DoE Review June 6-7, 2000 Current Detector Configuration June 6, 2000  Solenoid, Central Preshower installed in central bore  A-layer MDTs installed.

Slides:



Advertisements
Similar presentations
HFT Technical Overview September 26, HFT 2013 TPC FGT 2011 STAR Detectors Fast and Full azimuthal particle identification EMC+EEMC+FMS (-1 ≤ 
Advertisements

1 Status of the CMS Pixel project Lorenzo Uplegger RD07 Florence 28 June 2007.
Status of Eric Kajfasz CPPM/Fermilab GDR-Susy, Lyon - 26 novembre 2001.
All DØ Meeting December 1, 2000 Uncle DØ Needs you!!! Commissioning Status & Plans Jae Yu All DØ Meeting Dec. 1, 2000 What have we been doing? What is.
Atlas SemiConductor Tracker Andrée Robichaud-Véronneau.
WP2: Detector development Summary G. Pugliese INFN - Politecnico of Bari.
13 January All Experimenters’ MeetingAlan L. Stone - Louisiana Tech University1 Data Taking Statistics Week of 2003 January 6-12 We had to sacrifice.
APS Meeting April 5-8, 2003 at Philadelphia Chunhui Luo 1 Chunhui Luo Inclusive J/ψ Production at DØ.
Workshop on Quarkonium, November 8-10, 2002 at CERN Heriberto Castilla DØ at Run IIa as the new B-Physics/charmonium player Heriberto Castilla Cinvestav-IPN.
The forward detectors of CMS Experiment at LHC Bolek Wyslouch MIT
EPS 2003, July 19, 2003David Buchholz, Northwestern University Performance of the D0 Experiment in Run II Detector Commissioning and Performance Accelerator,
Jiawen Zhang, IHEP, 2008, April 10, frascati Status of BEPCII/BESIII and Physics preparation Jiawen Zhang 2008/4/7—10 , PHIPSI08, Frascati.
Collaboration Mtg Cotober 11, 2000 Installation Status Opening Remarks Overview, logistics Recent events, status Outlook, concerns Conclusions Jon Kotcher.
Director’s Review Dec 1999 Tracker Integration and Installation W. E. Cooper 6 December 1999.
A Graphics Sampler for the D  Detector G. Alverson, K. Bos, T. Burnett, F. Canelli, D. Coppage, L. Duflot, Y. Gershtein, N. Graf, S. Hagopian, P. Hamel,
Forum March 2003H.Taureg1 Magnetic Fields in ALICE Mapping and Monitoring.
22 June 2000 D  NIU Workshop S. Doulas From Detector to Ntuples: Muons Steven Doulas Northeastern University Boston, MA D0 Muon Upgrade Group.
M&O status and program for ATLAS LAr calorimeter R Stroynowski (on vacations)
PRY Base - Contents l PRY Support/Base/Platform in the MICE Hall l History l Requirements l Environment l Design l Structural Integrity l Preparation l.
Progress Completed Order/Fabricate SS Piping for HBD Purge gas from all detectors DAQ tests Prep. for Shutdown work (open doors, move carriages, etc. Pave.
D0 Collab Mtg Feb 7, 2001 D0 Detector: Status for Run 2 Wistful reminiscences Near term: Roll in, detector status, next few weeks Latest from Beams Division.
PHENIX Run-13 status Hubert van Hecke 1Hubert van Hecke - 05 Feb 13 Time meeting.
PHENIX Run-13 status Hubert van Hecke for the PHENIX collaboration 1Hubert van Hecke - 05 Feb 13.
Run 12: STAR Status and Schedule Update RHIC Coordination Meeting October 18, 2011 Bill Christie BNL Outline Status update Schedule update and issues Summary.
Fermilab PMG Jan 20, 2000 Reconsideration of the Installation at D0  Overview  Major constraints  Basics of old, new schemes  Some details on each.
Forward Muon Installation and Commissioning Dmitri Denisov Fermilab Director’s review 7/12/1999 Plan Forward muon detectors Mini-drift tubes installation.
L0 Technical Readiness Review-Electronics Installation Linda Bagby L0 Electronics Installation  System Electronics Overview u Low Voltage s Filter.
LHCf: installation & commissioning Measurement of Photons and Neutral Pions in the Very Forward Region of LHC Oscar Adriani INFN Sezione di Firenze - Dipartimento.
PMG Meeting February 2000 A Split Central Silicon Tracker W. E. Cooper on Behalf of the D0 Silicon Group 3 February 2000.
D0 Status: 01/14-01/28 u Integrated luminosity s delivered luminosity –week of 01/ pb-1 –week of 01/ pb-1 –luminosity to tape: 40% s major.
1 PHENIX WEEKLY PLANNING December 3, 2015 Carter Biggs.
All Experimenters MeetingDmitri Denisov Week of July 7 to July 15 Summary  Delivered luminosity and operating efficiency u Delivered: 1.4pb -1 u Recorded:
D0 PMG 6/15/00 PMG Agenda June 15, 2000  Overview (Tuts) u Detector status u Reportable milestones u Financial status u Summary  Response to DOE review.
