2013 Northwest Hydro Operators Forum 11 FERC’s Expectation for EAPs David Lord, P.E., D2SI Dam Safety Risk team – Portland, Or Natural Hazards: Events.

Slides:



Advertisements
Similar presentations
Museum Presentation Intermuseum Conservation Association.
Advertisements

From Flooding to Drought Barbara Watson Meteorologist-in-Charge National Weather Service Binghamton Forecast Office.
Fire Emergency Plan Lesson on Fire Emergency Plan.
Jon Keeling, PE, CFM Carey Johnson, CFM ASFPM 2012 Conference May 22, 2012 The Mission of Dam Safety Hazard Mitigation – Kentucky’s Experience.
2013 Northwest Hydro Operators Forum 1 Risk-Informed Decision Making – FERC Perspective David Lord, P.E., D2SI Dam Safety Risk team – Portland, Or Natural.
Planning for the Future Disaster Recovery Plan / Business Continuity Plan Jim Zukowski, Ed.D. Texas State Board of Dental Examiners 2006 Annual ConferenceAlexandria,
Public Health Seattle & King County Incident Command System Overview May 2004.
DENR Disaster Response Center Purpose Purpose Activation Activation Operation and Responsibilities Operation and Responsibilities Phases of Response Phases.
Presentation Retail Security Key Holding Mobile Patrols Access Control Systems Manned Security Receptionist CCTV Monitoring.
Integrated Risk Management and Risk Communications David DeGagne, Executive Director Centre for Risk Management Tel: Fax: Web:
A Review of the Whittenton Dam Crisis Nicole M. Belk Senior Service Hydrologist NWS Weather Forecast Office, Taunton, MA David R. Vallee Hydrologist-in-Charge.
Major Emergency Management - the Clare experience Gerard Dollard Director of Services CFOA Annual Conference 2010.
Phone: Fax: Emergency Mgmt.: Fire Safety: 15 Edgewood Avenue Atlanta, Georgia website:
US NRC Protective Action Recommendation Study National Radiological Emergency Preparedness Conference April 10, 2008 Las Vegas, NV Randy Sullivan, CHP.
City of Radcliff Preparing for Weather Emergencies.
1 MANUFACTURING AND PRODUCTION OF BIOLOGICAL PRODUCTS (ERT 455) HAZARD ANALYSIS AND CRITICAL CONTROL POINT (HACCP) SYSTEM Munira Mohamed Nazari School.
Emergency Plan GENERAL AWARENESS TRAINING. Aim To provide staff with an overview of the school emergency plan.
ONLINE SELF-STUDY Emergency Coordinator Annual Update.
Operational risk management Margaret Guerquin, FSA, FCIA Canadian Institute of Actuaries 2006 General Meeting Chicago Confidential © 2006 Swiss Re All.
Captain Brent Denny Public Safety  Police Department ◦ Patrol ◦ Detectives ◦ 24 sworn police officers ◦ 7 Administrative Staff ◦ Community Service.
StormReady Frank Revitte Warning Coordination Meteorologist NWS New Orleans/Baton Rouge Area (located in Slidell LA) Louisiana OHSEP Director’s Meeting.
WORK HEALTH AND SAFETY ACT IMPLICATIONS FOR SMALL BUSINESS
Community Warning System A partnership of industry, media and the public to warn and inform our community in the event of an emergency.
Business Continuity Check List PageOne. - Why Does Your Business Need A Continuity Checklist? Should the unexpected occur, your business will be able.
The Quality Management System
Preventing and Managing a Crisis. Overview This session will cover how to: Develop a crisis communications plan Prevent crises Prepare for crises Implement.
Unit 2: ICS Overview. Unit Objectives  Identify three purposes of the Incident Command System (ICS).  Identify requirements to use ICS.
National Public Health Performance Standards Local Assessment Instrument Essential Service:3 Inform, Educate, and Empower People about Health Issues.
Emergency Action Plans Miriam Gradie Anderson Planning Specialist 608/ Wisconsin Department of Natural Resources.
Incident Reporting Procedure
Kanawha County’s Emergency Preparedness Plan. Planning is bringing the future into the present so you can do something about it now. Alan Lakein Time.
A Major Business Disruption A Strategy for Minimising the Downtime Anthony Hegarty Mitigating Risks.
