Federal Aid Project No. STP 2603 (501) Environmental Assessment

Slides:



Advertisements
Similar presentations
Resource Team/TEER Meeting October 19, CBRT Meeting October 19, 2006 Agenda 10:00 AM 10:05 AM 10:30 AM 11:30 AM Noon Introductions and Housekeeping.
Advertisements

Fern Valley Interchange Public Hearing November 3, 2010.
NORTH HOUSTON HIGHWAY IMPROVEMENT PROJECT Environmental Impact Statement and Preliminary Engineering Public Scoping Meeting Tuesday, November 15, 2011,
Alachua County BoCC Meeting November 8, Project Background and Location Study Purpose Study Activities Bridge Alternatives Evaluation Schedule.
New I-65 Interchange at Worthsville Road Welcome!.
U.S. 33 Northern Connector Alternative
JANUARY 9, 2002 SCAJAQUADA CORRIDOR STUDY Grant Street to Parkside Avenue City of Buffalo Fisher Associates Joseph Passonneau & Partners In Association.
South Side Red River Bridge Corridor Study Phase III Preliminary Geotechnical Study Phase IV New Alignment Alternatives Evaluation.
Environmental Assessment Public Meeting
TBG MKE West Waukesha Bypass Study Community Sensitive Solutions Advisory Group Meeting No. 5 January 31, 2011 Community Sensitive Solutions.
Tysons 1 Operational Analysis of Dulles Toll Road Ramps to Tysons Board Transportation Committee Meeting September 17, 2013 Seyed Nabavi Fairfax County.
South West Study Area Introduction ► Summary of Study Area ► Unified Development Code Amendments ► Points of Interest ► Staff Recommendation ► Review.
River to Sea TPO May 28, 2014 River to Sea TPO May 28, “I-4 BEYOND the ULTIMATE” PD&E REEVALUATION STUDY From west of US 27 to west of Kirkman Road.
Texas Department of Transportation Corpus Christi District Harbor Bridge Project U.S. 181 (Harbor Bridge)/SH 286 (Crosstown Expressway) Agency Scoping.
Clinton Street Bridge over the Maumee River ODOT Project DEF May 14, 2015 Public Meeting.
Future Transportation Projects within the Loxahatchee River Basin Florida Department of Transportation District IV 3400 W. Commercial Blvd W. Commercial.
Anacostia Streetcar Phase 2 Environmental Assessment & Section 106 Evaluation: Community Workshop January 12, 2011.
Environmental Assessment Public Information Meeting – September 2010 Realignment of a Portion of a Utah Lake Drainage Basin Water Delivery System (ULS)
Congressional District Projects New CD-3 SMART 160 Trail: — This trail will be a multiple use trail and will offer access to a network of current and proposed.
OSU Airport – Overview of Master Plan and Draft Environmental Assessment Purpose of an Airport Environmental Assessment (EA) Identify environmental impacts.
Barrington Road at Jane Addams Memorial Tollway (Interstate 90) Interchange Improvement Study Hoffman Estates Village Hall June 27, 2012.
Page 1 MINISTRY OF TRANSPORTATION Cyrville Road Bridge Replacement at Highway 417 (Ottawa Queensway) Detail Design Study Group Work Project
County of Fairfax, Virginia Department of Transportation Richmond Highway Transit Center Feasibility Study Briefing with the Fairfax County Transportation.
Alachua County Future Traffic Circulation Corridors Map Project July 10 th, 2007.
STATE ROUTE 1 ALAMITOS BAY BRIDGE IMPROVEMENT PROJECT SCOPING MEETING AUGUST 5, :00 p.m.Open House 6:30 p.m.Presentation 7:00 p.m.Public Comment.
CHAPTER 3 SCOPING AND AGENCY COORDINATION. Scoping - the procedure for determining the appropriate level of study of a proposed project/activity - process.
The purpose is to explore methods to improve the safety, capacity, and mobility of Falling Springs Boulevard, US 60, and adjoining roads.
SR 1 BLUFFTON Public Hearing September 25, INDOT Mission: INDOT will plan, build, maintain and operate a superior transportation system enhancing.
Cape Fear Skyway STIP Project No. U-4738 Federal Aid Project No. STP-0017(53) WBS No New Hanover and Brunswick Counties, North Carolina October.
1 Patriot’s Crossing  PROVIDES MOST REGIONAL CONGESTION RELIEF  UNIQUELY POSITIONED TO SUPPORT REGIONAL ECONOMIC GROWTH  IMPROVING TOTAL REGIONAL CONNECTIVITY.
