Joint School District of Beloit Beloit City Council Meeting Monday, February 24, 2014.

Slides:



Advertisements
Similar presentations
City Council Presentation July 1, 2014 Parks & Recreation Master Plan.
Advertisements

The Schwan Regional Amateur Sports Center Results of Bids and Recommendation to Award Contracts for Construction February 10, 2015 City Council Meeting.
Harding Elementary School Exterior Repairs & Select Roofing Replacement 08/12/2014.
Alpha Borough Project Presented by Beta Solutions Dave Woodruff Crystalann Harbold Todd Baldwin Katie O’Connor Adam Brown.
Coronado Elementary School Project Status Update 05/13/14.
January 6. January 7 January 8 January 9 January 10.
MARIETTA MUNICIPAL COURT A presentation for MARIETTA CITY COUNCIL.
Welcome to the CY Middle School virtual tour! Click here for pictures of the main floor. Click here for pictures of the second floor.
FRED POWELL POWELL & PARTNERS, ARCHITECTS West Contra Costa Unified School District.
SCHEMATIC DESIGN PRESENTATION
Renovation Update Meeting: November 11, Phasing Plan: Currently working in Phase 5, Façade 6, and Crystal Palace.
Direction at your fingertips. A compass rose is a design on a map that shows directions. It shows north, south, east, west, northeast, northwest, southeast,
Help me find the cardinal directions
Alpha Borough Community Recreation Project Preliminary Design Presented by Group 3 February 28, 2002 From left to right: Pamela Vislocky, Erin O’Brien,
GRANT JOINT UNION HIGH SCHOOL DISTRICT Planning for the future preserving the past M A S T E R P L A N Conceptual Site Illustrative S O F T B A L L & P.
Scenes from Parsons Hall Renovation
Cleveland Heights – Neighborhood Meeting January 7, 2015.
Built in 1929, last remodel 1940 image at left shows current footprint (3 rd floor)
Architect Drawing of New Entrance. Location Location of Phase II Construction Project – Old tennis courts west of the existing building.
Schacht aslani architects P ENINSULA C OLLEGE library media center faculty administration building 100% Design Development 28 February 2006.
Adams-14 School District Facilities Master Plan Kearney Middle School Focused Site Evaluation SITE DRAINAGE OBSERVATIONS General – Site drainage was primarily.
Brentwood Union Free School District 2006 Bond Referendum Capital Improvement Program Pool Phase, Phase IA, II, III, and IV. April 28, 2008 Prepared by:
Existing Joint Use Agreements Agenda Item: 6A. Existing Agreements Currently three (3) Agreements between City and TCUSD: Agreement for Use of Facilities.
A presentation of The New Georgian Heights Alternative Elementary School for Columbus City Schools Board of Education 2 February 2010.
LOS ALAMOS COUNTY JUDICIAL / POLICE – JAIL COMPLEX 60% SUBMITTAL August 8, 2008.
ENERGY EFFICIENT HOUSE DESIGN UDC, Van Ness Campus Student Architects: Sarah Alexander and Roberto Martin.
Brentwood Union Free School District 2006 Bond Referendum Capital Improvement Program Pool Phase, Phase IA, II, III, and IV. August 2007 Prepared by:
Geography: The Study of Earth
Brentwood Union Free School District 2006 Bond Referendum Capital Improvement Program Pool Phase, Phase IA, II, III, and IV. November 5, 2007 Prepared.
March 2015 ALLEN INDEPENDENT SCHOOL DISTRICT School Board Meeting March 2015 Construction Update for the Service Center.
POWELL & PARTNERS, ARCHITECTS WCCUSD FACILITY SUB-COMMITTEE MEETING October 14, 2014.
WEST CONTRA COSTA UNIFIED SCHOOL DISTRICT HIBSER YAMAUCHI Architects DOVER ELEMENTARY Existing MPB (2/14/12)
Map Skills Review. How many Cardinal Directions are there? North South East West.
West Ox Bus Operations Center Fairfax County Department of Transportation July 21, 2015.
SunSatFriThursWedTuesMon January
Review of Proposed Changes January 14 th, 2014.
Joint Agreement for Use of Washington Middle School Gymnasium.
Continents, Oceans and Map Skills Review Game by Mr. Reece.
Convocation of Governments January 15, Sarabeth Kalajian, Director Libraries and Historical Resources Sarasota County Todd Bowden, Executive Director.
Projection, Distortion, Map Quadrants & Sandalwood Map Learning Objectives – Student understands map projection & distortion – Student understands map.
Baltimore City Department of Public Works. Design Notice to Proceed: October % Design Completed: July % Design Completion: November 2015.
City of Burbank Burbank Unified School District. Examples of Joint Projects:  Baseball field lighting.  Tennis court lighting.  Resurfacing of tennis.
Northpark Center Presented to the City Council April 14, 2009.
Primary Two football basketball badminton volleyball.
Concept Design Community Center Proposed Spaces New Construction63,000 SF – Gym Spaces13,500 SF – Fitness Center 9,000 SF – Walking Track 4,000 SF – Multipurpose.
Connecting Eastside and Victoria Leisure Centre - Update St Ann’s and Dales Area Committee Presentation September 2010.
SPORTS CONNECTION BUDGET REPORT Presented by Karen McKay, Director.
HOW BIG IS AN ACRE? 43,560 Square Feet
April 2016 Bond / Facilities Update Presentation
Aerial of the full site facing northeast taken on March 1, 2016.
Special Mention: Main Gymnasium Second Floor East: Technically Inaccessible Entrance Problems
Geography: The Study of Earth
Sunnyside School District Facility Advisory Team Meeting October 18, :30-8:00 PM Denny Blaine Board Room.
Baltimore City Department of Public Works
Inspire Elementary School
CHANNEL DISTRICT ACTION TEAM
Facilities Update November 17, 2017
21st Century School Buildings Plan
Board of Trustees Meeting
Map & Compass Skills.
DOVER ELEMENTARY Existing MPB (2/14/12).
2016 Exhibition of School Planning and Architecture
Sport, recreation and leisure facilities in Cononley
北 N north 西 W west 東 E east south南 S.
PROPOSED FACILITIES REFERENDUM
Humanities and Social Sciences Upper Level Northeast: Accessible Entrance
Mandeville Center Upper Level West: Interior Inaccessible Element
Maps & Map Keys.
Ward Park Restroom Timeline
Presentation transcript:

Joint School District of Beloit Beloit City Council Meeting Monday, February 24, 2014

 5 primary buildings ◦ Converse ◦ Robinson ◦ Hackett ◦ Todd ◦ Merrill  The Swimming Pool

 Cunningham Intermediate School  Gaston Primary School  Fitness Center  McNeel  Aldrich  Memorial

Update as of January 29, 2014

North-East Exterior Front View North-West Exterior Front View Architect Renderings

West Exterior View South-West Exterior View Architect Renderings

South-East Exterior View North-East Exterior View Architect Renderings

Site Layout

Sidewalk 4-6 Entrance 7/8 Entrance Plaza Dumpster Enclosure Hard Surface Play Storage Building 16 x 16 Site Plan

First Floor First Floor= 70,242 SF Second Floor= 30,214 SF Total= 100,456 SF

Second Floor First Floor= 70,242 SF Second Floor= 30,214 SF Total= 100,456 SF

 Site Clearing/Demolition: March/April 2014  Bid Date: April 17, 2014  Construction Start: April 30, 2014  Construction Complete: July 31, 2015

 Tennis Courts  Big Field between 6 th and 4 th  Scoreboards  New Storage for Football  Propane Tank outside of Swimming Pool