Dam Hazard Consequences Assessment
DPG HEALTH MEETING USAID CONFERENCE ROOM 6 NOVEMBER 2013 International Health Regulation (2005)
Emergency Action Plan and Response Training
1. Objectives  Describe the responsibilities and procedures for reporting and investigating ◦ incidents / near-miss incidents ◦ spills, releases, ◦ injuries,
PARENT NOTIFICATION SYSTEMS School District Planning Considerations Planning Considerationsfor Implementing and Activation.
Preparing for Disasters General Liability. Introduction  The one coverage that provides you and your business the most protection is General Liability.
Arkansas Natural Resource Commission 2015 Accreditation Workshop.
Emergency Action Plans for Dams in Texas An EMC’s Role With The EAP Presented By: Megan Dutton, P.E. TCEQ Dam Safety Program.
Event Management & ITIL V3
ASSURANCE PINNACOL ASSURANCE Wants you to know about : EMERGENCY/DISASTER PREPAREDNESS.
2013 NWHA CONFERENCE FERC’S RISK-INFORMED DECISION MAKING Doug Johnson – Regional Engineer - Portland From PFMA to Risk Assessment.
Learning Objective 1 Explain the procedures for receiving emergency and nonemergency external communications.
STRATIFICATION The aim of stratification is to segment non-custodial parents based on their ability and willingness to support their children, and to use.
Emergency Response Worker Health & Safety Training Interagency Communications.
Building Human Resource Management SkillsNational Food Service Management Institute 1 Crisis Management Procedure and Practice Objectives At the completion.
US Army Corps of Engineers BUILDING STRONG ® Overview of Risk Approach to Manage USACE Dam and Levee Safety Program The Reality of Risk: Dam Safety in.
1 Flooding Turn Around, Don’t Drown Brian Koeneke WFO Jackson.
Saving lives, changing minds. Presentation title at-a-glance info (in slide master) SEA Climate Change Training Presentation title at-a-glance.
OREGON IDAHO WYOMING COLORADO NEVADA NEW MEXICO TEXAS UTAH ARIZONA CALIFORNIA Rene Vermeeren, P.E., D.WRE Chief, Hydrology and Hydraulics Branch Los Angeles.
Revision N° 11ICAO Safety Management Systems (SMS) Course01/01/08 Module N° 9 – SMS operation.
Disaster Preparedness Are you prepared?. Effective Disaster Plans  Your plan should outline the basic preparedness steps needed to handle the anticipated.
S3.1 session day 3 1 training delivered by Oxfam GB, RedR India and Humanitarian Benchmark; January 2012, Yangon, Myanmar approved by the Advisory.
Reservoirs – Emergency Planning Workshop Image courtesy of HR Wallingford.
RISK MANAGEMENT FOR COMMUNITY EVENTS. Today’s Session Risk Management – why is it important? Risk Management and Risk Assessment concepts Steps in the.
Cross Industry E-Reps Forum Increasing Environmental Awareness and the role of the E-Rep 21 November 2012.
To Learn & Develop Christine Johnson Lead Nurse Safeguarding (named nurse) - STFT Health Visitors Roles and Responsibilities in Domestic Abuse.
Response to an Emergency Training for 211 Staff in Ontario Updated September
PUT A PLAN IN PLACE.  What should we do to prepare our trainee and their families or care providers?
International Atomic Energy Agency Implementation of a Risk-Informed Approach into the Legislative and Regulatory Framework SNRCU Annual Topical Meeting.
Emergency Preparedness. Proposed Emergency Preparedness Rules NFR/LMC §19.326(a) deleted and moved to § for Emergency Preparedness Rules Places.
Evacuation Procedures City Council October 20, 2015.
Water Predictions for Life Decisions
When you are in an unfamiliar situation, like an emergency or disaster, it’s hard to know what to do. Bad information or not enough information can lead.
Flooding Walkdown Guidance
Essentials of Fire Fighting Chapter 3 — Fire Department Communications
Business Continuity Program Overview
Crisis Planning at Michigan Tech
Disaster Recovery Operations
Presentation transcript:

2013 Northwest Hydro Operators Forum 11 FERC’s Expectation for EAPs David Lord, P.E., D2SI Dam Safety Risk team – Portland, Or Natural Hazards: Events and Response

22 FERC Regulates 2948 Dams and Project Structures

High Hazard Potential 234 Significant Hazard Potential

4 EAP Planning The FERC EAP program is recognized across the world. The FERC EAP program is recognized across the world. The program depends on effective training of all participants, adequate communication with first responders, and adequate testing of all parts of the EAP. The program depends on effective training of all participants, adequate communication with first responders, and adequate testing of all parts of the EAP. Continued enthusiastic participation of owners is essential to the success of the EAP program. Continued enthusiastic participation of owners is essential to the success of the EAP program. 4

5 EAP Enhancement Initiative Requirement of all high and significant hazard potential dam owners: Include in the EAP a more detailed description of your operating plan during high flow events

6 EAP Enhancement Initiative Why did FERC begin this initiative? During recent storm events FERC received inquiries from several Licensees asking what pre-emptive steps they could undertake to ensure their dams safely passed the expected flood flows. We wanted to ensure that all Licensees are prepared ahead of storm events to avoid unnecessary complications during the events. During recent storm events FERC received inquiries from several Licensees asking what pre-emptive steps they could undertake to ensure their dams safely passed the expected flood flows. We wanted to ensure that all Licensees are prepared ahead of storm events to avoid unnecessary complications during the events. Make sure Licensees have a well thought out operating plan to safely pass flood flows Make sure Licensees have a well thought out operating plan to safely pass flood flows Improve communication to reduce post flood event complaints Improve communication to reduce post flood event complaints

7 1.Essential operations before, during, and after flood flows reach your project. 2. A general overview tying project discharges to EAP notification procedures. 3. For projects that are remotely operated, describe what triggers sending staff to a project and at what point personnel are to be physically present at a site. 4. If the reservoir is to be drawdown describe coordination you will undertake with the resource agencies. 5. Establish trigger for discharges exceeding bank flows and when notifications are to be given to emergency responders. EAP Enhancement Initiative Key Aspects Described in EAP

8 TIME SENSITIVE EAPS INITIATIVE Sudden-Failure Assessment Sudden-Failure Assessment Sudden/Unexpected Failure During Off- HoursSudden/Unexpected Failure During Off- Hours Focus on First Downstream ResidentFocus on First Downstream Resident Conservative Method (?)Conservative Method (?)

9 METHOD FOR ASSESSING TIME SENSITIVE EAPS Determine Time to Impact Determine Time to Impact Determine Dam Owner’s Response Time Determine Dam Owner’s Response Time Detection TimeDetection Time Verification TimeVerification Time Notification TimeNotification Time Get Estimate of EMA’s Response Time Get Estimate of EMA’s Response Time Calculate Excess Response Time Calculate Excess Response Time Assess Results Assess Results

10 SUDDEN FAILURE ASSESSMENT Time to Impact

11 SUDDEN FAILURE ASSESSMENT Detection Time Amount of Time after Failure Begins until Dam Owner is Aware of Problem Amount of Time after Failure Begins until Dam Owner is Aware of Problem Typically Triggered by Instrument Typically Triggered by Instrument Assume Non-Working Hours Assume Non-Working Hours Based on Test of System Based on Test of System

12 SUDDEN FAILURE ASSESSMENT Verification Time Amount of Time to Verify Problem at Dam, Once Problem Has Been Detected. Amount of Time to Verify Problem at Dam, Once Problem Has Been Detected. In Person, Cameras, Redundant Instruments In Person, Cameras, Redundant Instruments Assume Non-Working Hours Assume Non-Working Hours Based on Test/Drill Based on Test/Drill

13 SUDDEN FAILURE ASSESSMENT Notification Time Amount of Time to Notify EMA After Problem is Verified Amount of Time to Notify EMA After Problem is Verified Includes Discussions Between Dam Owner Personnel before EMA Called Includes Discussions Between Dam Owner Personnel before EMA Called Based on Annual Drill/Call Down Test Based on Annual Drill/Call Down Test