U N I T E D S T A T E S D E P A R T M E N T O F C O M M E R C E N A T I O N A L O C E A N I C A N D A T M O S P H E R I C A D M I N I S T R A T I O N State.
WELCOME! July 31, 2012 ODOT District July 31, 2012 PURPOSE OF TONIGHT’S MEETING Introduce the project –Reconstruct I-75.
Transportation and Transit Committee 4 December 2002 Albion Road Corridor Study.
Metro South Planning MetroLink in South St. Louis County Metro South MetroLink Extension Alternatives Analysis and Draft Environmental.
State Road 5 over Eel River Bridge Rehabilitation DES# South Whitley Community Public Library Thursday, February 5, :30 p.m. Please silence.
Applicant: eThekwini Transport Authority Environmental Consultants Engineers Pravin Amar Development Planners Iliso Consulting.
Texas Department of Transportation Corpus Christi District Harbor Bridge Project U.S. 181 (Harbor Bridge)/SH 286 (Crosstown Expressway) Citizens Advisory.
Fern Valley Interchange Project Development Team Meeting February 3, :00 – 11:00 p.m.
CHAPTER 4 ALTERNATIVES. --- “The driving impetus for conducting environmental impact studies is to comparatively present the effects of proposed alternatives.
Public Involvement Meeting December 10,  Introduce the project  Explain the benefits of the project  Discuss tasks completed since last public.
U.S. 20 Intersection Improvement Project at Waverly Road Porter Town Hall Thursday, August 13, 2015.
Texas Department of Transportation Corpus Christi District U.S. 181 (Harbor Bridge) Environmental Documentation and Schematic Development Citizens’ Advisory.
I-465 at I-65 Interchange Modification Public Meeting 6:00pm Monday, October 1, 2012 South Grove Intermediate School Beech Grove, Indiana.
Texas Department of Transportation Corpus Christi District U.S. 181 Harbor Bridge Project Environmental Documentation and Schematic Development Public.
CPPJ Meeting January 27, 2014 Project Team. Lake Charles MPO - Calcasieu Parish Chapters: 1.Introduction and Transportation Planning Process 2.Regional.
RIVERSTONE CONNECTION STUDY Task Force Meeting #4 June 19, 2013.
Introductions U.S. Army Corps of Engineers Metro Parks Mayor’s Office Metro Council District Representatives HDR, Inc.
Secondary & Cumulative Effects Analysis Training Program Module 1: How to Determine Which Resources Should be Considered in a SCEA How to identify what.
EAST BATON ROUGE PARISH PECUE LANE/I-10 INTERCHANGE EAST BATON ROUGE PARISH CITY/PARISH PROJECT NO. 09-CS-US-0041 STATE PROJECT NO. H FEDERAL AID.
Waterdown Road Corridor Class Environmental Assessment (Phase 3 & 4) Community Services Committee May 9, 2012.
Iron Range Tourism Bureau April 25, 2013 Hwy 53 Update.
PAC Meeting July 2, Agenda  Introductions and thanks  Project to date  Next steps  Questions.
11 Ina Road Traffic Interchange Project Update Marana Chamber of Commerce Business Connection Luncheon May 18, 2016 Greg Byres, PE, Senior Urban Project.
Council Presentation January 2014 Lauzon Parkway Improvements Class Environmental Assessment Study County of Essex.
Texas Department of Transportation Corpus Christi District U.S. 181 Harbor Bridge Project Environmental Documentation and Schematic Development Citizens.
Project Development and Environmental Study (PD&E) S.R. 30 (U.S.) 98 Gregory Street and Bayfront Parkway at 17 th Avenue Intersection Project Development.
County Road 19(Manning Road) & County Road 22 Improvements Environmental Study/ Preliminary Design Report November 2008.
View display boards and speak one-on-one with staff
Interstate 15 North 4/09/2015 Update
Interstate 15 North Phase 4
US 181 Harbor Bridge Project
River to Sea TPO Meeting US 92/International Speedway Boulevard
Clifton Corridor Transit Initiative
I-85 Widening Project MM Cherokee County Public Hearing March 14, 2017.
I-85 Widening Project MM Cherokee County Public Hearing March 14, 2017.
Meadow Lake Boulevard Street Extension Project
U.S. 20 at State Road 2 New Interchange
About Rio Grande Pacific Corporation
West Cervantes Traffic Feasibility Study Jill Lavender, Transportation Planner Cory Wilkinson, AICP CEP, Project Manager Mary Morgan, PE, Engineer.
Presentation transcript:

Federal Aid Project No. STP 2603 (501) Environmental Assessment Lower Harvey Canal Crossing State Project No. 700-26-0274 Federal Aid Project No. STP 2603 (501) Environmental Assessment PUBLIC MEETINGS JANUARY 11th & 13th , 2005

MEETING AGENDA Welcome / Introductions Project Overview: Purpose and Need for Project Environmental Assessment Alternatives Developed for Consideration Brief (30 min.) recess for examination of exhibits and one-on-one Q & A Public Comment and Questions Adjournment

PROJECT PURPOSE AND NEED NEED FOR NEW LOWER HARVEY CANAL CROSSING: West Bank is one of the remaining growth areas in the metro area south of Lake Pontchartrain. As most of the areas closer to the river have been developed , new growth is focused more towards the southern areas of Jefferson Parish and in Plaquemines Parish. Several transportation projects underway or under study to provide better access, both now and in anticipation of this growth:

1. Destrehan Avenue Widening, Lapalco to Patriot 2. Extension of Destrehan Avenue to Lafitte-Larose Hwy 3. Peters Road on- and off-ramps at West Bank Expressway 4. Extension of Harvey Blvd across Bayou Barataria Outfall Canal to Engineers Road 5. Extension of Peters Road via bridge across GIWW into Plaquemines Parish 6. Extension of Harvey Blvd to Peters Rd. 3 1 4 6 2 5

Upper Harvey Canal has 4 crossing points: LA 18, Harvey Tunnel, West Bank Expressway, Lapalco Blvd. No crossing of Harvey Canal below Lapalco Blvd., yet this is where growth is occurring Lapalco Blvd. currently has a narrowing at the Harvey Canal - the bridge is 4 lanes while the boulevard is 6 lanes on either side. New Crossing of Lower Harvey Canal is needed to address these issues.

PROJECT PURPOSE AND NEED Purpose of New Lower Harvey Canal Crossing : Provide added accessibility for West Bank residents and businesses Increase the capacity for east-west travel on the West Bank Become a key addition to the local hurricane evacuation network Could help commercial traffic, including flow from proposed Millennium Port

ENVIRONMENTAL ASSESSMENT Q: What is an Environmental Assessment? A: Study in which several tasks are performed:

ENVIRONMENTAL ASSESSMENT Define/Describe purpose and need for project Describe the area to be affected (study area) Develop alternative measures to be taken to address purpose and need (at least two: one will always be the No-Build Alternative) Build alternatives will be evaluated, and those that do not adequately address the purpose and need or which are not feasible will be eliminated from further consideration Describe and compare the impacts to the study area resulting from the alternatives: the Build Alternative(s) and the No Build Alternative Select a Preferred Alternative, and summarize its impacts Document all work, including Public Participation

3 preliminary areas for crossings: Lapalco (parallel span or widening), Harvey Boulevard, & Engineers Road area Engineers Road area eliminated due to physical constraints and lack of access for residents 2 types of bridge crossing considered at Harvey Blvd.: moveable-span and fixed-span 2 alternatives developed at Harvey Blvd; one includes Harvey Blvd. extension to Peters Rd., the other connects directly to Peters Road

DEVELOPMENT OF ALTERNATIVES Four Alternatives Considered: Alternative 1: Lapalco Blvd. Parallel Span Bridge (moveable span) Alternative 2: New Moveable Span Bridge at Harvey Blvd. connecting to Harvey Blvd. extension Alternative 3: New Fixed Span Bridge at Harvey Blvd. connecting to Harvey Blvd. extension Alternative 4: New Moveable Span Bridge at Harvey Blvd. corridor connecting to Peters Road

Evaluation of Build Alternatives Explore pros and cons, impacts of each Use information gathered to date Consider public input Complete Alternative Evaluation

Final Steps (after Alternative Evalaution) Examine and document likely environmental impacts of Build Alternative(s) vs. No-Build alternative Select Preferred Alternative Complete EA document and hold Public Hearing Obtain Finding of No Significant Impact (FONSI)

THANK YOU Lower Harvey Canal Crossing EA c/o N-Y Associates, Inc. Written Comments may be sent to: Lower Harvey Canal Crossing EA c/o N-Y Associates, Inc. 2750 Lake Villa Dr. Metairie, LA 70002 Letters should be postmarked by January 23rd, 2005