in their riser and communications areas, and ensure that tenants install proper cables to meet the building requirements for fire and safety of their other tenants.

15 Authority Having Jurisdiction (AHJ): The “Authority Having Jurisdiction” is the organization, office and/or individual responsible for “approving” equipment, an installation, or a procedure. Note: the phrase “authority having jurisdiction” is used in a broad manner since jurisdictions and “approval” agencies vary as do their responsibilities. Approved: Acceptable to the Authority Having Jurisdiction (AHJ) The Enforcers

16 BOMA International recommends that you begin immediately to survey your buildings. Are there wires that are not being used? If so, identify the wiring by the service they performed, and the brand or model of cable. The NEC 2002 allows certain types of wires to be retained if they are tagged for future use. Any cable that is not in the category permitted for future use must be removed.

17 All cabling end users should understand the implications of not complying with these new NEC Codes. They are based on safety of the employees and rescue personnel. Ignoring safety measures creates the potential for legal actions. Complying with safety measures produces longer installation times and expenses in the form of T&M expenses for removal and labeling “For Future Use.” Cabling Installers are required to inform end users about these new codes and their potential impacts.

18 Rip it out, throw it away – that’s the easy way? Test it, tag it, and turn it into an asset? Audit and document the “hard” infrastructure? Be the building owner’s and tenant’s best friend. The cabling systems are not a throw away expense. REMOVE, REUSE, OR RECYCLE

19 For additional information Visit Communication Planning Corporation 4160 Southside Blvd., Suite 3 Jacksonville, FL Tel Fax Frank Bisbee, President March 11, 2004