14 SUDDEN FAILURE ASSESSMENT EMA’s Response Time Amount of Time the EMA needs to Warn and/or Evacuate Critical Residences Amount of Time the EMA needs to Warn and/or Evacuate Critical Residences Based on Input from EMAs during Annual Orientation/Meeting Based on Input from EMAs during Annual Orientation/Meeting

15 SUDDEN FAILURE ASSESSMENT Assess Results EnhancementTime Parameter Impacted Benefit Adjust trigger points on headwater/tailwater levels. DetectionQuicker detection. Install internet-accessible cameras pointed at headwater and tailwater staff gages. VerificationEliminates drive to dam to verify emergency. NotificationAllows project manager to activate EAP without talking to operator. Provides redundancy if operator is unavailable. Operator will contact EMA directly if failure is evident. NotificationAllows operator to activate EAP without talking to project manager. Provides redundancy if project manager is unavailable. Create Pre-Scripted Messages for Project Manager/Operator to inform local EMA of emergency. NotificationAllows project manager/operator to give EMA all information they would need as quickly as possible.

16 SUDDEN FAILURE ASSESSMENT Assess Results StepTime ParameterTime (min) ATime to Impact30 BDetection Time10 CVerification Time5 DNotification Time5 EDam Owner’s Response Time (B + C + D) 20 FEMA Response Time20 GExcess Response Time (A – (E + F)) -10

17 1.Large Negative Excess Response Time - the dam owner should be able to improve their detection, verification, & notification. 2.Time to Impact is very small (0-15 minutes) – the residents will be aware of failure before dam owner. 3.For these cases, coordinate with EMA to develop public education. What We Are Finding…

18 Tighten existing HW/TW alarm set points. Install new remote monitoring systems. Thermal imaging to detect breach Solar-powered instruments POSSIBLE ENHANCEMENTS Detection Time

19 POSSIBLE ENHANCEMENTS (CONT) Verification Time Install redundant/independent alarms. Install remote access cameras. Install lights on gages Verify high flows with USGS Gage/National Weather Service. Get non-employee that is closer to verify problem (e.g., local police).

20 Streamline Internal Procedures (Notification Flow Chart). Add Redundancy to Callers. Preliminary Notification of EMAs Develop Pre-Scripted Messages. Use dam-owner controlled Reverse 911 system to notify several agencies at once. POSSIBLE ENHANCEMENTS (CONT) Notification Time

21 Use reverse 911 system to notify residents.Use reverse 911 system to notify residents. Use system to send text messages to residents.Use system to send text messages to residents. Install sirens.Install sirens. Provide NOAA radios.Provide NOAA radios. Dam Owner Agrees to warn people directly.Dam Owner Agrees to warn people directly. POSSIBLE ENHANCEMENTS (CONT) EMA Response Time

22 Dam Owner should coordinate with EMA about providing public education.Dam Owner should coordinate with EMA about providing public education. Annual flier/letter? Signs?Annual flier/letter? Signs? What should people do if river is unexpectedly high and rising?What should people do if river is unexpectedly high and rising? What to do if get Reverse 911 call or hear siren?What to do if get Reverse 911 call or hear siren? PUBLIC EDUCATION

23 CAMPGROUND EDUCATION

24 RESIDENT EDUCATION

25

26

27 EXAMPLE LETTER Our records indicate you live near the White River near Blackstone Dam. Although the dam is safe, it’s possible that high flows or problems at the dam would call for evacuations. (1)If the river is unexpectedly high and rising, call 911 and move to high ground (Main Street near the Burger Shack). (2)Do not walk or drive through moving/deep standing water. If there is no safe escape from your house, go to upper floors and call 911. (3)Your phone number is in the White County automated warning system. If you receive an automated message about high flows – follow the directions in the message. If you have any questions, call Joe Rogers of the White County Emergency Management Agency at (201)