D0 Status: 04/01-04/08 u Week integrated luminosity –1.7pb -1 delivered –1.5pb -1 utilized (88%) –1.1pb -1 global runs u Data collection s global data.
Director’s Review of RunIIb Dzero Upgrade Installation Linda Bagby L0 Electronics Installation  System Electronics Overview u Low Voltage u High.
PSD upgrade - schedule/resources: electronics and cooling system F. Guber INR, Moscow NA61/SHINE upgrade workshop, CERN 3– 5 March, 2014.
PHENIX WEEKLY PLANNING 3/22/2007 Don Lynch. 3/22/2007 Weekly Planning Meeting 2 Schedule Re-Start 5 man shifts 3/20/07 Beam: blue ring 3/8/07, in yellow.
2007 Run Update for STAR Jeff Landgraf For the STAR collaboration.
India in DØ Naba K Mondal Tata Institute, Mumbai.
Detector Decommissioning Related Activities at DØ George Ginther Fermilab and University of Rochester 23 January 2012.
Muon Tracker Responsibilities This Year South arm commissioning through this year’s run Analysis Software oversight and development North Arm station 2.
FNAL All Experimenters Meeting January 7, Leslie Groer Columbia UniversityDØ Status 1 DØ Status and Progress Dec 17, 2001 – Jan 7, 2002  Reasonably.
Aurelio Juste (Fermilab) Rencontres de Moriond, March OUTLINE Tevatron Run 2 The upgraded DØ Detector Status Performance First Physics Results Outlook.
1 PHENIX WEEKLY PLANNING January 21, 2016 Carter Biggs.
D. Lincoln Run II MTG May 12, Y2K What will it take to get data out of the CFT?* Don Lincoln CFT Commissioning Czar Fermilab Run II Meeting May 12, Y2K.
CHIPP meeting Appenberg, 24 Aug 2009 Preparation for LHC beam, Jeroen van Tilburg 1/15 Jeroen van Tilburg (Universität Zürich) LHCb: Preparation for LHC.
DoE Review June 6-7, 2000 Installation and Commissioning of the D0 Detector Overview since last review Organization Current status Installation sequence,
D0 PMG February 15, 2001 PMG Agenda February 15, 2001  Overview (Weerts) u Detector status u Reportable milestones u Summary  Operations Organization.
LHCf Detectors Sampling Calorimeter W 44 r.l, 1.6λ I Scintilator x 16 Layers Position Detector Scifi x 4 (Arm#1) Scilicon Tracker x 4(Arm#2) Detector size.
D0 PMG 2/3/00 PMG Agenda Feb 3, 2000  Overview u Project Manager’s Report – Tuts u Fallback options – Weerts  Silicon Support Cylinder Modifications.
Director’s Review Dec 1999 DO Timeline Old Version J F M A M J J A S O N D J F M D Install silicon front-end ICD FPS Lum (L0) CFT install/hookup.
Collaboration Mtg April 14, 2000 DO Timeline J F M A M J J A S O N D J F M D Install silicon front-end ICD FPS Lum (L0) CFT install/hookup 1/2.
SPHENIX MECHANICAL D. Lynch September 11, AGENDA Global Design Concept – Updated Global Assembly Concept – Updated Inner HCal Installation concept.
DON LYNCH OCTOBER 28, October 28, 2014 sPHENIX Detector Integration & Assembly Concept.
D0 PMG 4/19/01 Completed Reportable Milestones MilestoneBaselineActualVar. H Half-Wedge Fabrication 20% Complete 10/15/99 0 w 3 Chip Ladder Fabrication.
MINER A at the Triple Point: Three Phases at once Deborah Harris AEM August 31, 2009.
SPHENIX MECHANICAL D. Lynch August 21, /15/2014sPHENIX Mechanical Design.
Status of the NOνA Experiment Satish Desai - University of Minnesota For the NOνA Collaboration APS Meeting - April 2013 Denver, Colorado.
SuperB Integration SuperB Experimental hall. Related topics of Slac D&D activities.
The CDF Upgrade - Incandela -CERN - January 26, 2001 slide 1 96 wire planes –(8 superlayers) –50% are 3 o stereo –Uniform drift (0.88 cm cell) –30,240.
Nikhef Scientific Meeting 2000Onne Peters D0 Muon Spectrometer December 14-15, Amsterdam Onne Peters Nikhef Jamboree 2000.
Arnd Meyer (RWTH Aachen) Sep 8, 2003Page 1 Integrated Luminosity Total data sample on tape with complete detector > 200pb -1.
EPS HEP 2007 Manchester -- Thilo Pauly July The ATLAS Level-1 Trigger Overview and Status Report including Cosmic-Ray Commissioning Thilo.
The LHCb Installation Story
Baby MIND beam test status
Kevin Burkett Harvard University June 12, 2001
CLAS12 First Experiment Workshop Report
Preparation of the CLAS12 First Experiment Status and Time-Line
PHYS 3446 – Lecture #18 Monday ,April 9, 2012 Dr. Brandt Calorimeter
Plans for the 2004 CSC Beam Test
Presentation transcript:

