A tour of the integration between Macola ES / Progression and Preactor V11 Preactor.

Slides:



Advertisements
Similar presentations
Leveraging an Integrated ERP and CRM System - Featuring Sage MAS 500 ERP and Sage SalesLogix CRM.
Advertisements

Split Databases. What is a split database? Two databases Back-end database –Contains tables (data) only –Resides on server Front-end database –Contains.
SFA Inventory Scanning Fortune 500 client Footwear and Apparel Company in US Currently running Next Gen SFA Application which is a full fledged web based.
Softricity LLC Advance slides with arrow keys. Without PDMLynx Informal processes based upon excel, access, paper files No consistency across organization.
DIGIDOC A web based tool to Manage Documents. System Overview DigiDoc is a web-based customizable, integrated solution for Business Process Management.
TCP Monitor and Auto Tuner. Need Analysis Enable monitoring of TCP Connections Enable maximum bandwidth utilization No such utility available in MONALISA.
SmartConnect Integrations
What is New in Inventory & Purchasing? Presented by: Derek Kratz.
DSX / Video Insight Driver Interface. Prerequisites for Video Insight DVR: 64 Bit Operating System (Windows 7 or equivalent) SQL Server 2008 R2 (Please.
Merit Consulting Terje Myrseth MUA – October 2008.
PROFITABLE INVENTORY CONTROL SYSTEMS Your Complete Software System Integrator VICSSQL – Visual Inventory Control System – SQL.
Functional Applications Chapter Extension 8. ce8-2 Study Questions Copyright © 2014 Pearson Education, Inc. Publishing as Prentice Hall Q1: What is the.
GREENSSOFT. Profile Greensoft is a software company based at Kochi, Kerala, India. Being in the field since 2001, it has a group of young developers,
SERVING CORPORATES AND INDIVIDUALS ©2012 BUSINESS REPORTING MANAGEMENT SERVICES, INC WELCOME.
Microsoft Dynamics NAV 2009
E-commerce vs. E-business
Enterprise Systems.
POKOK BAHASAN Pertemuan 24 Matakuliah: Sistem Informasi Manajemen Tahun: 2008.
Navision Business Analytics Joyce Leung, Partner Technology Specialist.
ACCOUNTING INFORMATION SYSTEMS
RBNetERP or Enterprise Resource Planning is a software that allows companies to integrate all their operations and resources and manage them through one.
Production Scheduling: What Tool is Right for You?
November 11 th 2013 Preactor and Sage ERP integrated as never before. Defacto Solutions Limited sl-ect Limited.
Operations Planning Horizons
SAGE USER ODI MAY 15 TH 2013 Defacto Solutions Limited sl-ect Limited.
MATERIAL REQUIREMENTS PLANNING (MRP) AND ERP Chapter 14 1.
Installation and Administration
2006 Palisade User ConferenceNovember 14 th, 2006 Inventory Optimization of Seasonal Products with.
Chapter 2 – Enterprise Systems
© VESP International Pty Limited To Contents Slide CLICK to advance slides/ bullet points within slides Integrated Master Planner An Overview.
Copyright © 2006, SAS Institute Inc. All rights reserved. What Is New in SAS Profitability Management (PrM) 2.1? Authors: Jack Zhang Solution & Version:
Irwin/McGraw-Hill Copyright © 2004 The McGraw-Hill Companies. All Rights reserved Whitten Bentley DittmanSYSTEMS ANALYSIS AND DESIGN METHODS6th Edition.
SAP Overview SAP? Company ERP Software package –R/2 –R/3.
MIS3300_Team8 Service Aron Allen Angela Chong Cameron Sutherland Edment Thai Nakyung Kim.
SMS 2003 Deployment and Managing Windows Security Rafal Otto Internet Services Group Department of Information Technology CERN 26 May 2016.
(c) 2005 Donald R. Frey & Company Inc. InternetInquiryandPaymentProcessingModule Presented By: Matt Frey.
ABC Manufacturing Demonstration of Attendance Enterprise.
DAY 12: DATABASE CONCEPT Tazin Afrin September 26,
A tour of the integration between Macola ES / Progression and Preactor V11 Preactor.
Introduction to the Adapter Server Rob Mace June, 2008.
Computerised Business Systems, Inc. Charlie G. Hinders President Softwar e Solutions FOR THE TELECOMMUNICATIONS INDUSTRY.
Is Your Business Ready For The Ultimate Business ERP Solution.
Paul Butterworth Management Technology Architect
Ch 14 QQ T F 1.A database table consists of fields and records. T F 2.Good data validation techniques can help improve data integrity. T F 3.An index is.
- Exploring Needs - ERP SOLUTION A Brief Look ”Provide competitive advantage to our clients through the implementation of our business enterprise information.
Apple Inc ISO. Organisation chosen Apple Store The company designs, manufactures and markets personal computers, portable digital.
Material Requirements Planning. Materials requirements planning (MRP) is a means for determining the number of parts, components, and materials needed.
David Van der Grient Research Assignment BUS 2302.
Built with your workers in mind.
E-commerce Architecture Ayşe Başar Bener. Client Server Architecture E-commerce is based on client/ server architecture –Client processes requesting service.
ATUL PATANKAR [ ASUG INSTALLATION MEMBER MEMBER SINCE: 2000 LINDA WILSON [ ASUG INSTALLATION MEMBER MEMBER SINCE: 1999 JUERGEN LINDNER [ SAP POINT OF CONTACT.
CH-8-Resource Planning Assist Prof Banu OZKESER December, 2015.
Managing multiple projects or services? Have a mix of Microsoft Project and more simple tasks? Need better visibility and control?
Accounting Guru Cloud ERP (Enterprise Resource Planning) ERP Software https:
AXUG Partner Showcase – Introducing Preactor
Functional and Enterprise Systems
SAP Overview.
Enterprise Processes and Systems
Sage (Accpac) Partner since 1999 Sage Gold Development Partner
Microlinks® Welcome Greetings Thank you for choosing Microlinks®.
Enterprise Resource Planning
Navision Business Analytics
Functional and Enterprise Systems
Traceability of Gas Pipeline Materials Research & Materials Manager
Warehouse Management System Shop Floor Work Center Reporting
Nancy McCrimmon – 32 Soft Inc.
CAD DESK PRIMAVERA PRESENTATION.
Set Up For Success : Reviewing Manufacturing Best Practices
SCM Master Data - 2 Master Data for Distribution & Production Processes EGN 5346 Logistics Engineering Fall, 2015.
Presentation transcript:

A tour of the integration between Macola ES / Progression and Preactor V11 Preactor

Since 1984, Business Computer Technologies, Inc. has recognized the importance of utilizing current technology within the business processes of companies in the manufacturing and distribution markets. BCT also recognized that in order to provide the best solutions, we needed to have the fundamental skills that enable us to pass on knowledge to the customers we serve. We continue to deploy this business philosophy through the implementation and support of back-office and add-on solutions that provide the highest level of ROI for our customers. In 2003, BCT partnered with Preactor International and Quinn & Associates to provide integration to a World Class Finite Capacity Graphical Scheduling system to our clients.

BCT Preactor Interface v11 The BCT Preactor Interface provides a complete interface between Macola ES / Progression (SQL) and the Preactor V11 Graphical Finite Capacity Scheduling system. The BCT Preactor Interface is bi-directional movement of data. Initially, we draw upon the current orders in the Production Order or Production Order modules, then the production planner is allowed to fine tune the schedule to match your needs, and lastly the information is updated in Macola. Download Touch PointsSmart Material PeggingUpload Touch PointsConfiguration Options

Preactor

Download to Preactor Touch Points Information that is utilized from the Production Order records when creating records in Preactor.

Download to Preactor Touch Points Information that is utilized from the Production Order captured Bill of Material records when creating records in Preactor.

Download to Preactor Touch Points Information that is captured from the Preactor uploads to assist in maintaining the continuity of prior finite capacity plans.

Preactor

Smart Material Pegging Manufacturing order operation’s earliest start date is established from the material availability. Materials that can be pegged from current inventory stock levels are assigned an earliest start date of today. Materials that can be pegged from purchase orders are assigned an earliest start date from the request / promised date. Remaining materials are assigned an earliest start date from today’s date plus the PO Lead time. Smart Material Pegging Qty on Hand Purchase Order Lead Time Earliest Start Date Purchase Orders

Preactor

Upload from Preactor Touch Points Information that is utilized from Preactor to update the Macola ES / Progression Production Order records.

Upload from Preactor Touch Points To allow the information to be captured for future Preactor schedules

Preactor

Configuration Options General Options: - ERP Software - Preactor Version

Configuration Options Download Options: - Upload locked operations - Download BOMs - Exclude operations X days in the future - Resources - Resource Groups - Secondary Constraints Hours Selection: - Labor Hours - Machine Hours - Greater of Labor or Machine Hours

Configuration Options Upload Options: - Update Start Dates on Production Order records - Update Due Dates on Production Order Header records

Configuration Options SQL Server Options: - Server - Integrated Security - User name - Password - Database

Configuration Options Macola Download Options: - Include Unreleased Orders - Start Date from material availability rather than from the operation start date - Select warehouses Macola Upload Options: - Update Production Order User Defined Fields with original scheduled dates - Export Preactor Material Pegging information to u_BCT_Preactor_Pegging table

Configuration Options Resource Group Resource Location VAC Type Location VAC Type None

BCT Preactor Interface V11 The BCT Preactor Interface is the bridge that connects your Macola ES / Progression system with the most advanced finite capacity scheduling system in the world.