28 EXAMPLE LETTER Our records indicate you live near the White River near Blackstone Dam. Although the dam is safe, it’s possible that high flows or problems at the dam would call for evacuations. (1)If the river is unexpectedly high and rising, call 911 and move to high ground (Main Street near the Burger Shack). (2)Do not walk or drive through moving/deep standing water. If there is no safe escape from your house, go to upper floors and call 911. (3)Your phone number is in the White County automated warning system. If you receive an automated message about high flows – follow the directions in the message. If you have any questions, call Joe Rogers of the White County Emergency Management Agency at (201)

29 Hebgen Incident At Hebgen, several issues were of interest. At Hebgen, several issues were of interest. The year before the stoplog failure in 2008, PPL-Montana found that the dam failure alarm lacked a long-distance telephone access, which would have prevented the alarm from making call-outs. The year before the stoplog failure in 2008, PPL-Montana found that the dam failure alarm lacked a long-distance telephone access, which would have prevented the alarm from making call-outs. During the incident, the call-outs to 24 hour centers were made, but no one answered. During the incident, the call-outs to 24 hour centers were made, but no one answered. The trading desk did not recognize this as a call to respond to and the main generation desk lacked an answering machine for bathroom breaks, etc. The trading desk did not recognize this as a call to respond to and the main generation desk lacked an answering machine for bathroom breaks, etc.

3030 Risk-Informed Decision Making (RIDM) Program In 2002, D2SI established a Potential Failure Modes Analysis (PFMA) program for all high and significant hazard (HSH) dams. In 2009, the Commission adopted a strategic plan to develop a probabilistically oriented program, titled Risk-Informed Decision Making (RIDM). D2SI recently has initiated development of RIDM engineering guidelines. Drafts of some guidelines are to be completed by September 2013.

31 Tolerable Risk Concepts 31

3232 Risk-Informed Decision Making (RIDM) Decisions are made by using a chart that compares F (the likelihood of failure) to N (the PLL) Decisions are made by using a chart that compares F (the likelihood of failure) to N (the PLL) The fN (or FN) charts have a one to one relationship between frequency and PLL for societal risk The fN (or FN) charts have a one to one relationship between frequency and PLL for societal risk

3333 USACE Societal Tolerable Risk Chart

34 Emergency Action Planning Risk is a combination of likelihood of dam failure and consequence. Risk is a combination of likelihood of dam failure and consequence. There are two ways to reduce risk; reduce the likelihood of dam failure and reduce the consequences. There are two ways to reduce risk; reduce the likelihood of dam failure and reduce the consequences. Dam safety professionals have primarily focused on reduce the likelihood of failure, but need to recognize how the other half of the equation reduces risk. Dam safety professionals have primarily focused on reduce the likelihood of failure, but need to recognize how the other half of the equation reduces risk. 34

35 Emergency Action Planning EAP planning has primarily been focused on responding to unforeseen events EAP planning has primarily been focused on responding to unforeseen events However, good EAPs also reduce the consequence risk, as I will explain in a minute However, good EAPs also reduce the consequence risk, as I will explain in a minute Let’s look back at one of the tolerable risk guidelines currently being used (Slide 34). Let’s look back at one of the tolerable risk guidelines currently being used (Slide 34). 35

36 Consequence (PLL) Risk Another factor in improving our EAP planning is to more properly identify where the potential life loss (PLL) risk is. Another factor in improving our EAP planning is to more properly identify where the potential life loss (PLL) risk is. Knowing where the risk is will improve both the EAP program and help owners better understand the risks inherent with owning dams. Knowing where the risk is will improve both the EAP program and help owners better understand the risks inherent with owning dams. 36

37 Aerial Photo of Priest Rapids Dam Priest Rapids Project, P-2114 (Courtesy of Grant County PUD) 37

38 Aerial Photo of Priest Rapids Dam Google Earth Wanapum Village Right Embankment 38

39 Village Wanapum Village 39

40 Wanapum Village 40

41 Conclusions EAP Planning is essential to improving the life safety risk below dams. Non-failure risks need to receive adequate planning. Planning for time-sensitive potential dam failures is essential 41

42 Conclusions Dam failure alarm systems should be adequately tested Owners should develop a full understanding of the potential life loss from a dam failure. Pre-planning for early intervention during a dam incident could effectively reduce the likelihood of dam failure. 42