DoE Review June 6-7, 2000 Current Detector Configuration June 6, 2000  Solenoid, Central Preshower installed in central bore  A-layer MDTs installed on inner faces of end irons  Central muon system installed, being commissioned  South end calorimeter, end irons on sidewalk  North and south trusses in Hi Bay, being prepped for move to sidewalk  Central iron, north calorimeter in open positions to allow access  Shield wall up

DoE Review June 6-7, 2000 Current Detector Configuration June 6, 2000  South end calorimeter, end irons on sidewalk  A-layer MDTs installed on faces of end irons  Commissioning Level 1 trigger, muon system, online, silicon front-end, solenoid

DoE Review June 6-7, 2000 Install Fiber Tracker in Solenoid June 16-29, 2000  Fiber Tracker being installed in central bore  North A-layer pixel sheet mounted on shield wall  Commissioning of DAQ, online, central muon system, etc. continues

DoE Review June 6-7, 2000 Move Platform West, Pick Up End Irons July 11-28, 2000  Fiber Tracker installed, south end calorimeter back in place on platform  Platform moves west to pick up two end irons  Detector buttoned up for move  Commissioning interrupted until platform returns east (services disconnected)

DoE Review June 6-7, 2000 Move Platform West, Pick Up End Irons July 11-28, 2000  Platform moves west to pick up two end irons  Movable Counting House moves with detector during pick up  Assembled north A-layer pixel plane remains on shield wall

DoE Review June 6-7, 2000 North & South Trusses Move to Sidewalk July 31 – August 25, 2000  Platform returns to east position with end irons installed  North & south trusses, shielding brought down to sidewalks from Hi Bay, assembled  Detector remains buttoned up until trusses are down  Cabling of Fiber Tracker begins after south truss is in place  Platform services reconnected, commissioning resumes

DoE Review June 6-7, 2000 North & South Trusses Move to Sidewalk July 31 – August 25, 2000  Platform returns to east position with end irons installed  North & south trusses brought down to sidewalks  South calorimeter, end iron opens to allow cabling of Fiber Tracker  A-layer north pixel sheet mounted on shield wall, awaits installation

DoE Review June 6-7, 2000 A- & C-layer Pixels & MDTs Installed November 10, 2000  A- and C-layer detectors mounted  SMT-S installed, hooked up – SMT-N being installed  Trusses ready to install in Collision Hall  South calorimeter, end irons open to allow access to inter-cryostat region  Commissioning of CFT, SMT, Forward and Central Muon, attendant readout

DoE Review June 6-7, 2000 Trusses Installed in Collision Hall Nov 20 – Dec 11, 2000  North & south ends of shield wall removed, blocks stacked in Hi Bay  Loaded trusses rolled into Collision Hall, surveyed  Platform remains in Assembly Hall, rolled in after trusses in place  Commissioning of detectors on platform continues

DoE Review June 6-7, 2000 Trusses Installed in Collision Hall Nov 20 – Dec 11, 2000  Mounting of B-layer MDTs on outer faces of end irons near completion  North B-layer pixel plane assembled on shield wall  End cryostats/irons open as logistics allow  Cosmic ray commissioning & triggering using SMT, CFT, and muon

DoE Review June 6-7, 2000 Detector Rolled in and Hooked Up February 16, 2001  Platform rolled in to meet trusses  Full detector in final closed position: hooked up, ready for beam  Shield wall back up  Movable Counting House travels with detector, cable bridge down  Commissioning with cosmic rays continues until beam is delivered (March 1, 2001)

DoE Review June 6-7, 2000 Access to Detector in Collision Hall Closed Position - Data-TakingOpen Position - Detector Access Shielding retracted South calorimeter open North B-layer pixels open South end iron open North end iron closed

DoE Review June 6-7, 2000 Forward Muon B-Layer Installation May, 2000  End irons moved toward center of Assembly Pit to allow access for B-layer installation/surveying  Commissioning continues

DoE Review June 6-7, 2000 D0 Commissioning Timeline Commissioning/Integration Goals J F M A M J J A S O N D J F M D Run II begins: Mar 1, 2001 Roll in No LHe LAr Beam- ready #1 #3 #2 DAQ/online system running in user mode Integration Goal #1: dual muon crates, initial muon triggering/filtering, ship data to farm, run reconstruction, online event display Begin full central muon system, integrate Level 2 muon trigger at DAB test stand Silicon front-end installed/commissioned Forward muon C-layer MDTs/pixels installed/commissioned #6 #5 Forward muon A&B layer MDTs/pixels installed/commissioned Integration Goal #2: Initial triggering on L1 CFT/CPS, begin linking tracks in CFT/CPS/CMuon, begin Level 2 trigger integration Half of CFT, CPS hooked up, checked out #4 #9 #10 #11 Integration Goal #4: Full detector in steady- state Cosmic Ray Commissioning SMT, CAL fully added to commissioning chain, exercise full triggering with all major systems Integration Goal #3: Add Central Calorimeter to commissioning stream, most major systems being commissioned #8 #7

DoE Review June 6-7, 2000 Trusses Assembled on North & South Sidewalks July 21 – August 25, 2000  Detector returns to east position with end irons installed  Trusses brought down from Hi Bay to sidewalks  Central irons, calorimeters remain closed for movement of trusses  Hookup of Fiber Tracker begins after south truss is in position  Commissioning resumes, begin integration of CFT

DoE Review June 6-7, 2000 Current Detector Configuration Phase I  A-layer MDTs, Pixels being mounted, surveyed onto faces of end irons  C-layer truss and shielding has arrived in Hi-Bay, being dressed  Remainder of detector remains open for access

DoE Review June 6-7, 2000 Current Detector Configuration  Commissioning continues, using Central Muon as prototype system: u Multi-crate readout of full central muon system u Event monitoring, crate control, steady DAQ running, filtering u Exercise reconstruction, online event display (on cosmic ray muons)

DoE Review June 6-7, 2000 Forward Muon B-Layer Installation May-June, 2000  A-layer planes installed  B-layer MDTs, Pixels being mounted, surveyed onto faces of end irons  C-layer trusses and shielding continue to be dressed in Hi-Bay

DoE Review June 6-7, 2000 Install Fiber Tracker in Solenoid May, 2000  Fiber Tracker + Cart/I-Beam system lowered into gap between South End Calorimeter and Central Calorimeter  Rolled into solenoid bore along I-Beam Fiber Tracker Cart System

DoE Review June 6-7, 2000 EMCs Installed in Collision Hall December 11, January 11, 2001  Shield wall is broken down, moved to now free space in Hi-Bay  North and South C-layer trusses/shields, having been assembled on sidewalk, rolled into Collision Hall - surveyed into place  Detector will be rolled into place to meet trusses

DoE Review June 6-7, 2000 EMCs Installed in Collision Hall  Full Cosmic Ray Commissioning of all systems continues during most of this period  End irons, calorimeters can be opened for access

DoE Review June 6-7, 2000 Detector Rolled In, Hooked Up Phase III  Detector installed in compact space  Access to internal tracking detectors, end muon detector planes must be carefully coordinated

DoE Review June 6-7, 2000 South EMC Truss Moves to South Sidewalk November 29- December 5, 1999  South C-layer truss moves to south sidewalk  EMCs, shielding re-assembled on sidewalk to prepare for rolling in

DoE Review June 6-7, 2000 South EMC Truss Moves to South Sidewalk November 29- December 5, 1999  South C-layer truss moves to south sidewalk in two pieces, reassembled  Preparing to take down shield wall for roll in

DoE Review June 6-7, 2000 The DØ Upgrade Tracking System Charged Particle Momentum Resolution  p T /p T ~ p T = 10 GeV/c